YERBA BUENA ISLAND INTERIM GRADING FOR WATER TANK AREA YERBA BUENA ISLAND PROJECT Sub-Phase 1YA & 1YB City and County of San Francisco, California PROJECT MANUAL BID SPECIFICATIONS VOLUME II TECHNICAL SPECIFICATIONS Prepared By: Treasure Island Community Development, LLC (“Owner”) c/o Lennar Urban One Sansome Street Suite 3200 San Francisco, California 94104 May 10, 2016 Yerba Buena Island – Interim Grading for Water Tank Area Sub-Phase 1YA & 1YB SECTION 00010 TABLE OF CONTENTS Introductory Information Section Title 00001 Title Page 00010 Table of Contents 00015 List of Project Drawings 00020 Contract Division 0 Proposal Documents and General Conditions Section Title 00100 Notice to Bidders 00200 Instructions to Bidders 00210 Employment and Contracting Policies 00410 Bid Form 00435 Designated Subcontractors List 00480 Non-Collusion Affidavit 00800 Supplementary Conditions 00802 Contract Time & Liquidated Damages 00810 Existing Conditions 00811 Unforeseen or Differing Site Conditions 00812 Bidder’s Site Visit 00813A Noise Control Ordinance 00813B Industrial Waste Ordinance No. 116-97 00813C Department of Public Works Order No. 158170 00820 Health & Safety Plan Division 1 General Requirements Section Title 01010 Summary of Work 01025 Measurement and Payment 01032 Photographic Documentation 01035 Modification Procedures 01040 Coordination 01041 Contractor’s Project Management Team 01050 Field Engineering 01060 Regulatory Requirements 01090 Reference Standards 01200 Project Meetings 01300 Submittals 01310 Progress Schedules 01400 Quality Control 01500 Environmental Compliance 01500A Environmental Health and Safety Plan 01500B Sampling and Analysis Plan 01500C Stormwater Pollution Prevention Plan (SWPPP) 00010-1 Table of Contents YERBA BUENA ISLAND 100% IMPROVEMENT PLANS SUB-PHASE 1YA & 1YB STANDARD SPECIFICATION 4/25/2016 TABLE OF CONTENTS TECHNICAL SPECIFICATIONS – 100% DESIGN SET DIVISION 1– GENERAL REQUIREMENTS 01570 Traffic Routing Work DIVISION 2 – SITEWORK 02050 Demolition 02140 Dewatering 02200 Earthwork 02225 Excavation, Backfilling and Compacting for Utilities 02230 Tree Protection 02310 Finished Grading 02512 Low Pressure Water 02536 Separate Storm Drain 02537-01 Pipe Size and Material Summary 02580 Signing, Pavement Markings, and Curb Painting 02740 Asphalt Concrete Pavement 02910 Hydroseed 02921 -02 Erosion Control 03300 Cast-in-Place Concrete TABLE OF CONTENTS YERBA BUENA ISLAND 100% IMPROVEMENT PLANS SUB-PHASE 1B, 1C & 1E STANDARD SPECIFICATION 3/2/2016 SECTION 01570 TRAFFIC ROUTING WORK PART I - GENERAL 1.1 WORK INCLUDED A. The Contractor shall prepare a traffic control plan as required by the SFMTA or other regulatory agency for all phases of work. B. The Contractor shall comply with all requirements set forth in the “YERBA BUENA ISLAND Construction Traffic Management Program dated XXXX” provided in the project Reference documents. 1.2 APPLICABLE STANDARDS A. In addition to compliance with this specification, the Contractor shall comply with all applicable requirements of the latest editions of the following: 1. California Vehicle Code. 2. San Francisco Municipal Code, Chapter XI- Traffic Code. 3. Other Applicable Regulations. 4. Standard Specifications, Department of Public Works, City and County of San Francisco. 5. Standard Specifications and Plans, Department of Transportation, State of California (Caltrans Standard Specifications and Caltrans Standard Plans) except as modified herein. 6. Manual of Traffic Controls for Construction and Maintenance Work Zones, Department of Transportation, State of California. 7. Regulations for Working in San Francisco Streets (“Blue Book”), Department of Parking and Traffic, City and County of San Francisco. 8. Regulations for Excavating and Restoring Streets in San Francisco, Department of Public Works, City and County of San Francisco. 9. Work Area Traffic Control Handbook, BNI Books. 1.3 SUBMITTALS A. The Contractor shall make the following submittals and obtain written approval from the traffic engineer before starting any work in the streets: 1. Traffic Control Plans 2. Storage and Parking Plan 3. Sign Inventory Form B. Traffic Control Plans shall be prepared, signed and stamped by a professional engineer or a traffic engineer (registered in the State of California) with the assistance and input of the traffic supervisor and the Contractor’s Superintendent in accordance with the Transportation and Disposal plan provided in Section 01500A. TRAFFIC ROUTING WORK 01570-1 YERBA BUENA ISLAND 100% IMPROVEMENT PLANS SUB-PHASE 1B, 1C & 1E STANDARD SPECIFICATION 3/2/2016 The Traffic Control Plan shall be reviewed and approved by SFMTA as required. All work required by the Approved Traffic Control Plan shall be performed at the Contractors expense. Complete traffic control and detour plans shall be submitted