CITY OF GLENDALE FIRE DEPARTMENT FIRE STATION NO. 28 RENOVATION GLENDALE, CALIFORNIA PROJECT MANUAL CONSTRUCTION DOCUMENTS PROJECT #: 17052.01 MAY 10, 2019 BLANK PAGE City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents TABLE OF CONTENTS DIVISION 1 - GENERAL REQUIREMENTS 01 10 00 Summary 01 23 00 Alternates 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 45 23 Testing & Inspection 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 73 00 Execution Requirements 01 73 29 Cutting and Patching 01 74 19 Construction Waste management 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training 01 81 19 Construction Indoor Air Quality 01 81 23 Noise and Vibration Control DIVISION 2 – EXISTING CONDITIONS 02 41 00 Demolition PMSM DIVISION 3 - CONCRETE 03 10 00 Concrete Formwork SWA 03 20 00 Reinforcing Steel SWA 03 30 00 Cast-In-Place Concrete SWA DIVISION 4 – MASONRY DIVISION 5 - METALS 05 12 00 Structural Steel SWA 05 40 00 Cold-Formed Metal Framing SWA TABLE OF CONTENTS 1 City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES 06 10 00 Rough Carpentry SWA 06 16 43 Gypsum Sheathing PMSM 06 20 00 Finish Carpentry PMSM 06 41 00 Architectural Wood Casework PMSM DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07 21 00 Thermal Insulation PMSM 07 27 00 Air Barrier PMSM 07 42 13 Metal Screen Wall PMSM 07 51 13 Cold Process Built-Up Asphalt Roofing System PMSM 07 62 00 Sheet Metal Flashing and Trim PMSM 07 84 00 Fire Stopping PMSM 07 92 05 Joint Sealers PMSM DIVISION 8 - OPENINGS 08 11 13 Hollow Metal Doors and Frames PMSM 08 14 29 Prefinished Wood Doors PMSM 08 14 76 Bifolding Wood Doors PMSM 08 51 13 Aluminum Windows PMSM 08 71 00 Door Hardware ALLEGION 08 80 00 Glazing PMSM DIVISION 9 – FINISHES 09 05 61 Common Work Results for Flooring Preparation PMSM 09 21 16 Gypsum Board Assemblies PMSM 09 22 00 Supports for Plaster and Gypsum Board PMSM 09 24 00 Portland Cement Plaster PMSM 09 30 00 Tiling PMSM 09 65 13 Resilient Flooring Base PMSM 09 68 13 Carpet Tile PMSM 09 91 00 Painting and Coating PMSM DIVISION 10 – SPECIALTIES 10 14 24 Signage PMSM 10 28 00 Toilet Accessories PMSM DIVISION 11 – EQUIPMENT DIVISION 12 – FURNISHINGS 12 36 60 Countertops PMSM TABLE OF CONTENTS 2 City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents DIVISION 21 – FIRE SUPPRESSION 21 05 00 Common Work Results for Fire Protection GM 21 13 13 Wet Pipe Sprinkler Systems GM DIVISION 22 – PLUMBING 22 05 00 Common Work Results for Plumbing GM 22 05 19 Meters and Gages for Plumbing Piping GM 22 05 23 General Duty Valves for Plumbing Piping GM 22 05 29 Hangers and Supports for Plumbing Piping and Equipment GM 22 05 48 Vibration Controls for Plumbing Piping and Equipment GM 22 05 53 Identification for Plumbing Piping and Equipment GM 22 07 00 Plumbing Insulation GM 22 11 16 Domestic Water Piping GM 22 11 19 Domestic Water Piping Specialties GM 22 13 16 Sanitary Waste and Vent Piping GM 22 13 19 Sanitary Waste Piping Specialties GM 22 34 00 Fuel-Fired Domestic Water Heaters GM 22 40 00 Plumbing Fixtures GM 22 47 00 Drinking Fountains and Water Coolers GM DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING 23 05 00 Common Work Results for HVAC GM 23 05 13 Common Motor Requirements for HVAC Equipment GM 23 05 29 Hangers and Supports for HVAC Piping and Equipment GM 23 05 48 Vibration Controls for HVAC Piping and Equipment GM 23 05 53 Identification for HVAC Piping and Equipment GM 23 05 93 Testing, Adjusting and Balancing for HVAC GM 23 07 00 HVAC Insulation GM 23 11 23 Natural Gas Piping GM 23 23 00 Refrigerant Piping GM 23 31 13 Metal Ducts GM 23 33 00 Air Duct Accessories GM 23 34 43 Ceiling Fans GM 23 37 13 Grilles, Registers and Diffusers GM 23 81 