Annexure-PFR File

Annexure-PFR File

PRE-FEASIBILITY REPORT FOR ORDINARY EARTH EXCAVATION PROJECT (Earth from 0.6313 Ha of property out of the Total extend 1.8415 Ha) At:Edakattuvayal Village Re-Survey No.10/3 Panchayath: Edakkattuvayal Taluk:Kanayannoor Dist.: Ernakulam OF Mr. Vinyakumar & Mrs Sindhu Vinayakumar Painakiyil house, Civil Station Road, Kakkanad, Kochi-30 Prepared By: Nazer Ahamed K. V (RQP) Vinayakumar & Sindhu Vinayakumar (Applicants): INDEX Contents 1. Executive Summary 2. Introduction of the Project / Background Information 3. Project Description 4. Site Analysis 5. Planning Brief 6. Proposed Infrastructure 7. Rehabilitation and Resettlement (R & R) Plan 8. Project Schedule & Cost Estimates 9. Analysis of Proposal FORM - IM (I) Basic Information S.No. Item Details 1 Name of the Mining Lease site Painakkiyil Site in Edakkattuvayal Village 2 Geo Cordinates Lattitude Longitude 1. 9° 52'52.93"N 76°25'53.75"E 2. 9° 52'52.47"N 76°25'56.42"E 3. 9° 52'50.17"N 76°25'55.11"E 4. 9° 52'49.98"N 76°25'55.26"E 5. 9° 52'48.59"N 76°25'53.63"E 6. 9° 52'50.45"N 76°25'53.64"E 7. 9° 52'50.67"N 76°25'53.67"E 3 Size of the Mining Lease 0.6313Area –Ha. 4 Capacity of Mining lease (t) 20000 M3 5 Period of mining lease 1 Years 6 Expected Cost of the Project Rs.10 Lakhs 7 Contact Information Vinaya Kumar & Sindhu Vinayakumar Painackiyil House Civil Station Road, Kakkanad P. O Ernakulam-682030 (II) Environmental Sensitivity Areas Distance in Kilometers Details S.No. 1 Distance of project site from nearest rail or The nearest Railway Line is Kottayam-Ernakulam- road bridge over the concerned River, is at a distance of 3 Km from the site Rivulet, Nallah etc. 2 Distance from the infrastructural Facilities 1.National Highway NH-85-20 K M 2.State Highway SH 41 -15 K M 3.Major District Road Ernakulam _ Piravom Highway-3 Km 4.Any Other Road Edakkattuvayal road-580 mtr 4. Electric Transmission line pole or Arakkunnam Tower 5.Canal or check dams or reservoirs Nadakavu around 5km away from proposed site or lake or ponds 6.Intake for drinking water pump Arakkunnam-3 Km. Required water for drinking purpose is being provided form the wells drilled at house least area. 7.Intake for irrigation canal pumps Arakkunnam-3 Km. Nearby wells and ponds from surrounding lands. 3 Areas protected under international No such important or sensitive for ecological reason conventions, national or local legislation for within 5 km from the lease area. their ecological, landscape, cultural or other related value 4 Areas which are important or No such important or sensitive for ecological sensitive for ecological reasons - reason within 5 km from the lease area. Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 5 Areas used by protected, important or No such important or sensitive for ecological reason sensitive species of flora or fauna for within 5 km from the lease area. breeding, nesting, foraging, resting, over wintering, migration 6 Inland, coastal, marine or There are no marine and underground waters are underground waters occurred in the mine area 7 State, National boundaries There is no state / National boundaries are near by the mine area. 8 Routes or facilities used by the public for No routes or facilities are available in the lease area access to recreation or other tourist, pilgrim which is used for recreation or other tourist, pilgrim areas areas. 9 Defense installations The area is not located close to any of the defense installation. 10 Densely populated or built-up area, distance The nearest city Arakkunnam & Edakkattuvayal which from nearest human habitation is 2.0 Km from Proposed Site . 11 Areas occupied by sensitive man- The city Arakkunnam is nearest made land uses (hospitals, area for all infrastructure facilities like, schools, places of worship, Schools, Primary Health Centers, Post office community facilities) etc. 12 Areas containing important, high quality or scarce resources (ground water resources, No river is flowing through the lease. Hence no impact is surface resources, forestry, agriculture, anticipated. fisheries, tourism, minerals) 13 Areas already subjected to pollution or environmental damage. (those where None existing legal environmental standards are exceeded) 14 Areas susceptible to natural hazard which could cause the project to present environmental problems(earthquakes, subsidence, None landslides, erosion, flooding or extreme or adverse climatic conditions) 15 Is proposed mining site located over or near None fissure / fracture for ground qwater 16 Whether the proposal involves approval/clearance under: if yes, details of the same and their status No to be given. i. The Forest (Conservation) Act, 1980. ii. The Wildlife (Protection) Act, 1972. iii. The C.R.Z. Notification, 1991 17 Forest land involved No 18 Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project I do make this Solemn Declaration this the 18th day of March 