Annexure-Form

Annexure-Form

Project Name Development of Intermodal Station Project 8(a) National Highway Authority of India(NHAI) Proponent Project Address At Ajni Railway station , Nagpur Form IA APPENDIX II FORM-1 A (Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed Environmental Management Plan & Monitoring Programme). Panoramic view of Inter modal station at Nagpur 1.LAND ENVIRONMENT Attach panoramic view of the project site and the vicinity 1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. specialGiving a purposefillip to thevehicle passenger(SPV) and freight logistics of the country, the Centre has announced developing Intermodal Station (IMS) at 15 cities. IMS projects will be implemented through between Ministries of Road, Railways through NHAI and the concerned State Governments. Development of inter-modal stations will also give a boost to commercial development and economic activity in cities. Intermodal Stations are terminal infrastructure which integrate various transportation modes like rail, road, mass rapid transit system, bus rapid transit, inland waterways,Environment auto-rickshaws,Aplinka Solutions taxis and & private Technologies vehicles Pvt. etc, Ltd, so Noida that Uttarpeople Pradesh can move from one Consultant 21 Project Name Development of Intermodal Station Project 8(a) National Highway Authority of India(NHAI) Proponent Project Address At Ajni Railway station , Nagpur Form IA mode to another seamlessly, with minimum use of automobiles. In most cities today, transport hubs like bus terminals, railway stations and others are located far from each other, so inter- modal transfers create pressure on the already congested roads. By bringing the different transport modes at one point, IMS will reduce congestion on roads and also vehicular pollution," Union minister Nitin Gadkari and chief minister Devendra Fadnavis had finalized thatFor the the pilot inter project, model the station railways (IMS) stations will come at Ajni up in atNagpur Ajni. have been selected for development of IMS. Annexure-I. Minutes of meeting in this regard is Nationalattached as Highway Authority of India will fund/ develop the construction of the terminal infrastructure including railwayIndian Railwaysinfrastructure, has 440 ISBT, acres common land areasat Ajni (concourse, but IMS phase waiting-I require rooms, 5transport5 acres landretail), which parking involves and onlyother the station development facilities ofand railway railways Station will andprovide bus thestation land and for theirconstruction amenities. of the IMS. The development of IMS is designed to be well equipped with the facilities modern amenities such as regulated entry/exit, energy saving fixtures,2,22,576.75 sufficient m 2 aesthetic green cover, well planned internal roadm2 infrastructure, sewage treatment plant. The total area available for the site development is (54.99 acre). The built up area is 144,985.00 . ProjectAnnexure is going for-V the. GRIHA 4 star rating. Annexure-VI. The site layout is attached in Buffer map of the surrounding features within 500 meters of the project site is attached as Site Location: Table-1. The development of Intermodal station will be done at existing Ajni Railway Station, Nagpur. The co-ordinates of the project site is shown in Table 1: Latitude and Longitude of the Project Site S. No. Corner No Latitude Longitude 1 1 21°7'28.23"N 79°5'1.03"E 2 2 21°7'41.31"N 79°5'6.81"E 3 3 21°7'41.23"N 79°5'7.06"E 4 4 21°7'43.12"N 79°5'8.23"E 5 5 21°7'42.74"N 79°5'9.45"E 6 6 21°7'43.19"N 79°5'9.64"E 7 7 21°7'43.25"N 79°5'9.98"E 8 8 21°7'42.51"N 79°5'11.82"E 9 9 21°7'41.88"N 79°5'13.62"E 10 10 21°7'41.70"N 79°5'14.43"E 11 11 21°7'39.85"N 79°5'19.34"E 12 12 21°7'36.56"N 79°5'27.36"E 13 13 21°7'35.87"N 79°5'27.15"E 14 14 21°7'35.53"N 79°5'26.77"E 15 15 21°7'31.54"N 79°5'18.72"E 16 16 21°7'29.21"N 79°5'14.36"E 17 17 21°7'25.88"N 79°5'9.61"E Environment18 Aplinka18 Solutions & Technologies21°7'25.41"N Pvt. Ltd, Noida Uttar Pradesh79°5'8.38"E Consultant 22 Project Name Development of Intermodal Station Project 8(a) National Highway Authority of India(NHAI) Proponent Project Address At Ajni Railway station , Nagpur Form IA 19 19 