BRIGHAM CITY TRANSIT CORRIDOR STUDY Prepared for the Utah Transit Authority and Brigham City Corporation

BRIGHAM CITY TRANSIT CORRIDOR STUDY Prepared for the Utah Transit Authority and Brigham City Corporation

BRIGHAM CITY TRANSIT CORRIDOR STUDY Prepared for the Utah Transit Authority and Brigham City Corporation Final Report November 2007. Project Number 060158 Table of Contents Executive Summary ............................................................................1 Introduction.................................................................................................1 Process ......................................................................................................1 Study Area Characteristics .........................................................................2 Purpose and Need......................................................................................4 Corridor Analysis ........................................................................................4 Modal Analysis ...........................................................................................6 Station Planning .........................................................................................7 Recommendations......................................................................................8 Chapter One: Process........................................................................1 Committees ................................................................................................2 Management Group ............................................................................................... 2 Study Team............................................................................................................ 2 Policy Group........................................................................................................... 2 Stakeholder Group................................................................................................. 2 Committee Membership......................................................................................... 3 Public Involvement .....................................................................................3 Policy Group Meeting............................................................................................. 4 Stakeholder Group Meetings ................................................................................. 4 Open House........................................................................................................... 4 Agency Involvement ...................................................................................4 Other Relevant Plan Documents ................................................................5 Chapter Two: Study Area Characteristics ..........................................7 Study Area..................................................................................................7 Land Use ....................................................................................................7 General Plan .......................................................................................................... 8 Demographics ............................................................................................8 Population .............................................................................................................. 8 Employment ......................................................................................................... 10 Transportation Facilities ...........................................................................12 Highway ............................................................................................................... 13 Transit .................................................................................................................. 13 Rail ....................................................................................................................... 15 Chapter Three: Travel Pattern Analysis...........................................17 Work Trip Travel Demand ........................................................................17 Work Trip Mode Share .............................................................................21 Base Year Transit Ridership.....................................................................23 Travel Time...............................................................................................24 Chapter Four: Purpose & Need........................................................25 Reduce Auto Dependency........................................................................25 Provide High-Quality Transportation Options ...........................................28 Promote Economic Development .............................................................30 Chapter Five: Corridor Analysis .......................................................33 US-89, Brigham City to Pleasant View .....................................................33 Transit .................................................................................................................. 34 Pedestrian/Bike Facilities..................................................................................... 35 Existing & Future Traffic....................................................................................... 35 Future Travel Time/Access Management............................................................ 35 Dedicated Transit Lane........................................................................................ 37 Cost...................................................................................................................... 37 I-15, Brigham City to Pleasant View .........................................................37 Transit .................................................................................................................. 38 Existing & Future Traffic....................................................................................... 38 Planned Improvements ........................................................................................ 39 Dedicated Transit Lane........................................................................................ 39 Union Pacific Railroad ..............................................................................40 Line Capacity ....................................................................................................... 40 Passenger Trains................................................................................................. 40 Freight Constraints............................................................................................... 41 Costs .................................................................................................................... 41 Chapter Six: Modal Analysis ............................................................43 Screened Alternatives ..............................................................................43 Light Rail Transit .................................................................................................. 43 Monorail ............................................................................................................... 44 Trolleys/Streetcars ............................................................................................... 44 Existing Local and Express Bus Service ............................................................. 44 Analyzed Alternatives ...............................................................................45 Option 1: Improved Bus Service ......................................................................... 45 Option 2: Bus Rapid Transit (BRT) ..................................................................... 48 Option 3: Commuter Rail Transit ........................................................................ 50 Analysis Summary....................................................................................52 Chapter Seven: Station Area Planning ............................................57 Existing Conditions and Analysis..............................................................57 Interview 1............................................................................................................ 58 Interview 2............................................................................................................ 59 Forest Street Site Visit ......................................................................................... 59 Preliminary Analysis............................................................................................. 60 Forest Street Preliminary Design Concepts..............................................62 Preliminary Concept A: ........................................................................................ 62 Train/Bus Station on South Side of Forest Street................................................ 62 Preliminary Concept B: ........................................................................................ 63 Train/Bus Station on North Side of Forest Street ................................................ 63 Preliminary Concept C: ........................................................................................ 64 Bus Station on North Side of Forest Street.......................................................... 64 Forest Street Detailed Design Concepts ..................................................64 Detailed Design Concept A:................................................................................. 65 Bus Station on Forest Street...............................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    154 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us