Joint Rail and Road Project Ringerike Line and E16

Joint Rail and Road Project Ringerike Line and E16

Railway Tender Conference 2019 Joint project Ringerike Line and E16 • New station at Sundvollen • Complete reconstruction of Hønefoss station • 40 km double tracks • 15 km motorway • Railway: opening scheduled for 2029 • Road: opening scheduled for 2027 Project status • State approval of zoning plan expected 4Q 2019 • Final Investment Decision Autumn 2020 • Prequalification for first main contract end 2020/beginning 2021 • Start-up for main preparatory works in 2021 (Prequal 3-4Q 2020) • Preparation of roads and traffic safety works • Access tunnels at Nordby and Avtjerna (190.000 solid m3) • Preparation of rig areas • Forest clearing • Noise prevention measures Ringerike Line and E16 Highway ERTMS TK07 Project summary – railway and highway • 40 km new double track railway from Sandvika to Hønefoss designed for a max speed of 250 km/h • 15 km four lane highway from Høgkastet to Hønefoss/Ve, designed for max speed 110 km/h • Complete rebuild of existing railway station at Hønefoss • Estimated project value 34 billion NOK Project summary – tunnels and bridges • 23 km double track railway tunnel with parallel escape and service tunnel from Sandvika to Sundvollen • 3 km double track railway tunnel at Vik • 2 x 3 km 2-lane highway tunnels at Vik • 770 m double track railway bridge across Kroksund • 640 m 4-lane highway bridge across Kroksund • Bridge crossing of the river and wetlands at Mælingen: • Alt 1: Two railway bridges (300 m + 900 m) plus three highway bridges (1 x 300 m + 2 x 900 m) with an embankment in-between • Alt 2: One railway bridge (1800 m) plus two highway bridges (2 x 1800 m) Requirements for model-based engineering • The project will be fully model based and according to the Road and Rail Authorities' BIM-strategies • Standardised requirements for model based engineering and building are now implemented across the contracts focusing on: • Standardised formats per discipline • Standardised information per discipline • Model based reviews and interface checks Distribution and reuse of excavated materials • 9,8 million m3 of excavated materials will be distributed and reused in the project • 70% embankments, quality masses and concrete aggregates • 30% landfill and preparation of land for future construction of homes Contract Structure Ringerike Line and E16 Highway TK-01 Jong TK-02 Sollihøgda TK-03 Sundvollen TK-04 Vik TK-05 Mælingen TK-06 Hønefoss Preparatory / Enabling works Several contracts (construction only) Design substructure rail and road TK-01 (EPC) TK-02 (EPC) TK-03 (EPC) TK-04 (EPC) TK-05 (EPC) TK-06 (ECI/EPC) Build substructure rail and road Tracks, overhead contact line, TK-07 (EPC) high/low Railway Technique woltage, telecom Signal ERTMS Railway systems Description Scope Contract type and Contract notice Commencem Completion strategy ent Ringerike Line TK-06 Super structure, overhead Subcontract or JV 2021 2023 2029 railway systems contact line, HV/LV and to alliance Hønefoss. telecom. Combination of agreement newbuild and rebuild. Complete rebuild of existing railway station at Hønefoss during operation. Ringerike Line TK-07 35 km double track, EPC 2023 2025 2029 Railway systems superstructure, overhead Jong-Styggedalen contact line, HV/LV and telecom. Project Values and Key Dates Ringerike Line and E16 Highway • Total project value: 34 BILLION NOK • Railway in operation: 2029/30 • Highway in operation: 2028 Preliminary Dates for Prequalification Prequal. 2021 Prequal. 2021 Prequal. 2021 Hønefoss EPC EPC EPC TK-01 Jong TK-03 Sundvollen TK-05 Mælingen Sundvollen Tunnel Tunnel, station and Bridges bridges Civil Sandvika Oslo S works Prequal. 2020/21 Prequal. 2022 Prequal. 2021 Lysaker EPC EPC ECI / EPC TK-02 Sollihøgda TK-04 Vik TK-06 Hønefoss Tunnel Tunnels, bridges Civil works and and open railway systems landscape Prequal. 2023 Railway EPC systems TK-07 Railway Systems excl. ERTMS and Hønefoss railway station area Ringerike Line and E16 Highway For project information, please see: Bane NOR’s home page: www.banenor.no Project home page: www.banenor.no/prosjekter/prosjekter/RingeriksbanenogE16 Supplier contact: [email protected] Thank you for your attention.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us