
Surat Municipal Corporation 1 Category of Initiative : “Technical Innovation” Title of the Initiative : “Leakage Mapping and its’ Positive Impact” Presentation by : Jatin Shah, City Engineer, SMC Location: Surat City TO KATHOR Surat City Variav TO AHMEDABAD Kosad TO OLPAD Mota TO KATHOR G.H.B 3 Varachha Kosad E G.H.B V I G.H.B R Jahangirpura I Chhapra P Bhatha TO HAZIRA 28 A T TO KAMREJ Ved TO DANDI Pisad Amroli Sarthana GAMTAL G.E.B. Power House GAMTAL Utran E 53 V Utran 69 I Dabholi Katargam R I Nanavarachha G.I.D.C. P 76 K a t a r g a m A Jahangirabad T 30 51 NORTH ZONE31 29 Rander Singanpor 129 71 70 D.T.P.S. NO - 20 D.T.P.S. NO - 20 (Nana V arach ha-Kapadra) 50 WEIR CUM CAUSE WAY T.P.S.NO.18 (Katargam) T.P.S.-15 Simada TO BHESAN (Fulpada) T.P.S.NO.1 4 T.P.S.NO.3 (Rander Adajan) (Katargam) Fulpada T.P.S. NO 16 59 T.P.S.NO.4 D.T.P.S.NO.17 (Kapa dra ) Ashwanikumar Navagam (Fulpada) Palanpor Tunki D.T .P.S. NO.24 19 D.T.P.S. NO.23 T.P.S.NO.13 45 (Rander) (Adajan) T.P.S.NO .1 (Lal Darwa ja)) 172 T.P.S.NO.11 7 72 (Adajan) EAST ZONE 33 T.P.S.NO.3 1 (Karanj) WEST ZONE 12 62 Puna 14 35 18 57 EXIST.NEHRU BRIDGE T.P.S.NO.12 13 (Adajan) 41 40 SWAMI VIVEKANAND BRIDGE 61 37 60 T.P.S.NO.8 10 (Umarwada ) Magob LOW LEVEL BRIDGE 15 11 TO HAZIRA 77 Adajan 75 21 43 34 17 T.P.S. NO.10 64 CENTRAL4 Pal ( Adajan) EXTST.SARDAR BRIDGE 23 32 3 TO KADODRA 73 65 INDIA 26ZONE25 DUMBHAL Parvat 36 46 54 24 TO HAZIRA 16 55 20 T .P.S.NO. 5 6 Ath42wa Umra 52 SOUTHT.P.S. NO.7 EAST 22 ( Anjana) T.P.S.N47O. 6 5 39 (Majura khatodra) 74 66 Limbayat E 49 58 T.P.S. NO.9 ( Majura) V T.P.S.NO. 5 Umra North I R 67 ZONEA Godadra 68 I R L W GUJARAT AGRICULTU RE A UNIVERCITY (PANAS FA RM ) Y I L A N P D A UMRA T.P.S. NO.4 UDHNA SAHKARI Umr a Sou th SAN GH LIMITED T S.W.P. CAMPUS RE CREATION POND T.P.S.NO. 6 AND GARDE N PIPLOD 38 76 TO BHUSAVAL S.V.P. ENGG. COLLEGE 2 63PIPLOD Udhana Gujarat 79 Althan Bhatar SE WA GE DISPOSAL 8 78 VESU PLANT BHART HANA Dindoli VESU Y 80 L R D.T .P.S. NO-3 27 . SO UTH GUJARAT UNIVERCI TY P (Run dh) O R D.T .P.S. NO.-1 56 P (Vesu) Bharthana Rundh Vesu Vesu 9 Pandesara D.T.P.S1. 7N2O-2 Bhedvad Vesu-Bha rthana-Ve su Bamroli Magdalla 48 TO PALSANA G.I.D.C 44 Pandesara D.T .P.S. NO-7 D.T.P.S. NO.21 (Vesu-Magdalla) (Bhestan) S D.T.P.S. NO-6 Gaviar (Ve su) Bhimrad 81 Vanta D.T.P.S.NO.22 (Bhestan) Bhestan Vadod P- 94 W.D.C. (SUDA) Vanta Sarsana I 1006 Dumas R SOUTH ZONE I Dumas T-28 P-90 AerodromeComplex Water Distri. P Centre (Civil Aviation Dept.) (SUDA) O-59 Garden (SUDA) A Sonari T SOUTH WEST Jiav Un 67 Abhava G..I. DC ESTATE G.I.D.C O-58 ZONE ESTATE Khajod TO NAVSARI Budiya TO MUMBAI Gabheni G.I.D.C ESTATE R E Bhimpore V I R H-21 Dumas I P TOWNSHIP A (SUDA) Sult anaba9d0 T 82 O-63 Recreation 31 (S4.U7.D.A) Gabheni Surat City • 2nd largest city in Gujarat • 42 % of the world’s total rough diamond cutting and polishing, • 9th largest in India • 70 % of the nation’s total rough diamond • Among the fastest growing cities in India. cutting and polishing, • 40 % of the nation’s total diamond exports, • 40 % of the nation’s total man made fabric production, • 28 % of the nation’s total man made fibre production • 18 % of the nation’s total man made fibre export, and • 12 % of the nation’s total fabric production. • Large number of textile process houses. NAVSARI • Over 550 units granted Consent GREATER SURAT IN REGIONAL CONTEXT Growth of City Year Area in Population • Historical Development Of Surat Sq. Km (in Million) Dates Back To 300 BC. 1951 8.18 0.223 • Municipality Established In 1852 1961 8.18 0.288 AD. 1971 33.85 0.472 • Municipal Corporation Formed In 1981 55.56 0.776 1966. 1991 111.16 1.499 2001 112.27 2.434 2001* 326.51 2.877 2010 326.51 ~ 4.400 Surat: Infrastructure Overview Service Present Status Water treatment capacity 1178 MLD Water storage capacity 638 Million Liters T&D network 2750 km STP capacity 708.5 MLD Collection network 1300.0 km Storm drainage 577 km Solid waste Collection 1150 MT/day Water Supply System of Surat City – Present Status At a Glance 6 Population covered under piped network:- 86 % of projected pop. 44 Lacs Area covered under piped network:- (Area of city increased in year 2006 from 112.28 Sq.Km. to 326.51 Sq.km) For area of city before extension : 98 % For area of city after extension: 57 % Source of Water: River Tapi Total numbers of Water Works:- 4 Total numbers of Water Distribution Stations: 17 Total