PART IV. REPORT on MATERIAL SOURCES INVESTIGATION.Pdf

PART IV. REPORT on MATERIAL SOURCES INVESTIGATION.Pdf

LAO PEOPLE’S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY MINISTRY OF PUBLIC WORKS AND TRANSPORT DEPARTMENT OF ROADS NR 13 NORTH IMPROVEMENT AND MAINTENANCE PROJECT ( SIKEUTH JUNCTION – PHONHONG) PART IV REPORT ON MATERIAL SOURCES INVESTIGATION PREPARED BY : ìñ©-¸ò-¦¾-¹½¡ò© ¸ò-¦½¸½-¡¿ £ö´´½•¾£ö´ LAO TRANSPORT ENGINEERING CONSULTANT TEL : (+856-21) 313761, 313510, Fax : 314811 E-mail : [email protected]; WWW.ltec.com.la VIENTIANE P November 2017 LTEC CODE: SD-262-17 P ROAD No 13 NORTH IMPROVEMENT AND MAINTENANCE PROJECT SECTION: SIKEUTH JUNCTION – PHONHONG (58 KM) Material Sources Investigation Table of Content TABLE OF CONTENTS Page ABBREVIATIONS iii 1. INTRODUCTION 1 2. WORKS PROCEDURES 1-4 3. FIELD EXPLORATION AND CONSTRUCTION MATERIALS 4 3.1 Field Exploration 4 3.2 Construction Materials 4-10 3.3 Data of Material Sources 11-16 4. LABORATORY TESTING 17 4.1 Samples from Borrow Pits 17 4.2 Samples from River sand, River gravel and Quarry 17 5. RECOMMENDATION 18 6. FEASIBILITY STUDY 18 7. LIST OF FIGURES Figure 1 Location Map of Project Site Figure 1.1 to 1.2 Location Map of Material Sources Figure 2 Unified Soil Classification System 8. APPENDIX A Table A-1 to A-3 Summary of Laboratory Test Results for Borrow Pits (BP01 and BP12) Figure A-1 to A-12 Sketchy Plan for Borrow Pits (BP01 and BP12) 9. APPENDIX B Table B-1 to B-3 Summary of Laboratory Test Results for Material Sources (RG01-08, RS01-09 and Q01-03) Lao Transport Engineering Consultant Page ii ROAD No 13 NORTH IMPROVEMENT AND MAINTENANCE PROJECT SECTION: SIKEUTH JUNCTION – PHONHONG (58 KM) Material Sources Investigation Table of Content 9. APPENDIX B Table B-1 to B-3 Summary of Laboratory Test Results for Material Sources (RG01-08, RS01-09 and Q01-03) Figure B-01 to B-20 Sketchy Plan for Material Source (RG01-08, RS01-09 and Q01-03) 10. APPENDIX C Annexes 4.1 (a) - 4.1 (B) Location of Material Source in Map (River gravel, River sand and Quarry) Annexes 4.1 (b) Schedule of Locations of Borrow pit/Quarry (Borrow pit, River gravel, River sand and Quarry) Annexes 4.2 (a) Summary of Coarse Aggregate test Annexes 4.3 (a) Summary of Fine Aggregate test Annexes 4.4 (a) Summary of Natural Gravel and Soils test Lao Transport Engineering Consultant Page ii NR 13 NORTH ROAD IMPROVEMENT AND MAINTENANCE PROJECT SECTION: SIKEUTH JUNCTION – PHOHONG (58 KM) Material Sources Investigation Abbreviations ABBREVIATIONS AASHTO : American Association of State Highway and Transportation Officials BP : Borrow Pit CBR : California Bearing Ratio DD : Dry Density FM : Fineness Modulus Kg : Kilogram Km : Kilometer LTEC : Lao Transport Engineering Consultant LL : Liquid Limit LAA : Los Angeles Abrasion MC : Moisture Contents MDD : Maximum Dry Density m : Meter mm : Millimeter OMC : Optimum Moisture Contents PI : Plasticity Index PL : Plastic Limit Q : Quarry SG : Specific Gravity SSD : Saturated Surface Dry Snd : Soundness USCS : Unified Soil Classification System d : Unit Weight of Dry Density w : Unit Weight of Wet Density Lao Transport Engineering Consultant Page iii ROAD No 13 NORTH IMPROVEMENT AND MAINTENANCE PROJECT SECTION: SIKEUTH JUNCTION – PHONHONG (58 KM) Material Sources Investigation Report 1. INTRODUCTION This report describes about the results of material sources investigation for the NR 13 North Road Improvement and Maintenance Project . Along the National Road Number 13 North from Sikeuth junction (Vientiane capital) to Phonhong district, Vientian Provinces. (See location map of material sources in Figure 1, 1.1 and 1.2). The objective of this investigation is finding sources of feasible material for project of National Road Number 13 North improvement and maintenance Project (Sikeuth Junction to Phonhong District). The Material Sources Investigation was conducted by geological investigation team of Lao Transport Engineering Consultant (LTEC). 2. WORKS PROCEDURES 1) To find discover of material sources in the project area or nearest location. 2) Collect sample of material to laboratory and do the test analysis of material properties. 3) Collect in formation about material sources. 