M5 Motorway Phase III Hungary: Update [EBRD

M5 Motorway Phase III Hungary: Update [EBRD

SCOTT WILSON BUSINESS CONSULTANCY M5 Motorway Phase III Hungary: Environmental Impact Assessment Update Volume I - REPORT Scott Wilson Business Consultancy We work with clients to develop, implement and evaluate projects, programmes and change initiatives to improve performance and reduce risk. M5 Motorway Phase III Hungary: Environmental Update Report February 2005 Collated and Rachael Bailey edited by: Environmental Specialist Reviewed by: Tracey Ryan Project Manager Approved by: Alan Brookes Director Scott Wilson Business Consultancy Greencoat House 15 Francis Street London SW1P 1DH Tel: +44 (0)20 7798 5200 Fax: +44 (0)20 7798 5201 Email: [email protected] M5 MOTORWAY HUNGARY: Phase III Environmental Impact Assessment Update Report TABLE OF CONTENTS GLOSSARY OF TERMS _______________________________ 5 List of Abbreviations _________________________________ 7 1 Introduction __________________________________ 8 1.1 Background and Objectives of the Assignment ___________8 1.1.1 Principal changes required to update the Uvaterv EIA (1999)_______ 8 1.1.2 Relevant previous assignments _______________________________ 9 1.2 Operational Framework _______________________________9 1.3 The Site and Project History ___________________________9 1.4 Analysis of Alternatives ______________________________10 1.5 Recommendations from Gap Analysis Report____________10 1.6 Structure of the Report_______________________________11 2 Project Description ___________________________ 12 2.1 Overview __________________________________________12 2.2 Key Design Features_________________________________12 3 Environmental Legislation and Permitting________ 14 3.1 Legal and Institutional Framework _____________________14 3.2 Environmental Legislation ____________________________14 3.3 Environmental Permitting and Licensing ________________14 3.3.1 Construction Permit _______________________________________ 15 3.3.2 Water Permits_____________________________________________ 15 3.3.3 Borrow Pit Licences _______________________________________ 15 3.3.4 Emergency Response ______________________________________ 15 4 Phase III Environmental Issues _________________ 16 4.1 Assessment Methodology ____________________________16 4.2 Traffic _____________________________________________17 4.3 Land Use and Soil ___________________________________18 4.3.1 Baseline Information _______________________________________ 18 4.3.2 Impacts Assessment _______________________________________ 18 4.3.3 Mitigation ________________________________________________ 19 4.3.4 Monitoring _______________________________________________ 19 4.4 Water Quality _______________________________________20 4.4.1 Background ______________________________________________ 20 4.4.2 Baseline _________________________________________________ 20 Scott Wilson Business Consultancy 1 M5 MOTORWAY HUNGARY: Phase III Environmental Impact Assessment Update Report 4.4.3 Impact Assessment ________________________________________ 20 4.4.4 Mitigation ________________________________________________ 22 4.4.5 Monitoring _______________________________________________ 22 4.5 Air Quality _________________________________________23 4.5.1 Background ______________________________________________ 23 4.5.2 Baseline Information _______________________________________ 23 4.5.3 Impact Assessment ________________________________________ 23 4.5.4 Mitigation ________________________________________________ 24 4.5.5 Monitoring _______________________________________________ 24 4.5.6 Summary_________________________________________________ 25 4.6 Noise and Vibration__________________________________26 4.6.1 Background ______________________________________________ 26 4.6.2 Baseline Information _______________________________________ 26 4.6.3 Impact Assessment ________________________________________ 27 4.6.4 Mitigation ________________________________________________ 28 4.6.5 Summary_________________________________________________ 28 4.7 Landscape _________________________________________29 4.7.1 Baseline Information _______________________________________ 29 4.7.2 Impact Assessment ________________________________________ 29 4.7.3 Mitigation ________________________________________________ 30 4.7.4 Monitoring _______________________________________________ 31 4.7.5 Summary_________________________________________________ 31 4.8 Natural Environment and Ecology______________________32 4.8.1 Background ______________________________________________ 32 4.8.2 Baseline Information _______________________________________ 32 4.8.3 Impact Assessment ________________________________________ 33 Construction Impacts _____________________________________________ 33 4.8.4 Mitigation ________________________________________________ 34 