2019 DNNP Annual Report

2019 DNNP Annual Report

OPG Proprietary Document Number: Usage Classification: Report NK054-REP-01210-00115 N/A Sheet Number: Revision: R001 Title: 2019 DARLINGTON NEW NUCLEAR PROJECT ANNUAL REPORT © Ontario Power Generation Inc., 2020. This document has been produced and distributed for Ontario Power Generation Inc. purposes only. No part of this document may be reproduced, published, converted, or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc. 2019 Darlington New Nuclear Project Annual Report NK054-REP-01210-00115-R001 2020-03-11 Order Number: N/A Other Reference Number: N/A OPG Proprietary Prepared By: Reviewed By: Senior Technical Date Senior Technical Date Engineer Darlington New Officer Darlington New Nuclear Project Nuclear Project Approved By: Reviewed By: Manager Date Section Manager Date Darlington New Nuclear Darlington New Nuclear Development Project Associated with document type REP N-TMP-10010-R012, Controlled Document or Record (Microsoft® 2016) OPG Proprietary Document Number: Usage Classification: Report NK054-REP-01210-00115 N/A Sheet Number: Revision Number: Page: R001 2 of 20 Title: 2019 DARLINGTON NEW NUCLEAR PROJECT ANNUAL REPORT Table of Contents Page Revision Summary ...................................................................................................................... 4 Overview ..................................................................................................................................... 5 1.0 MANAGEMENT SYSTEMS.......................................................................................... 7 1.1 Management System Implementation ........................................................................... 7 2.0 HUMAN PERFORMANCE MANAGEMENT ................................................................. 7 2.1 Personnel Qualifications and Competencies ................................................................. 7 3.0 OPERATING PERFORMANCE ................................................................................... 7 3.1 Conduct of Site Preparation Activities ........................................................................... 7 3.2 Summary of Permits or Authorizations Applied for, or Obtained from Other (Non- CNSC) Regulatory Authorities ...................................................................................... 8 3.3 Summary of Reportable Events and Actions Taken to Prevent Recurrence .................. 8 4.0 CONVENTIONAL HEALTH AND SAFETY .................................................................. 8 4.1 Occupational Health and Safety Performance .............................................................. 8 5.0 ENVIRONMENTAL PROTECTION .............................................................................. 8 5.1 Environmental Excursions ............................................................................................ 8 6.0 EMERGENCY MANAGEMENT AND FIRE PROTECTION .......................................... 9 6.1 Emergency Response and Fire Prevention Provisions ................................................. 9 7.0 WASTE MANAGEMENT .............................................................................................. 9 7.1 Hazardous Waste Management ................................................................................... 9 8.0 SECURITY ................................................................................................................... 9 8.1 Security Events............................................................................................................. 9 9.0 SITE SPECIFIC REQUIREMENTS ............................................................................. 10 N-TMP-10010-R012 (Microsoft® 2016) OPG Proprietary Document Number: Usage Classification: Report NK054-REP-01210-00115 N/A Sheet Number: Revision Number: Page: R001 3 of 20 Title: 2019 DARLINGTON NEW NUCLEAR PROJECT ANNUAL REPORT 9.1 OPG Commitments Status for Power Reactor Site Preparation Licence ..................... 10 9.2 Environmental Assessment Follow-up Results ........................................................... 11 9.3 Financial Guarantee/Preliminary Decommissioning Plan ............................................ 12 9.4 Public Information and Indigenous Initiatives .............................................................. 12 9.5 Other Supporting Activities ......................................................................................... 12 9.5.1 Licence Renewal Activities ......................................................................................... 12 9.5.2 DNNP Land Maintenance and Management ............................................................... 