Cljh28317.Pdf

Cljh28317.Pdf

Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter - District Wise Abstract State : Jharkhand Sanction Year : 2016-2017 Batch : 4 Collaboration : Regular PMGSY Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9 Road Proposals 1 Bokaro 10 21.240 472.85 315.25 788.10 84.74 (0 , 2 , 5 , 18 , 25) 2 Chatra 2 6.005 167.23 111.50 278.73 32.71 (0 , 1 , 0 , 2 , 3) 3 Deoghar 6 14.800 430.41 286.93 717.34 63.98 (1 , 5 , 1 , 0 , 7) 4 Dumka 3 7.880 247.35 164.91 412.26 33.38 (0 , 1 , 3 , 0 , 4) 5 East Singhbhum 13 31.280 863.24 575.47 1,438.71 132.96 (0 , 5 , 8 , 8 , 21) 6 Garhwa 10 33.546 1,012.57 675.04 1,687.61 337.58 (1 , 6 , 3 , 2 , 12) 7 Giridih 1 2.100 54.24 36.16 90.40 9.39 (0 , 0 , 1 , 1 , 2) 8 Godda 11 23.680 568.41 378.93 947.34 98.80 (1 , 11 , 4 , 4 , 20) 9 Gumla 7 17.380 450.13 300.09 750.22 124.21 (1 , 1 , 3 , 14 , 19) 10 Hazaribagh 31 87.396 2,092.60 1,395.08 3,487.68 367.49 (1 , 3 , 19 , 11 , 34) 11 Jamtara 8 15.270 436.17 290.77 726.94 72.40 (0 , 5 , 3 , 0 , 8) 12 Khunti 6 13.496 351.68 234.47 586.15 63.97 (1 , 2 , 3 , 3 , 9) 13 Koderma 2 9.451 239.62 159.75 399.37 39.50 (0 , 1 , 2 , 4 , 7) 14 Latehar 7 57.400 1,422.48 948.32 2,370.80 234.90 (0 , 6 , 1 , 2 , 9) 15 Pakur 3 6.920 201.23 134.17 335.40 35.91 (0 , 0 , 3 , 0 , 3) 16 Palamau 8 17.050 413.69 275.80 689.49 77.44 (0 , 2 , 4 , 5 , 11) 17 Ramgarh 2 2.896 84.45 56.30 140.75 11.25 (1 , 1 , 0 , 0 , 2) 18 Ranchi 4 7.955 210.58 140.40 350.98 34.18 (1 , 2 , 2 , 1 , 6) 19 Sahebganj 5 12.720 350.92 233.95 584.87 44.20 (1 , 1 , 5 , 0 , 7) 20 Saraikela Kharsawan 3 6.787 149.28 99.52 248.80 23.43 (0 , 2 , 7 , 2 , 11) 21 Simdega 1 2.700 77.44 51.63 129.07 13.30 (0 , 0 , 1 , 1 , 2) 22 West Singhbhum 7 23.645 606.85 404.58 1,011.43 103.37 (0 , 1 , 10 , 4 , 15) Roads Total 150 421.597 10,903.42 7,269.02 18,172.44 2,039.10 (9 , 58 , 88 , 82 , 237) Long Span Bridge Proposals 1 Palamau 1 43.800 86.32 57.54 143.86 1.97 - Bridges Total 1 43.800 86.32 57.54 143.86 1.97 - Grand Total 151 Total Road 10,989.74 7,326.56 18,316.30 2,041.07 (9 , 58 , 88 , 82 , 237) Length:421.597 Kms Total LSB Length:43.800 Mtrs Page 1 of 1 Generated On : 28/03/2017 11:58 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter State : Jharkhand Sanction Year : 2016-2017 Batch : 4 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms. Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Road Proposals District- Bokaro Block- Bermo 1 L074 L074-PWD Road to Manjhi New Zycosoil 1.160 3.750 Complete 2 28.41 18.94 47.35 4.45 (0 , 0 , 0 , 2 , 2) Tola Rajabera (VR74) Nanotechnolog y 2 L071 L071-Ganju Basti to New -- 1.698 3.750 Complete 4 38.90 25.94 64.84 6.93 (0 , 0 , 1 , 0 , 1) Nawatand (VR71) Block Bermo Total 2.858 6 67.31 44.88 112.19 11.38 (0 , 0 , 1 , 2 , 3) Block- Chandankiyari 3 T09 T09-Mahal to Silphor Road Upgarde Roller 2.702 3.750 Complete 8 66.68 44.45 111.13 10.09 (0 , 1 , 3 , 2 , 6) Compacted Concrete Pavement Block Chandankiyari Total 2.702 8 66.68 44.45 111.13 10.09 (0 , 