SECTION I: INVITATION FOR TENDERS THE UNITED REPUBLIC OF TANZANIA PRESIDENT’S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT P.O. Box 717 MUSOMA TANZANIA RURAL AND URBAN ROADS AGENCY (TARURA) Invitation for Tenders Date: 11/07/2019 1. This Invitation for Tenders follows the General Procurement Notice for these Projects, which appeared in PPRA Journal on 11th June 2019. 2. The Government of Tanzania through TANZANIA RURAL AND URBAN ROADS AGENCY (TARURA) has set aside funds for the operation of Maintenance Works during the financial year 2019/2020. It is intended that part of the proceeds of the fund will be used to cover eligible payment under the contract for the Periodic, Routine and Recurrent, Spot Improvement, Rehabilitation and Bridge/Culvert Construction Works. 3. The REGIONAL COORDINATOR TARURA – MARA on behalf of the Chief Executive of TARURA now invites sealed tenders from eligible and qualified National Contractors. Tendering is open to all Civil Works Contractors registered with Contractors Registration Board (CRB) in the indicated classes shown in the table below for each tender : TENDER ELIGIBLE NUMBER TENDER NAME MAJOR QUANTITIES CONTRAC TORS 1.BUNDA DISTRICT COUNCIL -Light reshaping - 24,360m - Heavy reshaping-5,200m -Gravelling - 878m3 RM of Busambara -Mugara (10.0 -Open drains excavation – km), Bulamba - Mwiluluma 10km, SI 14,210m Works of Busambara -Mugara (3.0 -Stone masonry - 192.42m3 AE/092/2019/20 Class VI km), Bulamba - Mwiluluma (5.2km ) -Loose stone pitching- 20/MAR/W/01 and above and Culverts Construction along 98.9m3 Busambara -Mugara (5Nos) and -Concrete in drainage - Bulamba - Mwiluluma (6Nos) structures - 205.19m3 -Reinforcements-7,238Kg -Road reserve marker posts-36 No. RM(18.0Km) of Bukama - Mugeta, -Light reshaping -26,620m Nyangere - Chamtigiti (7.81km), SI of -Heavy reshaping – 3000m AE/092/2019/20 Class VI Bukama - Mugeta (2.0km), Nyangere -Gravelling-1249.1m3 20/MAR/W/02 and above - Chamtigiti (1.0km),and Culvert -Open drains excavation - Construction along Bukama - Mugeta 17,120m (6Nos) and Nyangere - Chamtigiti -Stone masonry-147.05m3 (3Nos) -Loose stone pitching-60m3 -Concrete in drainage structures - 165.09m3 -Reinforcement – 5605Kg - Gabions – 48m3 2.BUNDA TOWN COUNCIL -Light grading -13.34Km RM, SI,PM WORKS AND -Heavy grading – 12.78Km INSTALLATION OF 8 CULVERTS -Concrete pipe culvert WORKS,ALONG Bunda - Nyasana - (900mm)-56m AE/092/2019/20 Class VI Kabasa (8.14km), Guta - Nyabehu -Gravelling -9,597m3 20/MAR/W/04 and above (6.91km),Kisangwa Chuoni FDC -Desilting of open drains- (3.6Km 3.6Km) and Sazira - 10,743m Manyamanyama (7.47km) -Road reserve marker posts- 14No CONSTRUCTION OF STORM WATER DRAINAGE WORKS, (1.92 -Loose stone pitching- km) Mwanza road - Rubana Sec 1,920m2 AE/092/2019/20 (0.96km), SDA Church Mjini- Posta Class VII -Concrete grade 15-96m3 20/MAR/W/05 road (0.26km) ,Gurinja road - Posta and above -Stone masonry -940m3 road (0.48Km), Mama Manyala road - Boma road (0.12Km) and Mayaya road -Girrate (0.1Km) RM, SI , PM WORKS (22.4km) Anglican road - NMB road (0.42Km),Wasira- CCM Bunda (0.49Km), Chiringe S/M - Mzunguko - AIC Chiringe(1.3 km), Lusekelo - Mzunguko - Ukerewe road (0.38km), Mzuma road - Mwanza road (0.58km), Goem -EAGT Chiringe(0.30km), Msabaha - Mashauri (0.54km), Majengo S/M - Mlebele (0.24km) , Maralint - Kabalimu road (0.34km),Musoma -Light grading - 3.90Km AE/092/2019/20 road - Elphace (0.48km),Mlimani - Class VI -Heavy grading – 4.49 Km 20/MAR/W/06 Olympus junction (1.7km), Mayugu and above -Gravelling – 2,647m3 junction - Nyasebwa (0.55km), Stop - Junction TTC (0.36km), Stop- Junction Phelician(0.5km), TTC Junction- Berria (0.5km), TTC Junction-Nyamjinja(0.49km), Wasira - CCM Bunda(0.52km), Soko Kabalimu -Majengo S/M(0.32km), Maralint road-Mlimani(1.25km), Mhando - Abasi (1.53km) , Junction Malugu road - Mkonyongi(0.3km), Kagunda - Nyamongo(0.25km), PAG Chiringe-Manase (1.25km), Nyagiro - Musyoka (0.35km),AIC Manyamanyama road -Musoma road (0.85km),Junction Mugayangobo- Mama Gati(0.54km), Mugayangobo Junction- Werema(0.3km), Shukrani- CCM Bunda Stoo(0.19km),Rugira- Nashoni (0.32Km,Balili Godown- Mzuma (0.69km),Mwanza road - Chacha Maheke (0.57km), Police - Nyamakokoto((0.31km),Uhuru lodge- CCM Nyamakokoto(0.27km),CPM - Musoma road(0.58km),Ukerewe road -Nyasana road (1.81km), Village- High tension(0.27km), and Maleka- Posta road (0.53Km) 3.BUTIAMA DISTRICT COUNCIL - Heavy grading - 23.8km - Open drains excavations - RM (19.99Km), SI (5Km), PM 5,148.8m (1.0Km) and Culvert Construction - Loose stone pitching - AE/092/2019/20 (3Nos) along Masurura - 24m3 Class VII 20/MAR/W/09 Ryamisanga - Kyasuke, Nyabange -Concrete in drainage and above Cente -Manyara - Nyarukoru and works – 22.5m3 Bugunga - Buruma - Kiabakari Roads - Stone Masonry- 36m3 - Reinforcement – 1,230kg - Gravelling – 1,228.5m3 -Heavy grading - 19.0km - Open drains excavations -8473m -Gravelling - 3403m3 -Rocks excavation/Blasting RM (10Km), SI (7.5Km), PM (4.0Km) - 287m3 and Culvert Construction (3Nos) -Road reserve marker AE/092/2019/20 along Butiama -Kibubwa - Bukabwa, posts - 12Nos Class VII 20/MAR/W/10 Isaba Kibubwa - Masurura and -Loose stone pitching – and above Butiama - Rwamkoma - Biatika 24m3 Roads - Concrete in drainage structures – 22.5m3 - Stone masonry – 36m3 - Reinforcements – 1,230kg - Rock excavation – 287m3 -Heavy grading - 25.5km RM (13Km), SI (8.0Km), PM (5.Km) - Open drains excavations and Culvert Construction (3Nos) -13,896.5m AE/092/2019/20 along Kongoto - Baranga - -Gravelling - 4441.5m3 Class VII 20/MAR/W/11 Sirorisimba,Kiagata - Kihonda -Rocks excavation/Blasting and above Matongo and Kamugendi Kizaru - 40m3 Kinyariri Roads -Road reserve marker posts - 24Nos -Loose stone pitching – 27m3 - Concrete in drainage structures – 24.5m3 - Stone masonry – 37m3 - Reinforcements – 1,280kg 4.MUSOMA DISTRICT COUNCIL -Heavy grading - 14.2km -Heavy reshaping - 5000m - Open drains excavations – 6575.98m -Gravelling - 2991m3 RM (11.0km), SI(6.0km), PM(3.0km) -Rocks excavation/Blasting and culverts construction (4.0 Nos) - 5m3 AE/092/2019/20 along Saragana - Nyambono - -Road reserve marker 20/MAR/W/13 Chumwi, Kaburabura - Masinono - posts - 12Nos Class VII Bugwema, Masinono - Kinyang'erere - Concrete in drainage and above and Muhoji - Saragana Roads structures - 25.74m3 -Stone masonry - 30.36m3 -Loose stone pitching – 28.28m3 -Reinforcement - 1247.18kg -Heavy grading - 27.1km -Heavy reshaping - 5000m -Open drains excavations – 7876.71m RM (15.10km), SI(12.0km), -Gravelling - 5956m3 PM(5.0km) and culverts construction -Rocks excavation/Blasting (6.0 Nos) along Nyakatende - - 15m3 AE/092/2019/20 Kamguruki - Kigera, Mmahare - Etaro -Road reserve marker Class VI 20/MAR/W/14 - Nyasaungu, Mkirira - Nyegina - posts - 38Nos and above Esira, Etaro - Nyegina, Nyaminya - - Concrete in drainage Kataryo - Kiawazaru and Mugango - structures - 38.66m3 Bwai - Kwikuba Roads -Stone masonry - 45.54m3 -Reinforcement - 1870.77kg -Loose stone pitching – 42.42m3 5.MUSOMA MUNICIPAL COUNCIL SI along Paroma Road, Rwamlimi -Heavy Reshaping -8,200m Songambele 2, Mutex-buhare 1, -Rock Excavations - 96m3 Pambazuko-Majengo;Periodic -Gravelling – 3,478.43m3 Maintainance Bweri SDA-Amani, -Grouted stone pitching – AE/092/2019/20 Class VI Majengo Rwamlimi, Rwamlimi 2,585.44m2 20/MAR/W/17 and above Mshikamano, Drain Construction and -Stone masonry – Culvert Construction along Majengo- 946.77m3 Rwamlimi, Rwamlimi - Mshikamano, -Reinforcement – 4,320kg Machinjioni-Rwamlimi, Mutex buhare- -Loose stone pitching – Rwamlimi. 250m3 -Concrete in drainage structures - 51.99m3 -Heavy grading 2.7Km -Gravelling - 1747m3 -Grouted stone pitching – RM along Nyasho P/S, SI along 360m2 Nyakato Msikitini-Tanesco 1, -Stone masonry – Nyakato Msikitini Tanesco 2, Nyakato 229.33m3 AE/092/2019/20 Makaburini, Open University Rd, -Reinforcement – Class VII 20/MAR/W/18 Construction of drains and Culverts 4,932.1kg and above along Anarlando, Mayamba Road -Loose stone pitching – and Construction of 1 Bridge Nyasho 87.2m3 P/S. -Concrete in drainage structures - 35.4m3 -Road reserve marker posts - 10Nos SI along Bonde la baraka ( Mtani), Kwangwa SDA - Mutex road, -Heavy Reshaping -9010m Periodic Maintenance along Mara Sec -Rock Excavations - 204m3 - Kurumuli RD, Mujora Mjarifu RD -Gravelling - 5758m3 AE/092/2019- and Kwangwa SDA RD 3, -Box Culverts - 3Nos VI and 2020/MAR/W/ Construction of drains and Culverts -Drain Construction - 800m above 19 along Mara sec- Kurumuli RD, Mujora - Mjarifu, Kwangwa RD, Construction of Bridge - Bethsaida RD and Construction of 2 2Nos Bridges Along Bonde la Baraka RD & Kwangwa SDA RD 3. -Patch works - 980m2 - Cement stabilization- 98m3 - Road Marking – 500m RM ( Patching paved roads) along - Re-sealing works- Kusaga rd, Uhuru rd, Sokoni rd, 1960m2 Iringo rd, Mwigobero rd & Boma road, -Heavy Reshaping – PM along Nyamatare Msikitini and 2,000m AE/092/2019/20 Class VI Old JW Quarters, Construction of -Gravelling – 3,238m3 20/MAR/W/20 and above drains and Culverts along Otieno RD, - Heavy grading- 1.1Km Peace Palace RD, Nyamatare -Grouted stone pitching – Msikitini RD and Old JW Quarters 2,400m2 RD. -Stone masonry – 782m3 -Loose stone pitching – 34m3 -Concrete in drainage structures - 11.0m3 Construction of drains and Culverts -Gravelling – 814m3 AE/092/2019/20 along Buhare - Mwisenge - Makoko -Grouted stone pitching – Class VI 20/MAR/W/21 RD, Buhare Ofisi ya Kata RD, 2,100m2 and above Makoko- Nyamiongo RD, Mtakuja - -Stone masonry – 836m3 Zanzibar and Prime Catch RD. -Loose stone pitching – 216m3 -Concrete in drainage
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages12 Page
-
File Size-