21°7'25.62"N 79°5'7.53"E 20 20 21°7'27.10"N 79°5'3.78"E SurroundingSource : Site visit Features: by team. The surrounding features of the project site are presented in Table 2 Table 2: Surrounding Features of the Project Site S. Surrounding Features Description Aerial Distance & Direction No. from the Project Site Nearest Habitation 2 Ajni Railway Colony Project Itself Dhora Nadi 10.2Km; SE 3 Nearest water body Pora Nadi 5.3Km; SSE Nanda Nala 14.0Km; SW Vena River 12.5Km; SW Nag Nadi 1.0Km; N Pioli Nadi 7.0Km; N Bagdura Nala 11.0Km; NE Kolar Nadi 14.3Km; NE Nag Nala 9.9Km; W Nearest Railway Ajni Railway station Project itself will develop at 4 Station Ajni Railway Station Nearest Airport Dr. Baba Saheb International 5 Km: SSW 5 Airport Nearest connectivity NH-7 900m ; W NH-6 1.7Km; NW NH-69 3.0Km; NNW SH-9 1.5Km; SE Ajni Railway Station 0Km;W Nagpur Railway Station 3.0Km; N Eco sensitive zone Seminary Hills RF 4.2Km; NW 6 Protected Forest near 13.8Km; S Banwadi Nearest Hospitals Cancer Hospital; Nagpur 890m; NE 7 Max Care Hospital 2 Km:s Nearest Place of St. Anthony Church 200 meter:SSE 8 worship Ajni Railway MAsjid 350 meter:S Nearest School Dhanwate National College 300m; W 9 Government Dental College & 540m; E Hospital, Nagpur Rao Saheb Jr College; Nagpur 550m; SE Environment Aplinka Solutions & Technologies Pvt. Ltd, Noida Uttar Pradesh Consultant 23 Project Name Development of Intermodal Station Project 8(a) National Highway Authority of India(NHAI) Proponent Project Address At Ajni Railway station , Nagpur Form IA 1.2. List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. Area Requirements: The development of Intermodal station at existing railway station at Nagpur measures on a plot area of 2,22,576.75 sq. m. (54.99 acre) and built-up area is 144,985.00 sq.m. The development of the landscaped area (hardscape & softscape) has been planned over an area of 66,773.025 sq.Table m. – 3: Area Statement Sr. No. Particular Area in Sqm Percentage 1 Total Plot Area 2,22,576.75 2 Permissible Ground Coverage 1,33,545.6 60 3 Proposed Ground Coverage 43,655 19.61 4 Proposed Open Area 60,935 27.38 5 Proposed Green Area 66,773.025 30.00 Area under surface parking (including 6 circulation) 34,090 15.32 7 Area under roads/pavements 57,910 26.02 1,10,895 8 Permissible FAR 8,90,304 9 Total Proposed FAR 10 Non FAR 34,090.00 11 Proposed Covered Area in Basement 34,090 15.32 12 Built Up Area 144,985.00 65.14 13 Maximum Height of Building( upto Terrace) 30 m Table 4:- Details of amenities S N Description Floors Railway 1 Station Building G+2 2 Railway Amenities in IMS G+1 3 FOB G+2 Bus 4 Platform Covering 5 Bus Amenities in IMS G+1 6 Bus Bays G+1 7 Basement Water Requirement: Environment Aplinka Solutions & Technologies Pvt. Ltd, Noida Uttar Pradesh Consultant 24 Project Name Development of Intermodal Station Project 8(a) National Highway Authority of India(NHAI) Proponent Project Address At Ajni Railway station , Nagpur Form IA Construction Phase : The water requirement during the construction phase comprises mainly 20 KLD of two parts i.e. fresh water for laborers and treated water for building constructions. It is estimated approx. of fresh water will be required for drinking purpose which will be imported in form of bottled cans from the local fresh water supplier during the days of 60 KLD construction. About of water will be required for construction purpose. The treated water requirement will be met by the treated water from the nearby CSTP, which will be brought by the private water tank. Operation Phase: It is estimated that the total water demand during the operation phase will be approx. 3,370 KLD. The fresh water requirement for the IMS is estimated to be 1,500 KLD, whereas the treated water requirement will be approx. 1870 KLD which includes water requirement for flushing & horticulture. Power Requirements: The power supply shall be supplied by Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL). In order to meet the load of 15000 KVA, it is proposed to install 8 No 2000 KVA (Prime Rating) 415 Volt 3 Phase supply each DG Sets.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    59 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us