Final Engineering Report 09/2009 M3 Section: Comrat South to Ciumai

Final Engineering Report 09/2009 M3 Section: Comrat South to Ciumai

FINAL ENGINEERING REPORT 09/2009 M3 SECTION: COMRAT SOUTH TO CIUMAI VOLUME 1: MAIN TEXT EUROPEAN UNION REPUBLIC OF MOLDOVA FEASIBILITY STUDY FOR THE REHABILITATION AND EXTENSION OF THE ROAD M3 CHISINAU – GIURGIULESTI/ROMANIAN BORDER Europe Aid/125919/C/SER/MD Koblenz, Germany Chisinau, Moldova Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Final Engineering Report: Comrat South to Ciumai REPORT COVER PAGE Project Title: Feasibility Study for the Rehabilitation and Extension of the Road M3 Chisinau - Giurgiulesti/Romanian Border Contract Number: 2008/156-690 Countries: Republic of Moldova Name: Local Recipient EC Consultant Republic of Moldova Kocks Consult GmbH & Ministry of Transport / Universinj Ltd State Road Administration Address: Bucuriei Street 12a Chisinau MD 2004 Republic of Moldova Tel. Number: +373 22 595849 +373 22 716655 Fax Number: +373 22 748850 Contact Person: Ulrich Sprick Thomas Herz Project Director Dept. Team Leader Signatures: Date of Report: August 2009 Reporting Period: June 2008 – August 2009 Author of the Kocks Consult GMBH Report: EC M & E team ______________ ______________ _____________ [name] [signature] [date] ÉU Delegation ______________ ______________ _____________ [name] [signature] [date] ______________ ______________ _____________ [name] [signature] [date] Joint Venture Kocks Consult GmbH, Koblenz – Universinj SRL, Chisinau Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Final Engineering Report: Comrat South to Ciumai SYNOPSIS Project Title: Feasibility Study for the Rehabilitation and Extension of the Road M3 Chisinau - Giurgiulesti/Romanian Border Project 2008/156-690 Number: Country: Republic of Moldova Project Provide a bankable technical, financial, environmental and institutional feasibility objectives: study for the rehabilitation and extension of the M3 road Chisinau-Giurgiulesti / Romanian Border. Planned • Identification of Transport Needs outputs: • Assessment of technical, environmental, financial and economic feasibility • Assessment of institutional sustainability of the road rehabilitation • Detailed Technical Surveys and Engineering Design • Coordination with International Financial Institutions • Preparation of tender documents for the rehabilitation of one or two priority sections chosen Project • Conduct of traffic surveys and traffic forecasts activities: • Technical assessment of the present infrastructure • Road condition survey • Survey of factual pavement condition • Road safety assessment (black spots) • Road maintenance standards • Present traffic management • A review of the Status of institutional development and policy reforms • Evaluation criteria based on poverty indicators for rural roads and bridges • A socio-economic analysis and environmental and social impact assessment • Cost estimates for infrastructure and maintenance costs • Economic and financial cash flow calculations • Calculation of internal rates of return and net present values • Assessment of Institutional sustainability for carrying out the necessary works and maintenance tasks • Geo-technical and topographic surveys • Soil and Materials Investigations • Preliminary Design • Detailed Drawings • Technical Specifications • Design Report • Tender documents for the rehabilitation of one or two priority sections chosen based on the Feasibility study • Road Maintenance Plan including regular and periodic maintenance • Coordination with IFIs Joint Venture Kocks Consult GmbH, Koblenz – Universinj SRL, Chisinau Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Final Engineering Report: Comrat South to Ciumai TABLE OF CONTENTS ABBREVIATIONS 1. INTRODUCTION AND BACKGROUND...................................................................1 1.1 . Country Background.................................................................................................1 1.2 Project Background ..................................................................................................1 1.3 The Assignment........................................................................................................3 1.4 Sections Recommended for Improvement ................................................................3 2. TRAFFIC ................................................................................................................ 4 2.1 Data Collection ........................................................................................................ 4 2.2 Base Year Traffic..................................................................................................... 6 2.3 Traffic Characteristics of the Study Road................................................................. 7 2.4 Traffic Forecasting................................................................................................... 10 2.5 Traffic Forecast Summary........................................................................................ 14 2.6 Road Safety Analysis............................................................................................... 15 2.7 M3 Chisinau – Giurgiulesti Traffic Accident Data ..................................................... 16 2.8 Traffic Accident Patterns.......................................................................................... 17 2.9 General Safety Strategies........................................................................................ 17 3. TOPOGRAPHICAL SURVEY AND MAPPING.......................................................20 4. GEOTECHNICAL INVESTIGATION.......................................................................23 4.1 Geotechnical Overview ..........................................................................................23 4.2 Geotechnical Field Investigations and Laboratory Testing ......................................24 4.3 Evaluation and Recommendation ...........................................................................25 4.4 Construction Material Sources................................................................................26 4.5 Conclusions............................................................................................................27 4.6 Earthworks .............................................................................................................27 4.7 Operations of Borrow Pits ......................................................................................31 5. PAVEMENT CONDITION AND DESIGN................................................................32 5.1 General...................................................................................................................32 5.2 Pavement Rehabilitation Options............................................................................32 5.3 Selection of Rehabilitation Measures......................................................................33 5.4 General Design Principles ......................................................................................34 5.5 Flexible Pavement Design .....................................................................................40 5.6 Recommended Thickness of Pavement Layers ......................................................42 5.7 Pavement Materials ...............................................................................................46 5.8 Road Inventory and Surface Condition ..................................................................52 5.8.1 Road Inventory .......................................................................................................52 5.8.2 Asphalt Pavement Distress.....................................................................................52 5.8.3 Road Roughness....................................................................................................54 6. BRIDGE CONDITION AND DESIGN......................................................................56 6.1 Bridge Design ........................................................................................................56 6.2 Bridges Along the Improvement Sections........................................................................57 6.3 Classification of Existing Bridge Structures.............................................................58 6.4 Culvert and Bridge Field Inventory..........................................................................58 6.5 Bridge Condition.....................................................................................................60 Joint Venture Kocks Consult GmbH, Koblenz – Universinj SRL, Chisinau Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Final Engineering Report: Comrat South to Ciumai 6.6 Organization of Improvement Works.......................................................................61 6.7 Monitoring during Operation Period ........................................................................63 7. HYDROLOGICAL AND DRAINAGE DESIGN........................................................65 7.1 Overview ................................................................................................................65 7.2 Carrying Capacity of drainage System....................................................................65 7.3 Location specific Characteristics.............................................................................67 8. ENVIRONMENTAL IMPACT ASSESSMENT.........................................................70

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    106 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us