4.8.5 Monitoring _______________________________________________ 36 4.9 Archaeology and Cultural Heritage _____________________37 4.9.1 Background ______________________________________________ 37 4.9.2 Baseline Information _______________________________________ 37 4.9.3 Impact Assessment ________________________________________ 37 4.9.4 Mitigation ________________________________________________ 38 4.9.5 Monitoring _______________________________________________ 38 4.10 Social and Community _____________________________39 4.10.1 Community and Stakeholder ________________________________ 39 4.10.2 Involuntary Resettlement ___________________________________ 39 4.10.3 Compensation Procedures __________________________________ 43 4.10.4 Vulnerable Groups_________________________________________ 44 4.10.5 Forced and Child (Under 18) Labour __________________________ 44 Scott Wilson Business Consultancy 2 M5 MOTORWAY HUNGARY: Phase III Environmental Impact Assessment Update Report 4.10.6 Road safety_______________________________________________ 45 4.10.7 Social Impacts of Noise and Air Pollution______________________ 45 4.10.8 Social Monitoring__________________________________________ 45 4.11 Borrow Pits _______________________________________46 5 Public Information and Consultation ____________ 47 5.1 Original Consultation for the M5 Motorway ______________47 5.1.1 Consultation during Phase II: Modified Design for Approval ______ 48 5.1.2 Previous Consultation for Phase II EIA Update and Environmental Review Meeting __________________________________________________ 48 5.1.3 Consultation for Phase III EIA Update and Environmental Review Meeting __________________________________________________ 49 5.1.4 Consultation following the Public Meeting – Household Survey ___ 50 5.1.5 Dissemination of Information to the Public_____________________ 51 5.1.6 Recommended consultation during Construction _______________ 51 5.1.7 Household Survey Responses Summary ______________________ 52 6 Proposed Mitigation Measures _________________ 54 7 Recommendations for Monitoring Plan __________ 58 7.1 Water Quality _______________________________________58 7.2 Air Quality _________________________________________58 7.3 Noise and Vibration__________________________________58 7.4 Landscape _________________________________________59 7.5 Natural Environment and Ecology______________________59 7.6 Socio-Economic ____________________________________59 7.7 Monitoring by the Banks _____________________________60 8 Management Plan ____________________________ 61 9 Construction Environmental Management Plan (CEMP) _________________________________________ 68 9.1 Water Quality _______________________________________68 9.2 Landscape _________________________________________69 9.3 Noise and Vibration__________________________________69 9.4 Natural Environment and Ecology______________________70 9.5 Archaeology _______________________________________70 9.6 Social _____________________________________________70 10 Non Technical Summary ______________________ 72 10.1 Screening Category and Rationale for Classification_____72 10.2 Introduction ______________________________________72 10.3 Method __________________________________________72 Scott Wilson Business Consultancy 3 M5 MOTORWAY HUNGARY: Phase III Environmental Impact Assessment Update Report 10.4 Description of the Scheme __________________________72 10.5 Key issues _______________________________________73 10.5.1 Land Use and Soil _________________________________________ 73 10.5.2 Water quality _____________________________________________ 74 10.5.3 Air quality ________________________________________________ 74 10.5.4 Noise and Vibration ________________________________________ 74 10.5.5 Landscape _______________________________________________ 75 10.5.6 Natural Environment and Ecology ____________________________ 75 10.5.7 Archaeology and Cultural Heritage ___________________________ 75 10.5.8 Social and Community _____________________________________ 76 10.5.9 Borrow Pits_______________________________________________ 76 10.5.10 Monitoring______________________________________________ 76 10.5.11 Construction Environmental Management Plan (CEMP) ________ 76 Scott Wilson Business Consultancy 4 M5 MOTORWAY HUNGARY: Phase III Environmental Impact Assessment Update Report GLOSSARY OF TERMS AKA Project sponsors (concessionaire) also responsible for the commissioning of the environmental permit and construction permit reviews. A Weighted Decibel Internationally accepted unit for the most frequently used noise measurement. Borrow Pit Area used to obtain materials i.e. sand for construction. CEMP A manual which defines the approach to environmental management during construction.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    79 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us