4) Report preparation about field investigation and test results. The following location of material sources have been investigated: Borrow pit (BP01) material sample have been taken from the km 1+500 Left hand side 4,000 meters (Sikeuth village) on Road Number 13 north section from Sikeuth junction to Phonhong district. (See location map of material sources in Figure 1.1). Borrow pit (BP02) material sample have been taken from the km 10+300 Left hand side 4,000 meters( Nayan village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.1). Borrow pit (BP03) material sample have been taken from the km 10+300 Left hand side 3,280 meters ( Nayan village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.1). Borrow pit (BP04) material sample have been taken from the km 14+050 Left hand side 4,000 meters( Ilai tai village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.1). Borrow pit (BP05) material sample have been taken from the km 17+800 Left hand side 8,200 meters (Phonkham village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.2). Borrow pit (BP06) material sample have been taken from the km 38+700 Right hand side 2,000 meters(Nalao village) on Road Number 13 north section from Lao Transport Engineering Consultant Page 1 ROAD No 13 NORTH IMPROVEMENT AND MAINTENANCE PROJECT SECTION: SIKEUTH JUNCTION – PHONHONG (58 KM) Material Sources Investigation Report Sikeuth junction to Phonhong Distrct. (See location map of material sources in Figure 1.2). Borrow pit (BP07) material sample have been taken from the km 45+621 Left hand side 1,500 meters(Vangmon village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.2). Borrow pit (BP08) material sample have been taken from the km 49+250 Left hand side 500 meters(Phon Ngunh village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.2). Borrow pit (BP09) material sample have been taken from the km 54+800 Right hand side 2,500 meters (Namcheng village) on Road Number 13 north section from Sikeuth junction to Phonhong District. (See location map of material sources in Figure 1.2). Borrow pit (BP10) material sample have been taken from the km 55+508 Left hand side 1,000 meters(phonsi tai village) on Road Number 13 north section from Sikeuth to Phonhong District. (See location map of material sources in Figure 1.2). Borrow pit (BP11) material sample have been taken from the km 56+200 Left hand side 100 meters(phonsi tai village) on Road Number 13 north section from Sikeuth to Phonhong District. (See location map of material sources in Figure 1.2). Borrow pit (BP12) material sample have been taken from the km 57+300 Right hand side 7,000 meters(Sang yai village) on Road Number 13 north section from Sikeuth to Phonhong District. (See location map of material sources in Figure 1.2). River gravel (RG1) material sample have been taken in Mekong river from the km 3+000 Left hand side 100 meters (Nongda village) on Road Number 11 section from Sikai to Sangthong District. (See location map of material sources in Figure 1.1). River gravel (RG2) material sample have been taken in Mekong river from the km 17+000 Left hand side 20 meters (Ank yai village) on Road Number 11 section from Sikai to Sangthong District. (See location map of material sources in Figure 1.1). River gravel (RG3) material sample have been taken in Nam Ngum river from the km 28+650 Right hand side 7000 meters (Hatsiao village) on Road Number 13 north section from Sikeuth to Phonhong District. (See location map of material sources in Figure 1.2). River gravel (RG4) material sample have been taken in Nam Ngum river from the km 31+625 Right hand side 10,000 meters from (Lingxan village) on Road Number 13 north section from Sikeuth to Phonhong District. (See location map of material sources in Figure 1.2). River gravel (RG5) material sample have been taken in Nam lik river from the km 75+000 Right hand side 9,000 meters from (That village) on Road Number Lao Transport Engineering Consultant Page 2 ROAD No 13 NORTH IMPROVEMENT AND MAINTENANCE PROJECT SECTION: SIKEUTH JUNCTION – PHONHONG (58 KM) Material Sources Investigation Report 13 north section from Phonhong to HinHeup District. (See location map of material sources in Figure 1.2). River gravel (RG6) material sample have been taken in Nam Ngum river from the km 57+300 Right hand side 16,000 meters. (Nanin village) on Road Number 10 section from Phonhong to Viengkham District. (See location map of material sources in Figure 1.2). River gravel (RG7) material sample have been taken in Nam Ngum river from the km 57+300 Right hand side 24,000 meters (Donkuad village) on Road Number 10 section from Phonhong to Viengkham District. (See location map of material sources in Figure 1.2). River gravel (RG8) material sample have been taken in Nam Ngum river from the km 57+300 Right hand side 27,000 meters (Donkuad village) on Road Number 10 section from Phonhong to Viengkham District. (See location map of material sources in Figure 1.2).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    85 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us