and approved prior to any work beginning on Project Site. No Change Orders shall be awarded due to the Contractor’s failure to secure the appropriate traffic permits for the Work. C. Sign Inventory Form(s) is/are to be submitted by the Contractor as part of the Traffic Control Plan prior to the start of the Work. The Sign Inventory Form is included at the end of this Section. Sign Inventory Forms are required for each intersection corner or other location that includes any sign relocation, sign removal, pole or traffic signal work. Sign Inventory Forms shall accurately reflect all existing traffic control, street name, and other City signs at the required location(s). D. Storage and Parking Plans. The Contractor shall submit plans for materials storage and equipment parking, for each area of the work, along with the traffic control plans. For materials storage and equipment parking, the Contractor shall comply with the latest edition of the Regulations for Excavating and Restoring Streets in San Francisco, Department of Public Works, City and County of San Francisco. Storage, stockpiling or placement shall not in any way obstruct any lane or passageway intended for vehicular or pedestrian traffic. Storage, stockpiling, or placement of any equipment, materials or supplies within the area of any public street or alley, including the sidewalks thereof, will be allowed only with approved storage and parking plans by the traffic engineer. If the engineer determines that such storage, stockpiling or placement causes a violation of the foregoing or of any law or order of any regulatory body having jurisdiction, the Contractor shall cease or modify the storage, stockpiling or placement as necessary to comply with the specifications, laws and orders. PART 2 – PRODUCTS 2.1 GENERAL A. All products used for Traffic Control shall be as required by the SFMTA’s “Blue Book”. PART 3 - EXECUTION 3.1 GENERAL A. The Contractor shall establish contact with the SFMTA prior to commencement of the Work to ensure that it has secured all the necessary permits for the Work. END OF SECTION TRAFFIC ROUTING WORK 01570-2 YERBA BUENA ISLAND 100% IMPROVEMENT PLANS SUB-PHASE 1B, 1C & 1E STANDARD SPECIFICATION 3/2/2016 Appendix Sign Inventory Form Date: Contract No: Sign Location Side Double sided Sign Comments Type x’ from property of St. Single sided Description line of cross st. Contractor’s Signature TRAFFIC ROUTING WORK 01570-3 YERBA BUENA ISLAND 100% IMPROVEMENT PLANS SUB-PHASE 1B, 1C & 1E STANDARD SPECIFICATION 3/2/2016 SECTION 02050 DEMOLITION PART 1 - GENERAL 1.1 REFERENCE STANDARDS A. Standard Specifications of the City and County of San Francisco, Department of Public Works, Bureau of Engineering (SSDPWSF), Latest Edition, also referred to as “City Standard Specifications.” B. Standard Plans of the City and County of San Francisco, Department of Public Works, Bureau of Engineering (SPDPWSF), Latest Edition, also referred to as “City Standard Plans.” C. Department of Public Works (DPW) Order No. 176,707 "Regulations for Excavating and Restoring Streets in San Francisco", approved March 26, 2007. D. Design Geotechnical Report, Yerba Buena Island Major Phase 1, Sub-Phases 1B, 1C, 1E Infrastructure Improvements, prepared by ENGEO Inc., dated XXXX. E. California Health and Safety Code 1.2 RELATED SECTIONS Section 02200, “Earthwork” Section 02225, “Excavation, Backfilling and Compacting for Utilities”. 1.3 SUMMARY A. Section includes (but is not necessarily limited to): 1. Demolition and removal of existing improvements as indicated on the Drawings 2. Requirements for addressing complaints received by the Contractor B. Full compensation for conforming to the requirements of this Section shall be considered as included in the Contract Lump Sum Price and no additional compensation will be allowed therefore. C. Information for the Contractor's use in preparing the demolition plan is provided in this Section. 1.4 DEMOLITION PLAN A. The Contractor shall submit a complete demolition plan to the Owner's Agent detailing procedures and sequence of the work, including traffic signing, salvage, disposal, and material handling. B. The Contractor shall thoroughly investigate the existing conditions at the site before DEMOLITION 02050-1 YERBA BUENA ISLAND 100% IMPROVEMENT PLANS SUB-PHASE 1B, 1C & 1E STANDARD SPECIFICATION 3/2/2016 proceeding with the demolition plan. C. The demolition plan shall consist of the following: 1. The removal sequence for all items. 2. Equipment locations during removal operations. 3. Temporary support shoring or temporary bracing, if necessary. 4. Details and locations of shields or other protective measures in sufficient numbers to assure that people, property and improvements will not
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages127 Page
-
File Size-