IDP IDP IDP CRISIS RESPONSE BULLETIN July 22, 2015 - Volume: 1, Issue: 27 IN THIS BULLETIN HIGHLIGHTS: English News 03-23 KP CM orders rapid relief work in Flood-Hit Chitral 03 Rains trigger Flash Floods in several parts of Pakistan 03 Significant flood forecast for river Indus at Kalabagh and Chashma 05 Natural Calamities Section 03-08 Senate committee to probe Karachi heat wave, loadshedding 05 Safety and Security Section 09-14 Country still vulnerable to floods 06 Army chief offers Eid prayers with soldiers in Waziristan 09 Public Services Section 15-23 Sindh govt extends Rangers tenure in Karachi for a year 10 Pakistan files complaint with UNMOGIP over 'Indian ceasefire 10 Maps 04,24-32 violations' Interior ministry starts registration of NGOs, madrassas, SC told 10 Apex committee decision: Sindh to mount crackdown on RAW affiliates13 Urdu News 46-33 China-funded LNG project to turn into Iran- Pakistan gas pipeline 15 Rs 248 billion being spent for different power projects 15 Natural Calamities Section 46-44 Gas defaulters punished with disconnections 17 Power, gas supply: Zero-rating facility withdrawal criteria laid down 18 Safety and Security section 43-42 Water and power secretary suspends PESCO officials over poor 20 Public Service Section 41-33 performance PAKISTAN WEATHER MAP MAXIMUM TEMPERATURE MAP OF PAKISTAN RELATIVE HUMIDITY MAP OF PAKISTAN WIND SPEED MAP OF PAKISTAN CHITRAL FLASH FLOOD DAMAGES - 2015 ACCUMULATED RAINFALL MAP - PAKISTAN MAPS PAKISTAN - RESERVOIRS & RIVERS FLOW MAP VEGETATION ANALYSIS MAP OF PAKISTAN CNG SECTOR GAS LOAD MANAGEMENT SNGPL INDUSTRIAL GAS LOAD MANAGEMENT PLAN-SINDH PLAN Shagram Chitral Flash Flood Infrastructure Damages - 2015Terich Legend Terich Mulkoh Main Chitral - Boni Gol Bridge Infrastructure Boni Road ú Bridge Mastuj Kosht ! Other Public Building Road retaining structures Power House ! Road Oweer Water Supply Reshun Powerhouse Charun Road River Shogore Union Council Boundary Chitral Flash Flood (Monsoon 2015) Glacial lake outburst, Cloud outburst and Flash floods hit different parts of District Chitral at midnight 16th July, 2015 Provincial Boundary causing extensive damages to houses, mosques, bridges, roads, irrigation and water channels. The communication infrastructure has also been severely affected. Fortunately, in all this devastation, human loss of life has been minimum with only two deaths reported so far. A sizeable portion of population has been cut off which necessitates immediate restoration of roads and bridges. Damage Infrastructure Detail is as under: Infrastructure Nature of Damage Locality / Valleys Partial Full Non- Damage Functional Creation Date: JULY 22, 2015 Roads Blocked - Non- 1. Bumborate to Ayun Road washed away at Suspension Functional Oshaan and Dobasch (100m each). Projection/Datum: WGS 84 Geographic Garamchashma Bridge at 2. Birir vally Road Page Size: A3 Road blocked Shoogoor 3. Rumboor to Ayun Road 4. Dobash to Rumboor Road (2&3 Km) Karimabad 5. Dobash to Bamorate Road (hillside slips & retaining walls at various locations) ¯ Raeen Gol Road 6. Shishi Koh to Madaklasht Road (washed away at Laavi 0 5 10 20 LaspurGol, 150 m length). KM 7. Garamchashma Road blocked at Shghore, Shali, Lot Koh Danin Seen Lasht, Pachilli and Singore). 0 8. Main Chitral-Boni Road at Koragh 300 m at 30 KM#64 and KM$46 to KM#48. 330 9. Reshun Powerhouse Road. 10. Chitral-Drosh West Road at Dome Shoghore Power Chitral, Orghouch heavy flood, Drosh Area. 60 House 11. Raeen Gol Road Trukow Road (partial 300 Chitral damages) 12. Road retaining structures washed away at Reshun (Boni Mastuj Road). M.c 270 90 Chitral Bridges - Fully - 1. Damages to Suspension bridge at Osaik & +92.51.282.0449/835.9288|[email protected] Water Drosh All Rights Reserved - Copyright 2015 2. Suspension bridge at Shoogoor washed away www.alhasan.com Supply 3. 02 Bridges on Brughal Road DISCLAIMER: Koh 4. Bridge on Rech Road Other 5. Boni Gol Bridge ALL RIGHTS RESERVED Public 6. Awi Bridge This product is the sole property of ALHASAN SYSTEMS Damages 7. Suspension bridge connecting Koragh and [www.alhasan.com] - A Knowledge Management, Business Koshar Valley. Psychology Modeling, and Publishing Company. The product 8. RCC Bridge at Goldeh Broze and Approach roads. is brought to you free of cost in digital format for information purposes only. The product might have not been prepared for Powerhouse - Fully Non- Damage to Intake of Chitral Power House, power or be suitable for legal, engineering, or surveying purposes. For further detail and metadata information please call Rumboor to Functional supply suspended in Chitral. Local Electricity line in Broze, Shali are also damaged. Rumboor Powerhouse. ALHASAN SYSTEMS at +92.51.282.0449 / 835.9288 or Ayun Road Water Supply - - - WSS Juhhore, Chitral Gol, Broze Drosh, Bumborate, email us at [email protected] Ayun, Koghuzi and Gaherait are damaged due to flood. Dobash to Broze Rumboor Road Other Public - - - Chitral Scouts Mess Bumburate sustained partial Buildings damage. Mosque in Shali have also been completely (2&3 Km) damaged. Water level in River Chitral at different locations is rising