2018 believing the same to be true to the best of my knowledge and belief. Prepared By Nazer Ahamed K. V (RQP) Vinayakumar & Sindhu Vinayakumar (Applicants): 1. EXECUTIVE SUMMARY : Location: Ordinary Earth Excavation site of Edakkattuvayal Village- Vinayakumar & Sindhu Vinayakumar site is located near Edakkattuvayal Road and 500 mtr away from Peppathy- Arakkunnam- Kanjiramattom Road in Edakkattuvayal Village, Kannayannoor Taluk, Ernakulam Dist. It is about 25 km away from District Headquarter Ernakulam. Site is well connected to Piravom-Nadakkavu- Ernakulam highway which connects district headquarters at Ernakulam. Project site is about 5 Km from Mulanthuruthy Railway Station. Drainage system in the region is dendritic. Surface runoff water in the region will be discharged to the natural drainage course. General Details: Extracting ordinary Earth from 0.6313 Ha of property out of the Total extend 1.8415 Ha of property under the possession of the Applicants, Comprised in survey no.10/3 in Edakkattuvayal Village, Kanayannoor Taluk. The subject area is away from public properties and there is no objection of the public (consent from adjacent land owners is also encloses with additional attachments) or any litigation also keeping the lateral support from adjacent properties and maintain the bench formation will be done while excavations of ordinary earth. Owing to its massive nature, durability, ease of handling, availability in close proximity to construction sites and low cost, the ordinary earth are in demand for several construction purposes. Ordinary earth are used in almost any type of construction activity. It is also the most important input in domestic activity. Further they are also required by railway projects for track laying and other construction activities. Thus in current times, where the focus of the governments is on improvement of basic infrastructure like roads, railways, dams and other social infrastructure – both in rural and urban areas , there is a constant need for ensuring regular supply of these minor minerals. As per Environmental Impact Assessment Notification dated 14th September, 2006, and subsequent amendments thereof, this project falls under Category “B2” of the list of the Project or activities requiring environmental Clearance prior to operation of quarry/mines from the from the District Environmental Impact Assessment Authority, Ernakulam. Considering the cost of the project, cost towards production, sale value etc, the project is viable and bring some positive benefit directly or indirectly to the nearby locality. Excavated good quality red earth will be utilized for Land Development and pilling works at HPCL Irumpanam for M/s Vijaya Building Construction PVT Ltd. Manufacturing & Production Production Production Capacity 3 Excavation of Ordinary Earth 20000 M This is an Ordinary earth excavation project and excavated good quality red earth will be utilized for Land Development and pilling works at HPCL Irumpanam for M/s Vijaya Building Construction PVT Ltd. Pollution Control Measures: The major sources of pollution in proposed earth excavation activity will be Particulate Matter (Fugitive emission) generated due to excavation of earth. The surrounding of project area is agricultural in nature with good greenery all around. This will minimize the fugitive emissions. However, during dry season, excavation operation will be carried out after water sprinkling to avoid generation of fugitive dust emissions. No effluent will be generated due to proposed ordinary earth Excavation unit as the water will be used for domestic purposes only. Solid Waste Management: No solid wastes will be generated due to proposed ordinary earth Excavation operation. Project Cost : Total cost of ordinary earth excavation project is approx. Rs. 10,000,00/=. PROJECT DETAILS 2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION : (i) Identification of Project & Location of the Project: Ordinary Earth Excavation site of Edakkattuvayal Village- Vinayakumar & Sindhu Vinayakumar site is located near Edakkattuvayal Road and 500 mtr away from Peppathy- Arakkunnam- Kanjiramattom Road in Edakkattuvayal Village, Kannayannoor Taluk, Ernakulam Dist. It is about 25 km away from District Headquarter Ernakulam. Site is well connected to Piravom-Nadakkavu- Ernakulam highway which connects district headquarters at Ernakulam. Project site is about 5 Km from Mulanthuruthy Railway Station. Drainage system in the region is dendritic. Surface runoff water in the region will be discharged to the natural drainage course. Site Location Geo Coordinates of the Project site is as under Geo Coordinates of Ordinary Earth Excavation Area. Lattitude Longitude Elevation Differance w.r.t BM 1. 9° 52'52.93"N 76°25'53.75"E -0.044 2. 9° 52'52.47"N 76°25'56.42"E -15.413 3. 9° 52'50.17"N 76°25'55.11"E -17.182 4.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us