FORM I I. BASIC INFORMATION S. No Item Details 1. Name of the Project

FORM I I. BASIC INFORMATION S. No Item Details 1. Name of the Project

PROPOSED CONSTRUCTION OF HOSPITAL WITH RESIDENTIAL QUARTERS BY M/s. JAISAKTHI EDUCATIONAL TRUST FORM I FORM I I. BASIC INFORMATION S. Item Details No 1. Name of the project/s Proposed construction of Panimalar Medical College and Research Institute at Survey Numbers 11 & 12 etc., of Nazarathpettai village, Poonamallee Taluk, Tiruvallur district by M/s. Jaisakthi Educational Trust. 2. S.No. in the schedule The project is categorized under Schedule 8 (a) “Building and Large Construction projects” of EIA Notification 2006 and its subsequent amendment 3. Proposed capacity / Proposed Built-up area is 77,057.85 area/length/tonnage to be Sq.m. handled/command area/lease Building wise area details are given in area/number of wells to be drilled the Conceptual Plan 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. Nil 6. Category of Project i.e. ‘A’ or ‘B’ Category B2 7. Dose it attract the general condition? No If yes, please specify. 8. Dose it attract the specific condition? Not Applicable If yes, please specify. 9. Location Plot/Survey/ Khasra. No 11, 12, 13, 21, 22, 23, 24pt, 25pt, 26, 27/1(pt), 27/2(pt), 28/1(pt), 28/2(pt), 29/1(pt), 29/2(pt), 38/1(pt), 39/1(pt), 39/2(pt), 41/1, 41/2(pt), 42, 43, 44, 98, 100, 101, 102, 103, 106 and 108 Village Varadharajapuram Taluk Poonamallee District Thiruvallur State Tamil Nadu 10. Nearest railway station/airport along Railway Station with distance in Km. Pattabiram - 7 km (NNW) Tiruninravur - 9.1 km (NW) Airport Chennai International Airport - 10.3 km (SW) 11. Nearest town, city, district Thirumazhisai - 1.4 km (SW), 1 NOVEMBER 2016 PROPOSED CONSTRUCTION OF HOSPITAL WITH RESIDENTIAL QUARTERS BY M/s. JAISAKTHI EDUCATIONAL TRUST FORM I headquarters along with distance in Poonamallee- 3.3 km (SE) Km. Nazarathpet - 1.1 km (S) 12. Village Panchayats, Zilla parished, Poonamallee Panchayat Union municipal corporation, local Panchayat Union Office, 1, New body(complete postal address with Building, Trunk Road, Poonamallee, telephone nos. to be given) Chennai, 600056 Telephone No: 044-26495686 13. Name of the applicant M/s. Jaisakthi Educational Trust 14. Registered address 23, 2nd Street, Railway Colony, Nelson Manickam Road, Aminjikarai, Chennai, Tamil Nadu 600029 15. Address for correspondence Name Mr.C. Sakthi Kumar Designation (Owner/Partner/CEO) Trustee Address Bangalore Trunk Road, Varadharajapuram, Nazarethpettai, Poonamallee, Chennai Pin Code 600123 E-Mail [email protected] Telephone/ Mobile No 044-26490202, 044-23741289 Fax No 044-26490101, 044-23742744 16. Details of Alternative Sites Examined, No alternative sites examined if any, location of these sites should be shown on a Topo sheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval / Clearance under the following acts: if yes, details of the same and their status to be given. (a)The Forest (Conservation) Act, 1980? (b)The Wildlife (Protection) Act, 1972? (c)The C.R.Z Notification, 1991? 22. Whether there is any government No order/ Police relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the land/ or land in 2 NOVEMBER 2016 PROPOSED CONSTRUCTION OF HOSPITAL WITH RESIDENTIAL QUARTERS BY M/s. JAISAKTHI EDUCATIONAL TRUST FORM I which the Project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any And its relevance with the proposed Project (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like) Details thereof (with Information/Checklist approximate quantities /rates, S.No. Yes/No confirmation wherever possible) with source of information data 1.1 Permanent or temporary No There will not be any change in the change in land use, land land use, land cover or topography cover or topography as the site is categorized as including increase intensity Institutional & Primary Residential of land use (with respect to Use Zone as per the Development local land use plan) control rules of CMDA. 1.2 Clearance of existing land, No The proposed expansion activities vegetation and Buildings? will be carried out in the vacant land. So there will not be any major clearance activities, no cutting of trees & vegetation except those minor shrubs & weeds clearing. 1.3 Creation of new land uses? No Land use of the proposed site comes under Primary Residential Use Zone and is permitted at the proposed site as per the regulations of CMDA (Refer Annexure I) 1.4 Pre-construction Yes Geo technical investigation has investigations e.g. Bore been done to find the suitability of Houses, Soil testing? soil for providing for adequate foundations for the proposed structure (Refer Annexure V) 1.5 Construction works? Yes Construction of various buildings will be done systematically, with economy of materials and with due 3 NOVEMBER 2016 PROPOSED CONSTRUCTION OF HOSPITAL WITH RESIDENTIAL QUARTERS BY M/s. JAISAKTHI EDUCATIONAL TRUST FORM I care on environmental protection. 