Investment Programme Report

Investment Programme Report

Transport for London investment programme report Quarter 4 2017/18 About Transport for London (TfL) Contents Part of the Greater London Authority We are moving ahead with many of family led by Mayor of London Sadiq London’s most significant infrastructure Khan, we are the integrated transport projects, using transport to unlock growth. authority responsible for delivering the We are working with partners on major Mayor’s aims for transport. projects like Crossrail 2 and the Bakerloo line extension that will deliver the new 4 Introduction 42 London Underground We have a key role in shaping what homes and jobs London and the UK need. 42 Stations life is like in London, helping to realise We are in the final phases of completing 47 Accessibility the Mayor’s vision for a ‘City for All the Elizabeth line which, when it opens, will 8 Mayor’s Transport Strategy 48 Track renewals Londoners’. We are committed to add 10 per cent to London’s rail capacity. themes in this report 50 Infrastructure renewals creating a fairer, greener, healthier 52 Rolling stock renewals and more prosperous city. The Mayor’s Supporting the delivery of high-density, 54 Signalling and control Transport Strategy sets a target for mixed-use developments that are 11 Safety 80 per cent of all journeys to be made planned around active and sustainable on foot, by cycle or using public travel will ensure that London’s growth 57 Surface transport by 2041. To make this a reality, is good growth. We also use our own 14 Business at a glance 57 Healthy Streets we prioritise health and the quality of land to provide thousands of new 64 Air quality and environment people’s experience in everything we do. affordable homes and our own supply 66 Public transport chain creates tens of thousands of jobs 16 Key achievements 72 Asset investment We manage the city’s red route strategic and apprenticeships across the country. roads and, through collaboration with the London boroughs, can help shape We are committed to being an employer 19 2017/18 Budget milestone 75 Other the character of all London’s streets. that is fully representative of the performance summary 75 Technology and data These are the places where Londoners community we serve, where everyone 80 Growth Fund travel, work, shop and socialise. can realise their potential. Our aim is to 83 Elizabeth line Making them places for people to walk, be a fully inclusive employer, valuing and 20 Major projects cycle and spend time will reduce car celebrating the diversity of our workforce 21 Line upgrades dependency and improve air quality, to improve services for all Londoners. 27 Deep Tube upgrade programme 86 Appendix A: 2017/18 Budget revitalise town centres, boost businesses 29 Network extensions milestone performance and connect communities. We are constantly working to improve the 33 Major stations city for everyone. This means freezing TfL 41 Future projects We run most of London’s public fares so everyone can afford to use public transport services, including the London transport, using data and technology to Underground (LU), London Buses, the make services intuitive and easy to use, DLR, London Overground (LO), TfL Rail, and doing all we can to make streets and London Trams, London River Services transport services accessible to all. We (LRS), London Dial-a-Ride, Victoria Coach reinvest every penny of our income to Station (VCS), Santander Cycles and continually improve transport networks the Emirates Air Line (EAL). The quality for the people who use them every day. and accessibility of these services is fundamental to Londoners’ quality None of this would be possible without of life. By improving and expanding the support of boroughs, communities public transport, we can make people’s and other partners who we work with lives easier and increase the appeal of to improve our services. We all need sustainable travel over private car use. to pull together to deliver the Mayor’s Transport Strategy; by doing so we can create a better city as London grows. Investment programme report 3 Introduction This Investment Programme quarterly performance report provides an update on a range of projects that will deliver world-class transport services to London. This report provides a progress update Where authority is significantly lower We also include cumulative EFC Each sub-programme or project also has to the Programmes and Investment than EFC in this report, authority has movements for savings and efficiencies an overall RAG milestone status, which Committee on the major projects and been given for the current stage of works that have been embedded since our 2017 represents the average forecast date sub-programmes that seek authority and further authority will be sought Business Plan, while protecting safety, variance against plan for 2017/18 budget each year (unless extraordinary when appropriate. services and reliability. Numbers in milestones in line with the following key: approvals are needed). brackets represent