with continuous rainfall. Embankments at vulnerable points are required to Kyrgyzstan Dobash to Uzbekistan Tajikistan Bamorate Birir protect communities from overflow of river and nullahs in the above mentioned affected areas. Bumborate Road vally Turkmenistan China Ayun The available machineries and manpower have been deployed for temporary opening of suspended traffic to restore communication to Ayun Road with cut-off areas. The quantum of work requires heavy machinery at the disposal of district administration. District administration is in dire need of technical expertise and heavy machinery from National Highway Authority to augment the efforts and resources of GILGIT Road BALTISTAN Works & Services Department (C&W and PHE). C&W Department Chitral has no approved AOM&R contract agreement for CFY KHYBER Sheshi 2015-16, therefore the response to the emergency will be initiated with available machinery and staff with the help of AOM&R PAKHTUNKHWA Koh Contractors for the last year (2014-15), wherein authorization from KPPRA is required for immediate response to the emergency INDIAN satiation for deployment of additional resources. Afghanistan ICT OCCUPIED Shishi Koh to Water supply to Chitral town has not been restored, while temporary arrangement of water supply through water tankers have been AJK KASHMIR Madaklasht Road carried out. Immediate restoration of water supply channel of Chitral Town is under process. FATA Irrigation Department has been tasked to immediately start channelization and clearance of debris from Drosh Gol, Kalkatak Gol PUNJAB and Chukidam. Pakistan Chief Municipal Officer has been tasked for proper arrangement for drinking water supply from Golen Gol water supply line and Nepal Drosh 1 start work on Anghar Ghon WSU on emergent basis. BALOCHISTAN District Administration has started restoration of cut off sites from limited available resources. PDMA has authorized Deputy Iran Commissioner to utilize the relief fund for relief activities. While, Revenue staff has been deputed to the sites for detailed India Drosh 2 assessments and verification of damages. Director NHA has also visited Chitral and NHA has cleared the main road for traffic. SINDH Chitral PDMA is continuously monitoring the situation and is in constant loop with all the stakeholders concern to restore public facilities in the affected areas. PDMA has also entrusted District Administration with the requisite funds for relief activities. - Drosh Damages to S uspension West Road Asherat bridge ISSN 2410-5538(D) ISSN 2410-4027(P) 205-C 2nd Floor, Evacuee Trust Complex, F-5/1, Islamabad 195-1st Floor, Deans Trade Center, Peshawar Cantt; Peshawar Landline: +92.51.282.0449, +92.91.525.3347 E-mail: [email protected], Website: www.alhasan.com IDP IDP IDP CRISIS RESPONSE BULLETIN 2 ©Copyright 2015 ISSN 2410-5538(D) ISSN 2410-4027(P) ALHASAN SYSTEMS PRIVATE LIMITED 205-C 2nd Floor, Evacuee Trust Complex, Sector F-5/1, Islamabad, 44000 Pakistan 195-1st Floor, Deans Trade Center, Peshawar Cantt; Peshawar, 25000 Pakistan For information: Landline: +92.51.282.0449, +92.91.525.3347 Email: [email protected] Facebook: http://www.facebook.com/alhasan.com Twitter: @alhasansystems Website: www.alhasan.com ALHASAN SYSTEMS is registered with the Security & Exchange Commission of Pakistan under section 32 of the Companies Ordinance 1984 (XL VII of 1984). ALHASAN SYSTEMS is issuing this Crisis Response [CR] Bulletin free of cost for general public benefit and informational purposes only. Should you have any feedback or require further details and Metadata information please call us at Landline: +92.51.282.0449, Fax: +92.51.835.9287 or email at [email protected]. LEGAL NOTICES The information presented in this publication, including text, images, and links, are provided "AS IS" by ALHASAN SYSTEMS solely as a convenience to its clients and general public without any warranty of any kind, either expressed or implied, including, but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. ALHASAN SYSTEMS assumes no responsibility for errors or omissions in this publication or other documents which are referenced by or linked to this publication. This publication could include technical or other inaccuracies, and not all information/ services referenced herein are available in all areas. Changes are periodically added to the publication, and ALHASAN SYSTEMS may change the information or services described in this publication at any time. Should you choose to respond directly to ALHASAN SYSTEMS with comments, questions, suggestions, ideas or the like relating to this publication and ALHASAN SYSTEMS other services and products, you agree that such information shall be deemed as non-confidential and ALHASAN SYSTEMS shall have no obligation to respond and be free to reproduce, use, disclose and distribute the information to others without limitation, including but not limited to developing, manufacturing, and marketing products incorporating such information. For further explanation of these legal notices please contact [email protected].
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages47 Page
-
File Size-