Invitation for Bids

Invitation for Bids

General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK Sheet 1 of 3 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY C1.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for Inspectionand Test Plan, Testing and Commissioning Management Plan. C1.2 Completion of installation and site testing of the Trackwork, platform edge and level clearance of the following stations: (a) PRI Area at Depot (b) Depot (c) East Valenzuela (d) Quirino Highway (e) Tandang Sora (f) North Avenue (g) Quezon Avenue (h) East Avenue (i) Anonas (j) Katipunan (k) Ortigas North (l) Ortigas South (m) Kalayaan Avenue (n) Bonifacio Global City Total of Sheet 1 of Schedule C1 carried forward to Sheet 2: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-58 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK Sheet 2 of 3 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 1: (o) Lawton (p) Senate (q) Terminal 3 C1.3 Completion of installation and site testing of the Trackwork, switches, turnout, crossovers, scissors, clearance from sidewalks and signal posts and catenary heights for the followings: (a) Depot to East Valenzuela Station (b) East Valenzuela Station to Quirino Highway Station (c) Quirino Highway Station to Tandang Sora Station (d) Tandang Sora Station to North Avenue Station (e) North Avenue Station to Quezon Avenue Station (f) Quezon Avenue Station to East Avenue Station (g) East Avenue Station to Anonas Station (h) Anonas Station to Katipunan Station Total of Sheet 2 of Schedule C1: Total of Sheet 1 and Sheet 2 of Schedule C1 carried forward to sheet 3: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-59 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK Sheet 3 of 3 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 2: (i) Katipunan Station to Ortigas North Station (j) Ortigas North Station to Ortigas South Station (k) Ortigas South Station to Kalayaan Avenue Station (l) Kalayaan Avenue Station to Bonifacio Global City Station (m) Bonifacio Global City Station to Lawton Station (n) Lawton Station to Senate Station (o) Senate Station to Food Terminal Inc. (FTI) Station. Demarcation point shall be at the Buffer stop toward FTI direction after Terminal 3 Turnout. (p) Senate Station to Terminal 3 Station C1.4 Obtain Notice of No Objection or Notice of No Objection With Comment(s) from the Engineer for Acceptance Test. C1.5 Completion of the remaining works. Total of Sheet 3 of Schedule C1: Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C1 carried forward to Summary of Cost Centre C: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-60 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM Sheet 1 of 4 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY C2.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for InspectionTest Plan (ITP), prior to Testing and Commissioning Management Plan. C2.2 Completion of installation, site testing and integrated testing for all sub-systems for the Signaling at theDepot, all station equipment &Waysidesuch as ATO and Interlocking including racks, point machines, track circuit, cabling and terminationsfor the followings: (a) PRI Building and Track section Area at Depot (b) Depot (c) East Valenzuela (d) Quirino Highway (e) Tandang Sora (f) North Avenue (g) Quezon Avenue (h) East Avenue (i) Anonas (j) Katipunan Total of Sheet 1 of Schedule C2 carried forward to Sheet 2: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-61 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM Sheet 2 of 4 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 1: (k) Ortigas North (l) Ortigas South (m) Kalayaan Avenue (n) Bonifacio Global City (o) Lawton (p) Senate (q) Terminal 3 C2.3 Completion of installation, site testing, system integration testing of all sub-systems for the Signaling system at Stations and Wayside equipment including Train Detection System, On-board, train to wayside & train to train communication devices, junction boxes, cabling and terminations for the following: (a) PRI Building and Track section Area (inclusive) at Depot (Exclusive) (b) Depot(inclusive)to East Valenzuela Station (Exclusive) (c) East Valenzuela Station (inclusive) to Quirino Highway Station (exclusive) (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) Total of Sheet 2 of Schedule C2: Total of Sheet 1 and Sheet 2 of Schedule C2 carried forward to sheet 3: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-62 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM Sheet 3 of 4 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 2: (e) Tandang Sora Station (inclusive) to North Avenue Station (exclusive) (f) North Avenue Station (inclusive) to Quezon Avenue Station (exclusive) (g) Quezon Avenue Station (inclusive) to East Avenue Station (exclusive) (h) East Avenue Station (inclusive) to Anonas Station (exclusive) (i) Anonas Station (inclusive) to Katipunan Station (exclusive) (j) Katipunan Station (inclusive) to Ortigas North Station (exclusive) (k) Ortigas North Station (inclusive) to Ortigas South Station (exclusive) (l) Ortigas South Station (inclusive) to Kalayaan Avenue Station (exclusive) (m) Kalayaan Avenue Station (inclusive) to Bonifacio Global City Station (exclusive) Total of Sheet 3 of Schedule C2: Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C2 carried forward to Sheet 4: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-63 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM Sheet 4 of 4 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 3: (n) Bonifacio Global City Station (inclusive) to Lawton Station (exclusive) (o) Lawton Station (inclusive) to Senate Station (exclusive) (p) Senate Station (inclusive) to Food Terminal Inc. (FTI) Station (exclusive) Demarcation point shall be at the Buffer stop toward FTI direction after Terminal 3 Turnout. (q) Senate Station (exclusive) to Terminal 3 Station (inclusive) C2.4 Completion of installation, site testing and integrated testing for all sub-systems for Onboard equipment. C2.5 Completion of System Acceptance Test. C2.6 Completion of the remaining works. Total of Sheet 4 of Schedule C2: Total of Sheet 1, Sheet 2, Sheet 3 and Sheet 4 of Schedule C2 carried forward to Summary of Cost Centre C: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-64 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C3 – INSTALLATION & TESTING OF TELECOMMUNICATION SYSTEM Sheet 1 of 4 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY C3.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for Inspection Test Plan, Testing and Commissioning Management Plan. C3.2 Completion of installation, site testing and integrated testing for all sub-systems for the Communications System for all indoor equipment and waysidefor the following: (a) PRI Building and Track section Area at Depot (b) Depot (c) East Valenzuela (d) Quirino Highway (e) Tandang Sora (f) North Avenue (g) Quezon Avenue (h) East Avenue (i) Anonas (j) Katipunan (k) Ortigas North Total of Sheet 1 of Schedule C3 carried forward to Sheet 2: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-65 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C3 – INSTALLATION & TESTING OF TELECOMMUNICATION SYSTEM Sheet 2 of 4 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 1: (k) Ortigas South (l) Kalayaan Avenue (m) Bonifacio Global City (n) Lawton (o) Senate (p) Terminal 3 C3.3 Completion of installation, site testing and integrated testing for all sub-systems for the Communications

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us