an EFC increase and The EFC of each sub-programme or numbers without brackets represent an On time or early: For each major project or sub- project may display a red, amber or EFC decrease. Commentary is provided programme, the financial and milestone green (RAG) status, which represents the for cumulative movements greater data represents the position as at level of change in EFC from the previous than £2m. quarter end. We include commentary quarter in line with the following key: 1-89 days late: for key achievements and progress in This report does not contain the quarter; the report also contains, EFC increase of two per cent or more: commercially sensitive information and as far as possible, updates on any therefore some EFCs and authorities notable progress post quarter end ▲ are marked with an asterisk until the 90 or more days late: prior to publication. main contract has been awarded. On EFC increase of five per cent or more: schemes where there is commercial For a sub-programme and project with confidentiality, the EFC, authority and a defined start and end, we include ▲ spend to date may also be withheld. N/A (without 2017/18 budget milestones) the forecast completion year, which are marked: is when it is planned to be substantially EFC decrease of two per cent or more: All financial figures are gross and may complete and in customer use. Works not appear to align with costs detailed such as road resurfacing or track renewal ▼ in the TfL Budget, which are net of any that are delivered in a prioritised third-party funding. In addition to the 2017/18 budget milestones – the key sequence are denoted as ‘annual’ EFC decrease of five per cent or more: committed projects and programmes milestones listed in the TfL Budget as they are controlled and measured included in this report, we will be document – are detailed in Appendix A within each financial year. ▼▼ seeking to obtain capital spend authority (page 86). in future for schemes such as the Financial records of spend to date, Where no symbol is used, the EFC Bakerloo line extension and Crossrail 2. authority and estimated final cost increase or decrease (if any) is less than (EFC) are whole-life. This represents two per cent. the entire duration of each separate project or programme, except for annual portfolios where spend to date, authority and EFC figures represent the current financial year. 4 Introduction Investment programme report 5 Our Investment Programme is delivered • Surface comprises the following by the following areas of the business: sub-programmes: Healthy Streets; Major Projects, London Underground, Air quality and environment; Public Surface and Other, and the structure transport; and Asset investment, of this report reflects this. which are covered in pages 56–73 • Major Projects is responsible for our • Other comprises the following largest and most complex projects. sub-programmes: Technology and It comprises the following areas: Data; TfL Growth Fund; and the Line upgrades; Deep Tube upgrade; Elizabeth line (including Crossrail), Network extensions; and Major which are covered in pages 74–85 stations, which are covered in pages 20–41 of this report. The Tottenham Court Road project is complete, has been handed over to operations and is therefore no longer reported. Schemes to be delivered by Major Projects in future (see page 41) will be reported in detail following authority approval • London Underground comprises the following sub-programmes: Stations; Accessibility; Track renewals; Infrastructure renewals; Rolling stock renewals; and Signalling and control, which are covered in pages 42–55 The Investment Programme includes a significant portfolio of work to deliver Healthy Streets 6 Introduction Investment programme report 7 Mayor’s Transport Strategy themes in this report The Mayor’s Transport Strategy sets out We are making local streets healthy, a bold vision for a growing, welcoming pleasant and productive places to stop London, one where 80 per cent of at, travel through and live. Listening to, journeys will be made by walking, cycling and acting on, the suggestions of our or public transport by 2041. customers will allow us to make walking, cycling and public transport the first We are providing more trains on our choice for the vast majority of trips, busiest services, and opening the and the everyday operational excellence Elizabeth line to connect our city. will unlock the new jobs and homes that our city needs. The Mayor’s Transport Strategy themes that we are delivering through our diverse Investment Programme are indicated in this report as follows: Healthy Streets and healthy people A good public transport experience New homes and jobs The Mayor’s Transport Strategy aims to reduce Londoners’ dependency on cars in favour of walking, cycling and public transport 8 Mayor's Transport Strategy themes in this report Investment programme report 9 Safety The safety of our customers, employees and contractors is our core value.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us