26 Split System Air Conditioners GM DIVISION 26 – ELECTRICAL 26 05 00 Common Work Results for Electrical GM 26 05 19 Low-Voltage Electrical Power Conductors and Cables GM 26 05 26 Grounding and Bonding for Electrical Systems GM 26 05 29 Hangers and Supports for Electrical Systems GM 26 05 33 Raceway and Boxes for Electrical Systems GM 26 24 16 Panelboards GM 26 27 26 Wiring Devices GM 26 51 00 Interior Lighting GM DIVISION 27 – COMMUNICATIONS TABLE OF CONTENTS 3 City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents DIVISION 28 – ELECTRONIC SAFETY AND SECURITY DIVISION 31 – EARTHWORK DIVISION 32 – EXTERIOR IMPROVEMENTS 32 17 23 Pavement Markings PMSM DIVISION 33 – UTILITIES EXHIBIT A Test Report: Asbestos Analysis of Bulk Materials – Fire Station 28 LA Testing Test Report: Lead in Paint Chips – Fire Station 28 LA Testing END OF TABLE OF CONTENTS TABLE OF CONTENTS 4 City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents SECTION 01 10 00 SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Type of the Contract. 3. Work phases. 4. Use of premises. 5. Owner's occupancy requirements. 6. Work restrictions. 7. Specification formats and conventions. 8. Deferred Approvals. 9. Pollution Control. 10. Storm Water Pollution Prevention Plan. 11. Lead-Containing materials. 12. Additional DSA requirements. 1.3 SUBMITTALS A. Contractor shall submit written statement of responsibility per CBC 1706A.1 B. R & B Schultz Early Childhood Education Building 1.4 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: City of Glendale Fire Department Fire Station 28 Renovation 1. Project Location: 4410 New York Ave, Glendale, CA 91214 B. Owner: City of Glendale C. Architect: PMSM. D. The Work consists of the following: 1. The Work includes exterior and interior renovations to building residential and work areas. The work is inclusive of architectural, structural and mechanical renovations. SUMMARY 01 10 00 - 1 City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents 2. The intent of these drawings and specifications is that the alteration, rehabilitation or reconstruction is to be in accordance with Title 24, California Code of Regulations. Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the contract documents wherein the finished work will not comply with Title 24, California Code of Regulations, a Construction Change Document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by the City of Glendale before proceeding with the repair work. 1.5 TYPE OF CONTRACT A. Project will be constructed under a single prime contract. 1.6 WORK PHASES A. The Work shall be conducted in single phase. 1.7 USE OF PREMISES A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits. B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Owner Occupancy: Allow for Owner occupancy of Project site and use by the public. 2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. 1.8 OWNER'S OCCUPANCY REQUIREMENTS A. Full Owner Occupancy: Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits, unless otherwise indicated. 1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction. 2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations. B. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed areas of building, before Substantial Completion, SUMMARY 01 10 00 - 2 City of Glendale Fire Department Project #17052.01 Fire Station No. 28 Renovation Construction Documents provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work. 1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied before Owner occupancy. 2. Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner occupancy. 3. Before partial Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages366 Page
-
File Size-