1.6 Demolition works? No No demolition works will be carried out as the land is vacant. 1.7 Temporary sites used for Yes Inside the proposed site, a small construction works or area will be utilized temporarily for housing of construction construction of sheds for the workers? workers and materials. Water supply and sanitation facilities will be provided for them. Mostly workers will be deployed from local area only. 1.8 Above ground buildings, Yes Excavation works will be carried structures or earthworks out for foundation of the including linear structures, structures. Later on, the cut and cut and fill or excavations fill process will be required to the minimum extent for leveling. 1.9 Underground works mining No No underground works will be or tunneling? required. 1.10 Reclamation works? No Only levelling of ground if required. 1.11 Dredging? No No need for dredging 1.12 Off shore structures? No Not required 1.13 Production and No It’s a construction project. Hence manufacturing processes? not applicable 1.14 Facilities for storage of No Temporary sheds will be goods or materials? constructed for the storage of cement, sand and other materials during construction phase. 1.15 Facilities for treatment or Yes Sewage generated shall be treated disposal of solid waste or in STP of capacity 550 KLD. The liquid effluents? treated wastewater will be reused for toilet flushing, HVAC and greenbelt development. There will be no excess treated sewage. Municipal Solid Waste will be collected, Segregated, treated and disposed to authorized recyclers. 1.16 Facilities for long term No There is no residential facility for housing of operational operational workers as they will be workers? deployed from local area. 1.17 New road, rail or sea traffic No The existing road network is during Construction or sufficient for connectivity of the operation? site. 1.18 New road, rail, air, No The existing infrastructure will be waterborne or other made use during construction and 4 NOVEMBER 2016 PROPOSED CONSTRUCTION OF HOSPITAL WITH RESIDENTIAL QUARTERS BY M/s. JAISAKTHI EDUCATIONAL TRUST FORM I transport infrastructure operation phase. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No As construction works will be existing transport routes or within a specified area, there is no infrastructure leading to need for closure or diversion of changes in Traffic existing transport routes. The movements? existing transport infrastructure will be made use. 1.20 New or diverted No No new or diversion transmission transmission lines or lines & pipelines are required for pipelines? this project. 1.21 Impoundment, damming, No There will not be any alteration in culverting, realignment or the hydrology of the watercourses other changes to the or aquifers due to the proposed hydrology of watercourses or project. aquifers? 1.22 Stream crossings? No No Stream crossings 1.23 Abstraction or transfers of No No Ground water shall be water form ground or abstracted. Additional quantity of surface waters? water will be sourced from Local body (Poonamallee Panchayat Union) 1.24 Changes in water bodies or No There shall be no change in water land surface affecting bodies or the land surface which drainage or runoff? affect the drainage or runoff. 1.25 Transport of personnel or No Transport of personnel or materials for construction, construction materials during operation or construction phase and operation decommissioning? phase will be through existing roads. 1.26 Long-term dismantling or No No long term works involved in the decommissioning or proposed activity restoration works? 1.27 Ongoing activity during No Only temporary thatched sheds decommissioning which will be built for storing cement and could have an impact on the other materials. So there will be no environment? decommissioning works. 1.28 Influx of people to an area No During construction period either temporarily or workers will be deployed locally. permanently? 1.29 Introduction of alien No No such alien species are species? envisaged 5 NOVEMBER 2016 PROPOSED CONSTRUCTION OF HOSPITAL WITH RESIDENTIAL QUARTERS BY M/s. JAISAKTHI EDUCATIONAL TRUST FORM I 1.30 Loss of native species or No No loss of native species will occur genetic diversity? as the site is plain 1.31 Any other actions? No Only eco-friendly activities like tree plantation will be undertaken 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply) Details thereof (with S.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us