Page I COUNTY AGREEMENT NUMBER XXXXXX CONTRACT

Page I COUNTY AGREEMENT NUMBER XXXXXX CONTRACT

COUNTY AGREEMENT NUMBER XXXXXX CONTRACT WITH XXXX FOR DESIGN-BUILD OF XXXX This Contract (“Contract”) is made and entered into on ________, 20XX by and between the County of San Diego, a political subdivision of the State of California, (“County”) and , a California corporation, (“Contractor”), with reference to the following facts: RECITALS A. The County, by action of the Board of Supervisors on _______, Minute Order No. __, authorized the Director of Purchasing and Contracting to award a Contract for design and construction of the _____, California. B. Contractor is specially trained and possesses certain skills, experience, education and competency to perform the work described herein. C. On , 20XX, County issued Request for Proposals No. Contractor submitted a timely and responsive proposal on or before the deadline of , 20XX, at 3:00 p.m. D. On , 20XX, County issued a notice of intent to award the Contract to Contractor. No protests pursuant to Board Policy A-97 have been filed within the time required by law. E. On XXXXX, 201X, the Contractor submitted revised Proposed Plans. F. The Contract shall consist of: 1. This agreement 2. Exhibit A Major Subcontractor List 3. Exhibit B-1 Statement of Work 4. Exhibit B-2 RFP XXXX 5. Exhibit B-3 Contractor’s Proposal dated XXXX, 2018 6. Exhibit B-4 Proposed Plans XXX dated XXX 7. Exhibit C Notice to Proceed 8. Exhibit D Performance Bond 9. Exhibit E Payment Bond 10. Exhibit F Insurance Page I NOW, THEREFORE, in consideration of the mutual promises contained herein and other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: Design-Build Design-Build Contract XXXXXX Page II TABLE OF CONTENTS SECTION 1.00 DEFINITIONS .......................................................................................................1 SECTION 1.01 PREREQUISITES; CONTRACT ADMINISTRATION ......................................3 A. INVESTIGATION REQUIRED .............................................................................3 B. PERFORMANCE OF WORK; CONTRACTORS AND SUBCONTRACTORS ............................................................................................5 C. CONTRACT ADMINISTRATION ........................................................................9 D. CHANGE ORDERS ..............................................................................................11 SECTION 1.02 SCOPE OF DESIGN BUILD RESPONSIBILITY .............................................11 A. DESCRIPTION OF WORK ..................................................................................11 B. DESIGN .................................................................................................................12 C. SCHEMATIC DESIGN .........................................................................................13 D. DESIGN DEVELOPMENT ..................................................................................13 E. CONSTRUCTION DOCUMENTS AND GMP UPDATES ................................14 F. CONSTRUCTION .................................................................................................16 G. ALL-INCLUSIVE DESIGN BUILD OBLIGATION ...........................................17 SECTION 1.03 COMMENCEMENT OF THE WORK ...............................................................21 A. COMMENCEMENT OF WORK ..........................................................................21 B. MOBILIZATION ..................................................................................................22 SECTION 1.04 BONDS; INSURANCE; INDEMNITY ..............................................................23 A. BONDS ..................................................................................................................23 B. INSURANCE .........................................................................................................24 C. INDEMNIFICATION............................................................................................24 SECTION 1.05 DRAWINGS AND SPECIFICATIONS ..............................................................26 A. INTENT .................................................................................................................26 Design-Build Design-Build Contract XXXXXX Page i B. DRAWING DETAILS AND SPECIFICATION DESCRIPTIONS ...................................................................................................26 C. SPECIFICATIONS AND DRAWINGS DO NOT CONTROL DIVISION OF WORK.......................................................................26 D. INTERPRETATION OF CONTRACT, DRAWINGS AND SPECIFICATIONS ................................................................................................26 E. CHECKING / UPDATING OF DRAWINGS .......................................................27 F. NECESSARY AND INCIDENTAL WORK ........................................................27 G. [RESERVED] ........................................................................................................27 H. STANDARDS TO APPLY WHERE DETAILED AND/OR PERFORMANCE SPECIFICATIONS ARE NOT FURNISHED ................................................................................................27 I. PRECEDENCE OF DOCUMENTS ......................................................................28 J. SHOP DRAWINGS AND SUBMITTALS TO BE FURNISHED BY CONTRACTOR IN ADDITION TO COMPLETED DESIGN DRAWINGS .................................................................29 SECTION 1.06 CONSTRUCTION BY THE COUNTY OR BY SEPARATE CONTRACTORS ..30 A. THE COUNTY'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS ........................................................................................................30 B. MUTUAL RESPONSIBILITY .............................................................................30 C. COUNTY AUTHORITY OVER COORDINATION ...........................................31 SECTION 1.07 THE COUNTY AND PAYMENT ......................................................................32 A. COMPENSATION ................................................................................................32 B. INVOICES AND PAYMENT ...............................................................................32 C. SUBSTANTIAL COMPLETION PAYMENT .....................................................37 D. FINAL PAYMENT ...............................................................................................37 E. SECURITIES IN LIEU OF RETENTION ............................................................39 F. RELEASE OF RETENTION ................................................................................40 Design-Build Design-Build Contract XXXXXX Page ii G. DISALLOWANCE ................................................................................................40 SECTION 1.08 CONTROL OF THE WORK ...............................................................................40 A. SUPERVISION OF WORK BY CONTRACTOR ...............................................40 B. OBSERVATION OF WORK BY COUNTY ........................................................41 C. ACCESS TO SITE .................................................................................................41 D. EXISTING UTILITIES .........................................................................................41 E. UNDERGROUND FACILITIES ..........................................................................42 SECTION 1.09 WARRANTY, GUARANTEE AND INSPECTION OF WORK ...............................................................................................................................45 A. WARRANTY AND GUARANTEE .....................................................................45 B. INSPECTION OF WORK .....................................................................................46 C. CORRECTION OF DEFECTIVE WORK ............................................................48 D. ACCEPTANCE AND CORRECTION OF DEFECTIVE WORK BY THE COUNTY ..................................................................................50 E. RIGHTS UPON INSPECTION OR CORRECTION ............................................51 F. SAMPLES AND TESTS OF MATERIALS AND WORK ..................................51 G. PROOF OF COMPLIANCE WITH CONTRACT PROVISIONS ........................................................................................................52 H. ACCEPTANCE .....................................................................................................52 SECTION 1.10 CONTRACTOR'S ORGANIZATION AND EQUIPMENT ....................................................................................................................53 A. CONTRACTOR'S LEGAL ADDRESS ................................................................53 B. CONTRACTOR'S OFFICE AT THE SITE ..........................................................53 C. CONTRACTOR'S SUPERINTENDENTS OR FOREPERSONS ....................................................................................................53 D. PROFICIENCY IN ENGLISH ..............................................................................54 Design-Build Design-Build Contract XXXXXX Page iii E. CONTRACTOR'S AND SUBCONTRACTORS’ EMPLOYEES ........................................................................................................54 F. CONTRACTOR TO SUPPLY SUFFICIENT WORKERS AND MATERIALS ...............................................................................................54 G. CONTRACTOR TO LIST TRADES WORKING

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    111 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us