Orient/East-Med Core Network Corridor Study Final Report Annexes December 2014 mmmll Study on Orient / East-Med TEN-T Corridor, Final Report, Appendix Content Annex 1: Fulfilment of TEN-T Technical Parameters Annex 1a: Rail Infrastructure Compliance Test 2013 Annex 1b: IWW Infrastructure Compliance Test 2013 Annex 1c: Road Infrastructure Compliance Test 2013 Annex 2: Lists of Reviewed Documents Annex 2a: List of Multinational Projects and Studies Annex 2b: Documents related to CEF Projects Annex 2c: List of National Projects and Studies Annex 3: Maps of the Corridor Annex 4: Review of Port Demand studies Annex 5: List of Projects per Transport Mode Annex 6: ERTMS Deployment Plan Annex 7: Review of most important corridor related studies Annex 8: List of Stakeholders Annex 9: Bottleneck Mitigation Analysis Disclaimer The information and views set out in this Report are those of the author(s) and do not necessarily reflect the official opinion of the Commission. The Commission does not guarantee the accuracy of the data included in this study. Neither the Commission nor any person acting on the Commission’s behalf may be held responsible for the use which may be made of the information contained therein. December 2014 2 Study on Orient / East-Med TEN-T Core Network Corridor Final Report Annex 1 – Fulfilment of TEN-T Technical Parameters 5 December 2014 Study on Orient / East-Med TEN-T Corridor, Final Report, Annex 2 Tables Table A Rail Infrastructure Compliance Test 2013, issued 5 Dec 2014 Table B IWW Infrastructure Compliance Test 2013, issued 5 Dec 2014 Table C Road Infrastructure Compliance Test 2013, issued 5 Dec 2014 Disclaimer The information and views set out in this Report are those of the author(s) and do not necessarily reflect the official opinion of the Commission. The Commission does not guarantee the accuracy of the data included in this study. Neither the Commission nor any person acting on the Commission’s behalf may be held responsible for the use which may be made of the information contained therein. December 2014 2 Study on the Orient / East Med Core Network Corridor – Annex 1a Fulfilment of TEN-T Technical Parameters Rail Compliance Test 2013 5 December 2014 Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC Legend Compliance with TEN-T regulation 1315/2013 Technical parameter is compliant Technical parameter is compliant for core pass. line Technical parameter is not compliant ↔ Need for reversing passenger trains Technical Requirements for Rail according to Art 15 (ECMT Class IV) • Electrification: to be electrified by 2030 (including sidings where necessary) • Axle load (Core freight lines): 22.5 t by 2030 • Line speed (Core freight lines): 100 km/h by 2030 • Train length (Core freight lines): to allow for 740m trains by 2030 • ERTMS / signalling system: to be equipped with ERTMS by 2030 • Track gauge: 1435mm* *) Along OEM corridor, track gauge is 1435mm everywhere and therefore not depicted in the following illustrations. Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Warnemünde RostockHbf Kavelstorf Rostock Seehafen Kavelstorf km 0 50 km 0 50 Important nodes Conventional, mixed traffic Conventional, mixed traffic Line type 15 kV, 16,7 Hz 15 kV, 16,7 Hz Traction 2 1 1 Number of tracks 120 160 100 Max operational speed, km/h 740* 740* Max train length, m 225 kN 225 kN Axle load No ETCS No ETCS Signaling GSM-R GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Kavelstorf Waren Neustrelitz Birken- werder Brieselang Hasselberg Berlin Blanken- felde Elster- werda km 0 50 100 150 200 250 300 350 Important nodes Conventional, High Speed, mixed traffic mixed traffic High Speed, mixed traffic Line type 15 kV, 16,7 Hz Traction 2 2 2 Number of tracks 160 120 160 Max operational speed, km/h 740* Max train length, m 225 kN Axle load No ETCS Signaling GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Birken- werder Berlin Biesdorfer Kreuz Grünauer Kreuz Blanken- felde km 0 50 100 Important nodes Conventional, mixed traffic Line type 15 kV, 16,7 Hz Traction 2 Number of tracks 120 100 120 Max operational speed, km/h 740* Max train length, m 225 kN Axle load