13 10.0 SUMMARY ................................................................................................................. 13 11.0 REFERENCES ........................................................................................................... 14 Appendix A: STATUS OF DNNP REGULATORY COMMITMENT DELIVERABLES ...............16 Table A-1 – Closed DNNP Regulatory Commitment Deliverables ............................................. 16 Table A-2 – Status of Active DNNP Regulatory Commitment Deliverables ............................... 18 N-TMP-10010-R012 (Microsoft® 2016) OPG Proprietary Document Number: Usage Classification: Report NK054-REP-01210-00115 N/A Sheet Number: Revision Number: Page: R001 4 of 20 Title: 2019 DARLINGTON NEW NUCLEAR PROJECT ANNUAL REPORT Revision Summary Revision Number Date Comments R001 2020-03-11 Corrected non-intent typos from R000. R000 2020-03-06 Initial Issue N-TMP-10010-R012 (Microsoft® 2016) OPG Proprietary Document Number: Usage Classification: Report NK054-REP-01210-00115 N/A Sheet Number: Revision Number: Page: R001 5 of 20 Title: 2019 DARLINGTON NEW NUCLEAR PROJECT ANNUAL REPORT Overview Ontario Power Generation Inc. (OPG) currently holds the Nuclear Power Reactor Site Preparation Licence (PRSL) 18.00/2022 (hereinafter “the Licence”) to prepare the site for the future construction and operation of a new Nuclear Generating Station (hereinafter “the new nuclear facility”) at Darlington New Nuclear Project (DNNP) site located in the Municipality of Clarington, in the regional municipality of Durham, in the province of Ontario. The Licence is valid from August 17, 2012 to August 17, 2022 and allows OPG to conduct the following site preparation activities for the future new nuclear facility: a) Construction of access control measures; b) Clearing and grubbing of vegetation; c) Excavation and grading of the site; d) Installation of services and utilities; e) Construction of administrative and physical support facilities inside future protected area; f) Construction of environmental monitoring and mitigation systems; and g) Construction of flood protection and erosion control measures. In 2013, the Government of Ontario deferred the construction of the new nuclear facility at DNNP site but requested OPG to maintain the Licence. To date, OPG has not received further direction to proceed with the project, hence none of the site preparation activities, listed above, have been carried out and no Engineering Procurement and Construction Company (EPC Co.) has been contracted. Licence Condition 4.3 of the Licence requires OPG to submit an annual report to the Canadian Nuclear Safety Commission (CNSC) on the licenced activities and information as listed in Section 3.4.3 of the Licence Conditions Handbook. This 2019 Annual Report for DNNP fulfills the above requirement for the reporting period from March 1, 2019 to March 1, 2020. Highlights of performance and activities associated with the Licence for the reporting period include: No reportable events related to security, fire and emergency, occupational health and safety, and environmental excursion. The DNNP Commitments Report was updated, the revision R003, has been accepted by the CNSC (Reference 1). Progress on the following long lead time commitments continue to advance: o Mitigation measures for the potential loss of Bank Swallow nesting habitat (commitments D-P-3.8 and D-P-12.5): Bank Swallow monitoring studies continued in the reporting period. OPG has removed the earthen mound artificial Bank Swallow nesting habitat at the DNNP site following six N-TMP-10010-R012 (Microsoft® 2016) OPG Proprietary Document Number: Usage Classification: Report NK054-REP-01210-00115 N/A Sheet Number: Revision Number: Page: R001 6 of 20 Title: 2019 DARLINGTON NEW NUCLEAR PROJECT ANNUAL REPORT consecutive years of Bank Swallows nesting absence. OPG continues to explore other artificial nesting structure options. o Deep Water Aquatic and Fish Community Characterization (Commitment D- C-1.2). The 2019 characterization reconfirmed the 2018 study conclusion that having the intake and diffuser at depths beyond 15 meters does not appear to be advantageous with respect to reducing potential fish impingement. This conclusion stands. Similarly, it also concluded that siting of the intake and diffuser at depths beyond 15 meters does not appear to be advantageous with respect to reducing potential fish entrainment. o Baseline Updates (Commitments D-P-12.3 to D-P-12.6): Sediment and surface water sampling, adult fish community surveys, Least Bittern and Bobolink surveys and base flow monitoring at Darlington Creek were conducted to support the future completion of deliverable of their respective

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us