1 , 3 , 2 , 6) Block- Gomia 4 L061 L061-Keri to Matakamtoli New Zycosoil 1.900 3.750 Complete 5 35.77 23.85 59.62 8.66 (0 , 0 , 0 , 6 , 6) (VR61) Nanotechnolog y Block Gomia Total 1.900 5 35.77 23.85 59.62 8.66 (0 , 0 , 0 , 6 , 6) Block- Jaridhi 5 L050 L050-Dondra road Lipu more New Roller 1.500 3.750 Complete 4 36.84 24.56 61.40 7.44 (0 , 1 , 0 , 0 , 1) to Lipu gram (VR50) Compacted Concrete Pavement Page 1 of 22 Generated On : 28/03/2017 12:00 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 6 L051 L051-Banchas REO road to New Roller 2.700 3.750 Complete 6 49.32 32.88 82.20 8.85 (0 , 0 , 1 , 0 , 1) Pokharghati Simaldih (VR51) Compacted Concrete Pavement Block Jaridhi Total 4.200 10 86.16 57.44 143.60 16.29 (0 , 1 , 1 , 0 , 2) Block- Kasmar 7 L042 L042-Bemrotanr REO road to New -- 1.500 3.750 Complete 2 24.53 16.35 40.88 5.71 (0 , 0 , 0 , 2 , 2) Ghirgarwa (VR42) 8 L040 L040-Dhadhakiya REO road New Roller 3.230 3.750 Complete 3 90.43 60.29 150.72 12.41 (0 , 0 , 0 , 2 , 2) to Kochagora (VR40) Compacted Concrete Pavement Block Kasmar Total 4.730 5 114.96 76.64 191.60 18.11 (0 , 0 , 0 , 4 , 4) Block- Nawadih 9 L067 L067-Pilpilo Road to Khardin New -- 2.200 3.750 Complete 3 40.81 27.21 68.02 9.01 (0 , 0 , 0 , 2 , 2) Kathaldih (VR67) Block Nawadih Total 2.200 3 40.81 27.21 68.02 9.01 (0 , 0 , 0 , 2 , 2) Block- Petarwar 10 L051 L051-Mayapur REO road New -- 2.650 3.750 Complete 2 61.16 40.78 101.94 11.20 (0 , 0 , 0 , 2 , 2) Sagarulta to Jillingtand (VR51) Block Petarwar Total 2.650 2 61.16 40.78 101.94 11.20 (0 , 0 , 0 , 2 , 2) District Bokaro Total 21.240 39 472.85 315.25 788.10 84.74 (0 , 2 , 5 , 18 , 25) District- Chatra Page 2 of 22 Generated On : 28/03/2017 12:00 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Block- Pathal Gadda 11 L025 L025-PATHALGADDA TO New -- 2.000 3.750 Complete 6 52.88 35.26 88.14 17.24 (0 , 0 , 0 , 2 , 2) SHEETALPUR (VR25) Block Pathal Gadda Total 2.000 6 52.88 35.26 88.14 17.24 (0 , 0 , 0 , 2 , 2) Block- Pratappur 12 L026 L026-KODWARIA TO Upgarde -- 4.005 3.750 Complete 13 114.35 76.24 190.59 15.47 (0 , 1 , 0 , 0 , 1) ASHKUL Block Pratappur Total 4.005 13 114.35 76.24 190.59 15.47 (0 , 1 , 0 , 0 , 1) District Chatra Total 6.005 19 167.23 111.50 278.73 32.71 (0 , 1 , 0 , 2 , 3) District- Deoghar Block- Karon 13 L035 L035-Madankatta to New Roller 3.500 3.750 Complete 7 92.55 61.70 154.25 13.75 (1 , 0 , 0 , 0 , 1) Birangariya Road Compacted Concrete Pavement Block Karon Total 3.500 7 92.55 61.70 154.25 13.75 (1 , 0 , 0 , 0 , 1) Block- Madhupur 14 L039 L039-Rajdaha to Arjunka New -- 1.700 3.750 Complete 3 54.84 36.56 91.40 7.98 (0 , 1 , 0 , 0 , 1) Block Madhupur Total 1.700 3 54.84 36.56 91.40 7.98 (0 , 1 , 0 , 0 , 1) Block- Mohanpur 15 L054 L054-Khijuriya to Dumma New -- 2.350 3.750 Complete 9 68.60 45.73 114.33 11.38 (0 , 1 , 0 , 0 , 1) Block Mohanpur Total 2.350 9 68.60 45.73 114.33 11.38 (0 , 1 , 0 , 0 , 1) Page 3 of 22 Generated On : 28/03/2017 12:00 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us