
Large Generator Interconnection Qualifying Facility FINAL Facilities Restudy Report Completed for (“Interconnection Customer”) Q0650 Q0651 Q0652 Q0653 Proposed Point of Interconnection Hinkle substation April 17, 2018 FINAL Facilities Study Report TABLE OF CONTENTS 1.0 DESCRIPTION OF THE PROJECT .............................................................................................. 1 2.0 STUDY SCOPE AND OBJECTIVES ............................................................................................ 1 3.0 STUDY ASSUMPTIONS ........................................................................................................... 1 4.0 PROPOSED POINT OF INTERCONNECTION .............................................................................. 2 5.0 SCOPE OF WORK ................................................................................................................... 4 5.1 Generating Facility ........................................................................................................... 4 Interconnection Customer to be Responsible For ..................................................... 4 Transmission Provider to be Responsible For .......................................................... 6 5.2 Echo Substation ................................................................................................................ 7 Interconnection Customer to be Responsible For ..................................................... 7 Transmission Provider to be Responsible For .......................................................... 7 5.3 Point of Interconnection – Hinkle substation ................................................................... 7 Transmission Provider to be Responsible For .......................................................... 7 5.4 Other ................................................................................................................................. 8 Interconnection Customer to be Responsible For ..................................................... 8 Transmission Provider to be Responsible For .......................................................... 8 6.0 COST ESTIMATE .................................................................................................................... 9 7.0 SCHEDULE........................................................................................................................... 11 8.0 PARTICIPATION BY AFFECTED SYSTEMS ............................................................................. 12 9.0 APPENDICES ........................................................................................................................ 12 9.1 Appendix 1: Higher Priority Requests ........................................................................... 13 9.2 Appendix 2: Property Requirements .............................................................................. 14 April 17, 2018 Q0650-3 Page i FINAL Facilities Study Report 1.0 DESCRIPTION OF THE PROJECT (collectively the “Interconnection Customer”) proposed interconnecting 40 MW of new generation to PacifiCorp’s (“Transmission Provider”) Hinkle substation located in Morrow County, Oregon. project (“Project”) will consist of twenty (20) 2000kW GE 2.0-116 wind turbines for a total output of 40 MW. The requested commercial operation date is October 1, 2019. Interconnection Customer will operate this generator as a Qualifying Facility as defined by the Public Utility Regulatory Policies Act of 1978 (PURPA). The Transmission Provider has assigned the project “Q0650, Q0651, Q0652 & Q0653.” 2.0 STUDY SCOPE AND OBJECTIVES The objective of the facilities study is to: complete a facilities analysis, which shall specify and estimate the cost of equipment, engineering, procurement, and construction required to address issues as outlined in the system impact study, and provide a scope of work and an estimated cost and schedule for completing the scope of work. 3.0 STUDY ASSUMPTIONS All active higher priority transmission service and/or generator interconnection requests will be considered in this study and are listed in Appendix 1. If any of these requests are withdrawn, the Transmission Provider reserves the right to restudy this request, as the results and conclusions contained within this study could significantly change. For study purposes there are two separate queues: o Transmission Service Queue: to the extent practical, all network upgrades that are required to accommodate active transmission service requests will be modeled in this study. o Generation Interconnection Queue: Interconnection Facilities associated with higher queue interconnection requests will be modeled in this study. The Interconnection Customer’s request for interconnection service in and of itself does not convey transmission service. Only a Network Customer may make a request to designate a generating resource as a Network Resource. Because the queue of higher priority transmission service requests may be different when a Network Customer requests network resource designation for this Generating Facility, the available capacity or transmission modifications, if any, necessary to deliver 100% of the Project output to network load may be significantly different. Therefore, the Interconnection Customer should regard the results of this study as informational rather than final. This study assumes the Project will be integrated into Transmission Provider’s system at the agreed upon and/or proposed Point of Interconnection (“POI”). The Interconnection Customer will construct and own any facilities required between the POI and the Project unless specifically identified by the Transmission Provider. Line reconductor or fiber underbuild required on existing poles will be assumed to follow the most direct path on the Transmission Provider’s system. If during detailed design the path must April 17, 2018 Q0650-3 Page 1 FINAL Facilities Study Report be modified it may result in additional cost and timing delays for the Interconnection Customer’s project. Under normal conditions, the Transmission Provider does not dispatch or otherwise directly control or regulate the output of generating facilities. Therefore, the need for transmission modifications, if any, which are required to deliver 100% of Project output to the Network Customer’s network load will be evaluated (i.e., no displacement of other resources in the same area). Generator tripping may be required for certain outages. All facilities will meet or exceed the minimum Western Electricity Coordinating Council (“WECC”), North American Electric Reliability Corporation (“NERC”), and Transmission Provider performance and design standards. The Q0650-Q0653 Project has been studied assuming all four interconnection requests are constructed simultaneously. Any modification to the timing or status of any of the four requests by the Interconnection Customer will require a restudy by the Transmission Provider. The Q0650-Q0653 Generating Facilities are studied based on the one-line diagrams provided by the Interconnection Customer labeled SL.01 through SL.04, dated March 30, 2015. Stated facilities include twenty General Electric 2.0-116 wind turbine generators, organized into a single 34.5 kV collector string, with four branches, and a new 34.5 kV to 69 kV fixed ratio, 25/33.3/41.7 MVA, 8% impedance transformer at the Interconnection Customer owned collector substation. For events requiring a Remedial Action Scheme (“RAS”) to trip the 40 MW output of the Q0650-Q0653 Project, the 34.5 kV feeder breaker 52-1 will be tripped. Bonneville Power Administration’s (“BPA”) 115-69 kV transformer located at McNary substation is scheduled to be replaced in the Fall of 2019 and is contingent for this Project. The Project will be interconnected through the Interconnection Facilities associated with the earlier queue projects Q0102-Q0106 and Q0145-Q0147 referred to collectively as the Echo project. This report is based on information available at the time of the study. It is the Interconnection Customer’s responsibility to check the Transmission Provider’s web site regularly for Transmission system updates at http://www.pacificorp.com/tran.html 4.0 PROPOSED POINT OF INTERCONNECTION The Interconnection Customer’s proposed Generating Facility is to be interconnected to the Transmission Provider’s 69 kV Hinkle substation through the existing, approximately 9.7 mile 69 kV transmission tie line constructed for the earlier queue projects Q0102-Q0106 and Q0145- Q0147. April 17, 2018 Q0650-3 Page 2 FINAL Facilities Study Report McNary Substation L366 A 400 0. 37 MILES Umatilla Substation 6. 17 MILES 230 kV Wallula Substation 1W27 Cold Springs Substation 36/48/60 MVA 6.7 MILES 3W120 5/6.25 MVA 4. 59 MILES 3W234 0. 67 MILES NO 3W90 3W67 0.79 MILES Hermiston Substation Point of Interconnection 3.43 MILES Hinkle Substation M R Change of ownership 69kV 9. 7 MILES Echo Substation Q102-106, Q 145-147 R 52-1 34.5 kV Q 0650 52H 52-2 M New Facilities Q0651 VS-1 4 MVAR M Q0652 VS-2 4 MVAR M Q0653 M Figure 1: System One Line Diagram April 17, 2018 Q0650-3 Page 3 FINAL Facilities Study Report 5.0 SCOPE OF WORK 5.1 Generating Facility The following outlines the design, procurement, construction, installation, and ownership of equipment at the Interconnection Customer’s Generation Facility and associated collector substation. INTERCONNECTION CUSTOMER TO BE RESPONSIBLE FOR Procure all necessary permits, lands, rights of way and easements required for the construction
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-