High Priority Notifications Works to Be Completed Between 1 April 2014 and 31 March 2015 Canal/Reservoir Location Description De

High Priority Notifications Works to Be Completed Between 1 April 2014 and 31 March 2015 Canal/Reservoir Location Description De

High Priority Notifications Works to be Completed between 1 April 2014 and 31 March 2015 Canal/Reservoir Location Description Description of Problem Type of Works Period of Delivery (Quarter) Comments Key : Aire & Calder Navigation Main Line Access Point Anti-slip required. Timber Repairs 1 completed 1 = April to June 2014 Aire & Calder Navigation Main Line Access to Heck Compound Retaining wall movement. Brickwork/Masonry Repairs 1 completed 2 = July to September 2014 Aire & Calder Navigation Main Line Aire & Calder Navigation Main Line - 018 Install vehicle Restraint Towpath Repairs 1 completed 3 = October to December 2014 Aire & Calder Navigation Main Line Aire & Calder Navigation Main Line - 045 0800m Suitable fill req behind piles. Bank Protection 1 completed 4 = January to March 2015 Aire & Calder Navigation Main Line Aire & Calder Navigation Main Line - 053 Voids behind piles. Bank Protection 1 completed Aire & Calder Navigation Main Line Bridge 1, Knostrop Flood Footbridge broken spindles Timber Repairs 1 completed Aire & Calder Navigation Main Line Bridge 13, Heck Bridge Missing/damaged wall. Brickwork/Masonry Repairs 1 completed completed Aire & Calder Navigation Main Line Bridge 2A, Knostrop River Footbridge broken spindles. Timber Repairs 1 completed Aire & Calder Navigation Main Line Bridge 3, Thwaite Mill Caution pedestrian signs req. Metalwork Repairs 1 completed Scheduled Aire & Calder Navigation Main Line Bridge 5, Gaggs Bridge Bridge ID signs in poor condition. Signage 1 completed Aire & Calder Navigation Main Line Bridge 9, Skew Bridge missing fence rail. Timber Repairs 1 completed Late Aire & Calder Navigation Main Line Culvert 13, Southfield Safe access required. Access Repairs 1 completed Aire & Calder Navigation Main Line Ferrybridge Footbridge Fall from height. Fencing required. Timber Repairs 1 completed Arising Aire & Calder Navigation Main Line Ferrybridge Sluice Handrail bent Metalwork Repairs 1 completed Aire & Calder Navigation Main Line Ferrybridge Sluice Clough box covers required. Metalwork Repairs 1 completed Aire & Calder Navigation Main Line Lock 1, Leeds Lock escape ladders & GRAB CHAINS Metalwork Repairs 1 completed Aire & Calder Navigation Main Line Lock 1, Leeds Lock Missing timber domino. Timber Repairs 1 completed Aire & Calder Navigation Main Line Lock 3, Knostrop Lock Stop groove infills required d/s. Timber Repairs 1 completed Aire & Calder Navigation Main Line Lock 3, Knostrop Lock Possible trip hazard. Towpath Repairs 1 completed Aire & Calder Navigation Main Line Lock 3, Knostrop Lock Possible trip hazards. Brickwork/Masonry Repairs 1 completed Aire & Calder Navigation Main Line Lock 4, Fishpond Lock Rotten wall fender. Timber Repairs 1 completed Aire & Calder Navigation Main Line Lock 4, Fishpond Lock Sink hole above u/s bywash. Bank Protection 1 completed Aire & Calder Navigation Main Line Lock 7, Lemonroyd Lock Damaged bolts on u/s ram backplates. Metalwork Repairs 1 completed Aire & Calder Navigation Main Line Lock 9, Castleford Junction Lock Trip hazard by cabin Concrete Repairs 1 completed Aire & Calder Navigation Main Line Lock 9, Castleford Junction Lock Frame holding Ram Pit gridding. Metalwork Repairs 1 completed Aire & Calder Navigation Main Line Lock 9, Castleford Junction Lock Handrail on u/s landing. steps Metalwork Repairs 1 completed Aire & Calder Navigation Main Line Lock 9, Castleford Junction Lock Fall from height onto landing Timber Repairs 1 completed Aire & Calder Navigation Main Line Lock 9, Castleford Junction Lock Trip/trapping hazard. Towpath Repairs 1 completed Aire & Calder Navigation Main Line Skelton Weir Safety rail/fence required. Timber Repairs 1 completed Aire & Calder Navigation Main Line Southfield Reservoir Washout hole. Bank Protection 1 completed Aire & Calder Navigation Main Line Southfield Reservoir Stone blocks to stop boats Brickwork/Masonry Repairs 1 completed Aire & Calder Navigation Main Line Southfield Reservoir Rip rap repairs on East Bank Bank Protection 1 completed Aire & Calder Navigation Main Line Southfield Reservoir Loose fishing platforms. Timber Repairs 1 completed Aire & Calder Navigation Main Line Lock 4, Fishpond Lock gate failure Metalwork Repairs 1 Completed Aire & Calder Navigation Main Line Driver Don Soak Drain Flood gate failure Timber Repairs 1 Completed Barnsley Canal Haw Park Accom Bridge, Barnsley Canal Install Drain Bank Protection 1 completed Calder & Hebble Navigation Anchor Pit Towpath Dyke Bridge stone work missing Brickwork/Masonry Repairs 1 completed Calder & Hebble Navigation Bridge 8, Forge Lane Bridge nameplate vandalised. Metalwork Repairs 1 completed Calder & Hebble Navigation Calder & Hebble Navigation - 005 wash wall collapsed. Brickwork/Masonry Repairs 1 completed Calder & Hebble Navigation Calder & Hebble Navigation - 011 Mooring post broken/missing Timber Repairs 1 completed Calder & Hebble Navigation Calder & Hebble Navigation - 023 Towpath collapsed/eroding Towpath Repairs 1 completed Calder & Hebble Navigation Flood Gates, Battyeford Ladder is bent Metalwork Repairs 1 completed Calder & Hebble Navigation Flood Gates, Battyeford Fender broken Timber Repairs 1 completed Calder & Hebble Navigation Flood Gates, Battyeford Anchor stone broken Brickwork/Masonry Repairs 1 completed Calder & Hebble Navigation Flood Lock, Wakefield rotten head and beam connection OS gate Timber Repairs 1 completed Calder & Hebble Navigation Lock 16, Cooper Bridge replace faded sign Signage 1 completed Calder & Hebble Navigation Lock 16, Cooper Bridge refix loose/rot signage board posts Timber Repairs 1 completed Calder & Hebble Navigation Lock 20, Double Lock Top Corroded balance beam. Metalwork Repairs 1 completed Calder & Hebble Navigation Lock 21, Double Lock Bottom Worn mitre on tailgate Timber Repairs 1 completed Calder & Hebble Navigation Lock 3, Salterhebble Bottom Salterhebble lock - Improve Access Metalwork Repairs 1 completed Calder & Hebble Navigation Lock 4, Longlees Slippery coping Brickwork/Masonry Repairs 1 completed Calder & Hebble Navigation Lock 4, Longlees Anchor horse shoe block wearing thro' Metalwork Repairs 1 completed Calder & Hebble Navigation Lock 5, Woodside Mills Leak through mitre Timber Repairs 1 completed Calder & Hebble Navigation Lock 7, Park Nook Bottom gate NS top bar cracked Timber Repairs 1 completed Calder & Hebble Navigation Lock 8, Cromwell coping slippery Brickwork/Masonry Repairs 1 completed Calder & Hebble Navigation Lock 9, Brookfoot refix broken ladder hoop Metalwork Repairs 1 completed Calder & Hebble Navigation Lock 9, Brookfoot counter weight missing Metalwork Repairs 1 completed Calder & Hebble Navigation Waste Site Battyeford Battyford Oil Storage Painting needed Metalwork Repairs 1 completed Clarence Dock Clarence Dock Flood Gates Fit steel shoes/saddles. Metalwork Repairs 1 completed Clarence Dock Clarence Dock Flood Gates Rotten footboard. Timber Repairs 1 completed Dewsbury Arm (Calder & Hebble Nav) Dewsbury Arm (Calder & Hebble Nav) - 001 Repair Washwall . Brickwork/Masonry Repairs 1 completed Fairies Hill Cut Fairies Hill Cut - 001 Fishermans dugout. Bank Protection 1 completed Halifax Branch (Calder & Hebble) Halifax Branch (Calder & Hebble) - 001 missing sets under bridge Towpath Repairs 1 completed Halifax Branch (Calder & Hebble) Halifax Branch (Calder & Hebble) - 001 hole in tarmac t/p Towpath Repairs 1 completed Hebble Brook Feeder Hebble Brook Feeder - 001 Key-clamp to low on gate side Metalwork Repairs 1 completed Huddersfield Broad Canal Bridge 2, Lock 9 Bridge parapet wall damaged. Brickwork/Masonry Repairs 1 completed Huddersfield Broad Canal Culvert 6 Install Grill to inlet Metalwork Repairs 1 completed Huddersfield Broad Canal Huddersfield Broad Canal - 003 washwall slippage Brickwork/Masonry Repairs 1 Rephased to Q4 due to Arising Works Huddersfield Broad Canal Lock 3, Ladgrave Lock slippy copings Brickwork/Masonry Repairs 1 completed Huddersfield Broad Canal Lock 3, Ladgrave Lock Repair damaged footboards Timber Repairs 1 completed Huddersfield Broad Canal Lock 4, Longlands Lock void on landing wall Brickwork/Masonry Repairs 1 Rephased to Q4 due to Arising Works Huddersfield Broad Canal Lock 4, Longlands Lock Install fender on bywash inlet Timber Repairs 1 completed Huddersfield Broad Canal Lock 4, Longlands Lock rotten timber fender on landing Timber Repairs 1 completed Huddersfield Broad Canal Lock 9, Red Doles Lock fit heel grips. Towpath Repairs 1 completed Huddersfield Broad Canal Lock 9, Red Doles Lock voids in washwall Brickwork/Masonry Repairs 1 completed New Junction Canal Eskholme Culvert replace bricks Brickwork/Masonry Repairs 1 completed New Junction Canal Kirk Lane Road Bridge 6 bridge operation only sign postsbrkn Timber Repairs 1 completed New Junction Canal New Junction Canal - 004 Repair leak D/S Westfield to O/S Bank Protection 1 completed New Junction Canal New Junction Canal - 006 fishing platforms damaged Timber Repairs 1 completed New Junction Canal New Junction Canal - 007 hole in t/p Towpath Repairs 1 completed New Junction Canal Stony Lane Culvert (Syphon) replace missing brick Brickwork/Masonry Repairs 1 completed New Junction Canal Sykehouse Lock concrete cracking d/s lock landing Concrete Repairs 1 completed New Junction Canal Sykehouse Lock trapping hazard Metalwork Repairs 1 completed New Junction Canal Sykehouse Lock relay sunken block paving Towpath Repairs 1 completed New Junction Canal Sykehouse Road Bridge 7 relocate cycle way sign Signage 1 completed New Junction Canal Low Lane aqueducts safety fencing

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us