I-35 from Grand Avenue Parkway to SH 45 North CONSTRUCTION INFORMATION

I-35 from Grand Avenue Parkway to SH 45 North CONSTRUCTION INFORMATION

I-35 from Grand Avenue Parkway to SH 45 North CONSTRUCTION INFORMATION Project Overview The I-35 from Grand Avenue Parkway to SH 45 North project addresses safety and mobility in Travis County by reconfiguring the northbound entrance and exit ramps. Lack of mobility on I-35 threatens the economic livelihood of Texas. With more than 177,000 vehicles traveling on this segment of I-35 each day, this project will improve mobility, safety and connectivity for all modes of transportation along I-35. Work includes reversing ramps along northbound I-35 between Grand Avenue Parkway and SH 45 North, constructing an extended entrance/exit lane on the northbound I-35 mainlanes under SH 45 North and along the frontage road, installing high-mast lighting and improvements at Picadilly Drive and the I-35 frontage road. Construction Phases Work on this improvement project will take place in three phases: • Phase I work includes setting up the work zone and beginning drainage work on the northbound I-35 frontage road. • Phase II work includes constructing the new northbound I-35 entrance and exit ramps and closing the existing ramps, constructing frontage road improvements and installing high- mast lighting. • Phase III work includes widening the intersection at Picadilly Drive, and final paving and striping. Details The construction cost for the 2-mile project is $8.2 million. Construction is funded by Capital Area Metropolitan Planning Organization (CAMPO) and TxDOT. Construction start is August 2020 and is expected to be complete in mid-2021, weather permitting. The contractor is Jordan Foster Construction. Contact Information For additional project information, please contact: For media inquiries, please contact: Scott Serafin, P.M.P. Diann Hodges Project Manager TxDOT Southwest Communications Director TxDOT North Austin Area Office TxDOT Austin District (512) 997-2226 (512) 832-7027 [email protected] [email protected] For additional information visit: www.My35Construction.org Updated: July 2020 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us