Town of Mcclellanville Mcclellanville Pedestrian Bridge Over Jeremy Creek LPA Project No

Town of Mcclellanville Mcclellanville Pedestrian Bridge Over Jeremy Creek LPA Project No

DocuSign Envelope ID: C0C76F0A-599E-40C8-97B3-1B3B9AC74447 Contract Documents & Specifications Town of McClellanville McClellanville Pedestrian Bridge over Jeremy Creek LPA Project No. 11-13 October 21, 2019 5790 Casper Padgett Way North Charleston, SC 29406 Bid Document Set No. _____ Engineer of Record 10/21/2019 421 Wando Park Blvd. Suite 210 Mt. Pleasant, SC 29464 © 2019 CDM Smith LPA 11-13 All Rights Reserved October 21, 2019 SECTION 00010 TABLE OF CONTENTS No. of Section Pages Title Page.................................................................................................................. 1 00010 Table of Contents ..................................................................................................... 3 00020 Invitation to Bid ........................................................................................................ 2 00100 Instructions to Bidders .............................................................................................. 7 ARTICLE 1. .............................................................. QUALIFICATIONS OF BIDDERS ARTICLE 2. ................................................... COPIES OF CONTRACT DOCUMENTS ARTICLE 3. .................. EXAMINATION OF CONTRACT DOCUMENTS AND SITE ARTICLE 4. ................................................................................... INTERPRETATIONS ARTICLE 7. .............................. PERFORMANCE, PAYMENT AND OTHER BONDS ARTICLE 8. .................................................................................................... BID FORM ARTICLE 9. ....................................................................................... RECEIPT OF BIDS ARTICLE 10. .................................. MODIFICATION AND WITHDRAWAL OF BIDS ARTICLE 11. .......................................................................... AWARD OF CONTRACT ARTICLE 12. ............................................................... EXECUTION OF AGREEMENT ARTICLE 13. ............................................... SAFETY AND HEALTH REGULATIONS ARTICLE 14. .................................................................... FEDERAL REQUIREMENTS ARTICLE 15. ........................................................................... FEDERAL WAGE RATES ARTICLE 16. .......................................... NONDISCRIMINATION IN EMPLOYMENT ARTICLE 17. ................................................................................................... LICENSES 00300 Bid Form .................................................................................................................. 5 00500 Agreement ................................................................................................................ 4 ARTICLE 1. ............................................................................................................ WORK ARTICLE 2. .................................................................................................... ENGINEER ARTICLE 3. ........................................................................................ CONTRACT TIME ARTICLE 4. ...................................................................................... CONTRACT PRICE ARTICLE 5. ............................................................... APPLICATIONS FOR PAYMENT ARTICLE 6. ....................................................... PROGRESS AND FINAL PAYMENTS ARTICLE 7. ........................................................................... LIQUIDATED DAMAGES ARTICLE 8. ................................................................................................. ASSURANCE ARTICLE 9. ......................................................................... CONTRACT DOCUMENTS ARTICLE 10. ..................................................................................... MISCELLANEOUS 00613 Performance Bond .................................................................................................... 3 00615 Payment Bond .......................................................................................................... 3 00720 Standard General Conditions of the Construction Contract ...................................... 80 ARTICLE 1. ........................................................ DEFINITIONS AND TERMINOLOGY ARTICLE 2. ......................................................................... PRELIMINARY MATTERS ARTICLE 3 .......................................... DOCUMENTS: INTENT, AMENDING, REUSE ARTICLE 4 ............................ COMMENCEMENT AND PROGRESS OF THE WORK ARTICLE 5 ................ AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS ARTICLE 6 .......................................................................... BONDS AND INSURANCE ARTICLE 7 ....................................................... CONTRACTOR’S RESPONSIBILITIES ARTICLE 8 ............................................................................... OTHER WORK AT SITE ARTICLE 9 ................................................................... OWNER’S RESPONSIBILITIES ARTICLE 10 ................................ ENGINEER’S STATUS DURING CONSTRUCTION ARTICLE 11 ............... AMENDING THE CONTRACT DOCUMENTS, CHANGES IN THE WORK Town of McClellanville Pedestrian Bridge over Jeremy Creek Table of Contents BCDCOG 00010 - 1 © 2019 CDM Smith LPA 11-13 All Rights Reserved October 21, 2019 TABLE OF CONTENTS No. of Section Pages ARTICLE 12 ........................................................................................................ CLAIMS ARTICLE 13 ............... COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK ARTICLE 14 ................ TESTS AND INSPECTIONS; CORRECTION; REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK ARTICLE 15 ............... PAYMENTS TO CONTRACTOR; SET-OFFS; COMPLETION; CORRECTION PERIOD ARTICLE 16 ..................................... SUSPENSION OR WORK AND TERMINATION ARTICLE 17 ........................................................ FINAL RESOLUTION OF DISPUTES ARTICLE 18 ...................................................................................... MISCELLANEOUS 00800 Supplemental Conditions.......................................................................................... 15 8.1 ............................................................................................ DESCRIPTION OF WORK 8.2. ................................................ ENGINEER’S STATUS DURING CONSTRUCTION 8.3. ................................................................................ PERMITS AND REGULATIONS 8.4. .......................................................................................................................... (OPEN) 8.5. ........................................................ STORMWATER REPORTS AND INSPECTION 8.6. ................................................................................. TECHNICAL SPECIFICATIONS 8.7. ....................................... DIMENSIONS, ELEVATIONS, AND REFERENCE DATA 8.8. .................................................. INSPECTION OF WORK AWAY FROM THE SITE 8.09. .................................................................................. PRIOR USE OR OCCUPANCY 8.10. ......................................................................................... WEATHER CONDITIONS 8.11. .................................................................................. ARCHAEOLOGICAL RIGHTS 8.12. .............................................................................................. AS-BUILT DRAWINGS 8.13. ............................................................................................................ CLEANING UP 8.14. ................................................................................................. COMMUNICATIONS 8.15. ......................................................................................... EXISTING STRUCTURES 8.16. ....................................................................................... INTOXICATING LIQUORS 8.17. .................................................................... LEGAL ADDRESS OF CONTRACTOR 8.18. ..................................................................................NIGHT AND SUNDAY WORK 8.19. ................................................................................. OCCUPYING PRIVATE LAND 8.20. .. PROTECTION OF WORK, PROPERTY AND PERSONS IN AN EMERGENCY 8.21. PROTECTION OF EXISTING VEGETATION, STRUCTURES, UTILITIES AND IMPROVEMENTS 8.22 ................................................................................ RESTORATION OF PROPERTY 8.23. .................................. INTERFERENCE WITH AND PROTECTION OF STREETS 8.24. .................................................................................................. TRAFFIC CONTROL 8.25. .................................................................................. CONSTRUCTION DRAINAGE 8.26. ....... CONSTRUCTION STAKES, LINES AND GRADES (FOR BRIDGES ONLY) 8.27. ................................................................... SELECTED CLEARING & GRUBBING 8.28. ........................................................................................... MAINTENANCE STONE 8.29. ......................................................... SOIL EROSION AND SEDIMENT CONTROL 8.30. ............................................................................................ SANITARY FACILITIES 8.31. .......................................................................................... TEMPORARY UTILITIES 8.32. ..................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    230 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us