No ETCS Signaling GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Elster- werda Kottewitz Wilhelms- haven Oldenburg Bremen Hbf Bremer- haven Bremen Hbf km 350 400 km 0 50 100 0 50 100 Important nodes/stations High Speed, mixed traffic Conventional, mixed traffic Conventional, mixed traffic Line type 15 kV, 16,7 Hz Diesel 15 kV, 16,7 Hz 15 kV, 16,7 Hz Traction 2 2 2 2 Number of tracks 160 100 160 160 Max operational speed, km/h 740* 740* 740* Max train length, m 225 kN 225 kN 225 kN Axle load No ETCS No ETCS No ETCS Signaling GSM-R GSM-R GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Country: Germany Country: of TEN Fulfilment Contractor: iC / ITC / Panteia / Railistics / SYSTEM/ Railistics / Panteia/ITC / iC Contractor: Corridor Network Core /East-Med Orient the on Study Telecommunication Telecommunication Signaling loadAxle length, m train Max speed, km/h operational Max Number tracks of Traction Line type nodes/stations Important -T Technical Parameters Parameters Technical -T km Mode: Rail 0 Hamburg 160 A / Prodex / UPB/ PwC/ Prodex/ A Rothen- burgsort , DG MOVE, European Commission, Commission, European MOVE, DG , 200 Aumühle Schwarzen- bek 50 230 Hagenow 100 Land Status: 2013 Status: *: timetable-related timetable-related *: length. length. High Speed, mixed traffic traffic mixed Speed,High 150 15 kV, 16,7 Hz 15 kV, Witten- No ETCS No ETCS GSM-R berge 740* 225 2 kN / / operational restrictions may have influence po have influence the may on restrictions operational 200 Neustadt (Dosse) 250 Brieselang 100 Brieselang- Hasselberg 300 ssible ssible train Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Bremen Hbf Wunstorf Seezle Hannover Lehrte Braun- schweig Hbf Helmstedt Magde- burgHbf Roßlau km 0 50 100 150 200 250 300 350 Important nodes/stations Conventional, mixed traffic Line type 15 kV, 16,7 Hz Traction 2 Number of tracks 160 120 100 160 120 160 100 120 100 Max operational speed, km/h 740* Max train length, m 225 kN Axle load No ETCS Signaling GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Schöna DE/CZ Lutherstadt Wittenberg Falkenberg (Elster) Zeithain Kottewitz Dresden Hbf Obervogel- gesang Stadt Wehlen km 350 400 450 500 550 Important nodes/stations Conventional, mixed traffic Line type 15 kV, 16,7 Hz Traction 2 Number of tracks 100 100 120 160 120 160 100 120 Max operational speed, km/h 740* Max train length, m 225 kN Axle load No ETCS Signaling GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Fulfilment of TEN-T Technical Parameters Country: Germany Mode: Rail Status: 2013 Roßlau Dessau Süd Jeßnitz Greppin Bitterfeld Leipzig Messe Leipzig Nord Leipzig Hbf Leipzig Paunsdorf Riesa Zeithain km 0 50 100 150 ↔ Important nodes/stations Note to Train Length: Conventional, High Speed, Rosslau – Dresden is defined mixed traffic mixed traffic as Core Passenger Rail Line. Line type 15 kV, 16,7 Hz Traction 2 Number of tracks 120 120 120 160 160 200 160 160 Max operational speed, km/h 740* Max train length, m 225 kN Axle load No ETCS Signaling GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, *: timetable-related / operational restrictions may have influence on the possible train Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC length. Fulfilment of TEN-T Technical Parameters Country: Czech Rep. Mode: Rail Status: 2013 II Border DE/CZ Decin Usti n.L. see Note 1 V. n. Kralupy Praha Poricany Kolin km 0 50 100 150 200 Important nodes/stations Conventional, mixed traffic Line type 3 kV, DC Traction Note 1: The depicted section Decin – Praha is 2 3 part of the comprehensive corridor, while the core passenger rail line will be the Number of tracks planned High Speed Rail Link between border DE/CZ and Praha (after 2020) 120 160 <100 Max operational speed, km/h 600 700 Max train length, m 225 kN Axle load No ETCS ETCS L2 Test Signaling GSM-R Telecommunication Study on the Orient / East-Med Core Network Corridor, DG MOVE, European Commission, Contractor: iC / ITC / Panteia / Railistics / SYSTEMA / Prodex / UPB / PwC Fulfilment of TEN-T Technical Parameters Country: Czech Rep.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages249 Page
-
File Size-