Twelve Quays – Two Levels Project

Twelve Quays – Two Levels Project

Presenting PIANC The World Association for Waterborne Transport Infrastructure Presentation by James Andrew Smith BSc(Hons) MSc CEng CMarEng MICE MIMarEST Principal Engineer/ Head of Bristol Office Beckett Rankine at the occasion of AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project • Twelve Quays Terminal – Birkenhead • Western Bank of the River Mersey • North West England Owned by: Credit: Google Earth Operated by: AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project History • Land part of interconnected docklands • Alfred Basin • Great Float Rankine • Designed by Transmarine Beckett : • Terminal first opened in 2002 Credit Arrangement • Pontoon Ro-Ro Berth • Two berths (North & South) • Monopile Dolphins • Fixed Bridge & Bankseat • 4 Point Torsionally Flexible Linkspan • Three lane HA/HRo AGA 2021 / 26 & 27 May 2021 Credit: David Byrne Twelve Quays – Two Levels Project Credit: Stena Line Stena E-Flexer Class • Longer and heavier than RoPax • Double Deck: • Faster loading & Greater capacity • Slower sailing = lower emissions • Same Schedule • Ships design/construction run in Credit: Farrans parallel with berth upgrade Main Modifications Required • Upper level loading ramp • Berth Interface • Stern ramp wider and higher • Berthing and mooring modifications • Berth to remain operational! AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Concept & Feasibility Design & Build Contract AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Surveys and Studies • Topographic & Bathymetric • Utilities & Services • Historical Boreholes • Desktop UXO (Basic and Advanced) • Laser Scanning • Photographic Surveys • Internal and External UT surveys AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Pontoon Internal Surveys • Peel Ports commissioned survey in 2016 • All compartments opened but berth remained operational • Ballast tanks kept full limiting inspection • Dry tanks fully inspected • General conclusions: • Ballasted Tanks: “…good condition and all coatings are showing no signs of significant deterioration.”. • Dry Tanks: “…suffering from breakdown of coating...”. AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Weld and Joint Inspections • Visual and MPI inspection of all welded joints on Linkspan • Torsionally Flexible 4No. Point Support Linkspan • All welds/joints were free of cracks – remarkable achievement • Linkspan only required preparation and painting AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Constructability/Installation Assessments • One berth to remain operational • Upper Ramp required full possession • Phase plans developed for each structure • Lift plans assumed Lara 1 (Mersey Mammoth) Credit: Jörn Prestien AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Credit: Farrans AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project AGA 2021 / 26 & 27 May 2021 Credit: Farrans Twelve Quays – Two Levels Project Run-off – Single Level vs Double Level • Single tier linkspans water runs to Bankseat or drainage points • Runoff typically collected by interceptor or returns to River or Sea • Two-tier linkspan water runs to seaward bearings - cascading onto lower deck • Minor issue to drivers – Big issue to Operators! • Issue simply resolved with collection trough and down pipe Credit: Farrans AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Queensway Tunnel Interface • Ø14m by 3.24km long tunnel – 4No. Lanes • ~50m from new piles to tunnel • Existing pile already closer to tunnel • Plans shared with Mersey Travel (Operator) • Bored socket piles suit geology and favourable vibration compared to Driving AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Ships Stern Ramp Modifications • Revised Dwg’s issued during fabrication • Ships ramp modifications: • Length – Reduced from 2445mm to 2315mm • Profile – From flat to new knuckles added • Hinge – Relocated from top to bottom • Width – Overall width increased Implications • Stop Fender – Already being relocated • Existing Ramp – No longer compliant BS6349–8 AGA 2021 / 26 & 27 May 2021 Credit: Stena Line Twelve Quays – Two Levels Project Ships Stern Ramp Modifications • Options: • New pontoon ramp – High Cost / Delays • Alter ships ramp – High Cost / Programme Delays • Bespoke filler piece • Conforms with BS 6349–8 • Relatively Low Cost • Retro-fitted AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Upper Linkspan Tolerance and Point Loads • Large point loads generated by new upper ramp columns • Internal Stiffeners sufficient but tolerances required • Ravestein opt for new over-sized 50mm landing plates • Greater Tolerance • Reduced confined space works AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project AGA 2021 / 26 & 27 May 2021 Credit: Farrans Twelve Quays – Two Levels Project AGA 2021 / 26 & 27 May 2021 Credit: Farrans Twelve Quays – Two Levels Project Pontoon Internal Painting and Fatigue Cracking • Ballast Tanks drained to enable blasting and painting • Discovery of large fatigue cracks – Flange and Webs • Repairs carried out previously but unrecorded history • Ongoing study to assess the root cause – Fatigue Modelling • Temp repair using ‘Vee-and-Weld’ method. Credit: Farrans AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Ramp Modification and Cracking • Ramp removed for painting and modification • Cracks to 4No. ‘Sniped’ stiffeners • Ongoing study to assess the root cause • Temp repair using ‘Vee-and-Weld’ method Credit: Farrans AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project Credit: Farrans AGA 2021 / 26 & 27 May 2021 Twelve Quays – Two Levels Project AGA 2021 / 26 & 27 May 2021 Credit: Farrans THANK YOU AGA 2021 / 26 & 27 May 2021 Q&A AGA 2021 / 26 & 27 May 2021.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us