Installed capacity of all WTP:- 1178 MLD Present gross daily average water supply: 780 MLD Frequency of water supply: Average 3 hours daily Total Storage capacity of all UGSR & ESR:- 638 ML Total Approx. length of all water supply pipelines:- 2750 Km. Leakage through pipelines – Reasons 7 Leakages may occur in water supply pipelines due to various reasons as shown in the diagram below. Leakage through pipelines – A Nuisance 8 A small leak in the middle of a road can cause tremendous trouble to the citizens. It disrupts traffic on roads. Less quantity of water to consumers than planned. Loss of treated water amounts to a considerable financial loss and therefore affecting sustainability of the system. A leak of only one litre per minute corresponds to 525,600 litres per year. Leaks increase operating costs A potential source for contamination of treated safe water Leakage Mapping – Objectives 9 Leakage mapping is necessary because normally; leakages repaired on a piece-meal basis. leakage repaired without attention to the root cause of the problem. Frequent leakages in a particular portion of pipeline requires special attention and suitable action to solve it in a sustainable manner. Preparing a map showing frequent leakage prone locations. Addressing the problem in scientific approach; gives sustainable results reduces complaints of leakage & contamination of water. Leakage Mapping – Need of the hour 10 The Ministry of Urban Development, Government of India has chosen the city of Surat among pilot cities for implementing Service Level Benchmarking for four urban basic services and it includes “Drinking water Supply”. To achieve NRW within 20% standard limit is an important parameter of Service Level Benchmarking (SLB), as suggested by MoUD and adopted by SMC. As a constant endeavour to achieve the targeted SLB, Non- Revenue Water (NRW) cell of Surat Municipal Corporation has started functioning. Leakage Mapping is an important activity of NRW cell, Leakage Mapping is a “No cost, Low Cost initiative” to bring down NRW. Leakage Mapping – Mechanism Flow-chart After Discussion with Frequent Leakage Fault Finding & Solution Leakage team/ Fitter Remedial Measures Implementation Frequent Leakage Mapping HQ-AutoCad – Monthly Review By Zones By Head Quarter By outsourcing (AMC) Pipe 550 -750 mm dia. Pipe < 550 mm dia. Pipe > 750 mm dia. Leakage Repairs Leakage Reporting: Leakage Complaint: •All Zones Report to HQ daily •Customer Complaint- Web/Helpline •HE reports to Comm. weekly •Departmental / Zonal leak detection team Water Pipeline Customer Complaints - Leakage & Contamination 12 Customers’ leakage complaints are generally related to ferrule level water connection. Customer can make a complaint by; Internet on SMC’s website www.suratminicipal.gov.in helpline phone numbers visiting nearest City Civic Center / ward office / zone office. Customer complaints regarding leakage/contamination of tap water attended within 24 hours. Customers are informed by email/phone when their complaints are resolved. Customer’s feedback is also taken to know their level of satisfaction Complaint Management System (web) Leakage Mapping – Methodology 14 Major leaks on roads are reported by; HQ NRW team /zonal teams of beldars from 7 different zones. officers, engineers on field visit, health workers working in the field All leakages are repaired promptly by; Fitter team of zones for water supply pipelines up to 550 mm dia. Fitter team of Hydraulic Department (HQ) for water supply pipelines from 600 to 750 mm size Outsourcing the job to private agencies on Annual maintenance contract for leakage repairs on all major water supply trunk mains/ transmission pipelines of dia. greater than 750mm. All 7 zones and Hydraulic Department (HQ) has; a dedicated team of beldars headed by a fitter (known as fitter team) a separate JCB machine & dewatering pumps for this job. Leakage Mapping – Methodology 15 All leakage complaints are registered by every zone in a separate register. All zones prepare a summarized statement of all leakages including; New leakages found, Leakages repaired on the previous day leakages under repairs All zones report daily in a standard format to Hydraulic Department at Head Quarter. Hydraulic Engineer prepares a summarized daily report of leakages for all zones.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages33 Page
-
File Size-