The Role of the TGV and the Future of the Lorries

The Role of the TGV and the Future of the Lorries

Evolution of the transport connection across the border: the role of the TGV and the future of the lorries Girona, 2013 AIM OF THE REPORT • How road and train network has evolved after second World War? • How land use has changed and affect on landscape? • Future of transportation in border region? THEORETICAL BACKGROUND • Cultural/landscape geography • The report approaches the concept of landscape through the land use • Main terms and aspects: • Landscape • Border • Landscape ecology • Land use LANDSCAPE AND BORDER • How human actions and transportation affect on landscape • Direct – indirect effects on landscape due to high speed rail and road network • Meaning of border • Divides Catalan area • Part of Mediterranean corridor • Border between France and Spain LAND USE AND LANDSCAPE ECOLOGY • Human use of land • Urban areas, forests, fields etc. • Landscape changes via land use • Constant change • Landscape ecology as way to analyze landscape • Interactions and conflicts between human actions and nature DATA AND METHODS • Spatial data from border area • Maps from 1945 – 2012 • Land use data from 1987 – 1997 • Articles and interviews • GIS • Evolution of transportation • Comparison of maps • Changes in land use • Land use maps • Future scenarios • Interviews • Hypothesis THE ROLE OF THE TGV Source: http://www.republica.com/wp-content/uploads/2013/05/ave_mad-bnc.jpg, 16.05.2013 WHAT IS THE TGV? • The TGV (French: Train à Grande Vitesse) is France's high-speed rail • Developed during the 1970s • The first line in Europe was inaugurated in France in 1981 between Paris – Lyon • The first line in Spain was opened in 1992 connecting the cities of Madrid – Cordoba – Sevilla • In Spain – the longest HSR network in Europe – 2,144 km • Average speed: 250-300 km/h • Record of speed: 574,8 km/h TGV LINES IN EUROPE Source: Jaume Feliu presentation HSR - ROLE • Line connecting Ibernian Peninsula with Central Europe, • In future direct high-speed connection between Barcelona – Paris, • More attractive for tourists – the numer of tourists increases, • Decrease travel time from Perpignan to Barcelona – 50 minutes instead of 2h 45min, • The HSR will boost local people mobility, • New job opportunities for people living outside the metropolian area, • Areas near the HSR will be more attractive to investors, • In the future HSR will carry more goods from the port of Barcelona FIGUERES – PERPIGNAN • Line connecting Iberian Peninsula with central Europe, • In 2001 the French and Spanish governments agreed to create a new line between Perpignan and Figueres, • Construction for building the connection between Figueres and Perpignan started in autumn 2004, • Build was completed on February 2009 and was opened for traffic on December 2010, • This section is a part of the Southern Mediterranean Europe HSR project: • Lyon–Marseille and Lyon–N×mes (in service); • Montpellier–Perpignan (in project); • Figueras–Barcelona (in service ); • Lleida–Barcelona ( in service ); • Madrid–Zaragoza–Lleida (in service) PERTHUS TUNNEL •The tunnel is located under eastern Pyrenees, and it has 8,3 km •It took 5 years to build it, and it was finished in February 2009 and opedned for traffic from December 2010 Source: Jaume Feliu presentation LAND USE CHANGES AND IMPACT ON LANDSCAPE • Focus on counties area of la Jonquera, Agullana and Capmany • Data only from Spanish side of the border • Only land use maps from 1987 to 1997 • No high speed rail • No information from last decade • No remarkable changes • Urban areas growing in la Jonquera and Capmany • Changes in woods and meadows class • Reasons: • No high speed rail • Concervation of the area INTERVIEW CROSS BORDER COOPERATION • Better transport connection between Catalonia and France enable transboundary cooperation • Examples of projects: o Cross border Hospital of La Cerdanya o Transboundary Slaughterhouse in Ur o Transborder Research and Higher Education Pole of Pyrenees – Mediterranean – project between Universities of Girona, Perpignan, Lleida and Balear Island and Paris OLD ACCESSIBILTY Source: Jaume Feliu presentation NEW ACCESSIBILITY Source: Jaume Feliu presentation THE FUTURE. 1ST SCENARIO: TGV IS A SUCCESS. • Determining factors: • People think that the price of the TGV tickets is acceptable. • Fuel price increases. • Schedule’s combination is well designed. • Cooperation between north and south regions is intensified. • People from big cities move to medium cities with TGV stations. • TGV replaces lorries in most of goods movements. THE FUTURE. 1ST SCENARIO: TGV IS A SUCCESS. • Changes in the mobility of people. They’ll use TGV instead of other transports and they will travel further. • The daily mobility will increase. • Urban sprawl that will cause the urbanization of all the territory affected by TGV lines. • Fast development of some sectors (construction, hotels, restoration, commercial). • Negative effect on the services in small cities. • TGV will become a determining factor to locate companies and industries. • Possibility to create a urban system among Girona, Figueres and Perpignan within the Catalan Eurodistrict. • Sharing of services between these 3 cities. THE FUTURE. 2ND SCENARIO: TGV IS NOT USED. • Determining factors: • People think that the price of the TGV tickets is too expensive. • Fuel price doesn’t increase. • Schedule’s combination is poorly planned. • Language is an obstacle between north and south regions and restrains cooperation. • Local actors don’t apply the good strategies and the Catalan Eurodistrict is not created. • People from big cities don’t move to medium cities with TGV stations. • Transportation by lorry keeps having more benefits. THE FUTURE. 2ND SCENARIO: TGV IS NOT USED. • The TGV is expensive and people don’t get used to it. People keep using road transports to travel. • TGV hasn’t an effect on the daily mobility. People only take it to travel on holidays. • The expectations on small cities don’t become real and there are a lot of failed construction projects. • TGV don’t contribute to the development of small cities. • TGV has no impact on the location of companies and industries. • The facilities that brings the transportation by lorries and the kind of products they transport don’t allow the TGV to replace them. • Influence of French and Spanish governments against the creation of the Catalan Eurodistrict stops this project. • With the connection with Lyon and Paris, the French influence over Perpignan increases. THE FUTURE. OTHER SCENARIOS. • Determining factors: • Influences of local, regional (Sp, Fr), European and global politics. • Role of the local actors on the development of strategies to take advantage of the opportunities that the TGV brings. • Difference between the cost of travelling by TGV or by car. • Importance of the language and cultural differences. INTERVIEWS CONCLUSIONS • How road and train network has evolved after second World War? • Network connection in border area was develop • Comunications have been developped in a north-south direction, not east-west • How land use has changed and affect on landscape? • No significant change in land use • Short term influence on landscape • Future of transportation in border region? • The future depends on the local, regional and global actors. • People has to take advantatge of the oportunities that the TGV brings..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    28 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us