Items to Be Bid in This Package

Items to Be Bid in This Package

Items to be bid in this package: Item #1 - Mechanical Item #2 Plumbing Item #3 - Automatic Fire Protection For further information, see the Invitation to Bid and the Summary Of Work in Section 01110. PROJECT MANUAL BOULDER COUNTY SHERIFF'S HEADQUARTERS REMODEL 5600 Flatiron Parkway, Boulder, CO 80301 MECHANICAL, PLUMBING, & AUTOMATIC FIRE PROTECTION BID County Bid # 5277-10 Bid Date: Thursday, April 8, 2010, 2:00 p.m. PROJECT LOCATION & CONTACTS For: SHERIFF'S HEADQUARTERS REMODEL Located at: 5600 Flatiron Parkway, Boulder, CO 80301 OWNER STRUCTURAL ENGINEER Boulder County JVA, Inc. P.O. Box 471 1319 Spruce Street Boulder, CO. 80306 Boulder, CO 80302 303-441-3286 303-444-1951 Contact: Dave Houdeshell email: [email protected] CONSTRUCTION SUPERVISOR MECHANICAL ENGINEER Boulder County Administrative Services MKK Consulting Engineers Architect Division 7600 E. Orchard Rd., Ste. 250S P.O. Box 471 Greenwood Village, CO 80111 Boulder, CO 80306 303-796-6055 303-994-8682 cell 303-441 - 3944 Contact: Jean Petkovsek Contact: Dave Simmons Fax 303-796-6099 Email: dsimmons©bouldercounty.org email: [email protected] ARCHITECT ELECTRICAL ENGINEER Boulder County Administrative Services MKK Consulting Engineers Architect Division 7600 E. Orchard Rd., Ste. 250S P.O. Box 471 Greenwood Village, CO 80111 Boulder, CO 80306 303-796-6055 303-441-3286 Contact: Jean Petkovsek Contact: Alan Watkins email: petkovsekmkkenq.com Email: awatkinsbouldercounty.org GENERAL CONTRACTOR LIGHTING CONSULTANT Boulder County Administrative Services Clanton & Associates Inc Architect Division 4699 Nautilus Ct South Suite 102 P.O. Box 471 Boulder, CO 80301 Boulder, CO 80306 303-530-7229 303-434-4835 Contact: David Roederer Contact: Dave Hershman [email protected] Email: djhershmanbouldercounty.org ELECTRICIAN CIVIL ENGINEER Boulder County Administrative Services Drexel Barrell th Architect Division 180038 Street Contact: Bart Tennant Boulder, CO 80301 303-434-4829 btennantbouldercounty.org Contact: Jim Brzostowicz Contact: Martin Marino 303-442-4338 303-434-4834 mmarinobouldercounty.org Jbrzostowicz@drexel barrel l. Project Manual Boulder County Sheriff Headquarters Remodel / Mechanical, Plumbing, Automatic Fire Protection HVAC Bid #5277-10 TABLE OF CONTENTS DIVISION 0- BIDDING DOCUMENTS, CONTRACT, & GENERAL CONDITIONS 00020 - Invitation to Bid ........................................................................ ............ Al - A2 00100 - Instructions to Bidders .............................................................. ............ B 1 to B6 00300- Bid Form ................................................................................... ............ Cl to C3 A305 - A.I.A. Contractor's Qualification Statement (Sample) .............. ............ 1 to 6 00500 - Sample Building Construction Contract ..............................................Dl to D12 00700 - General Conditions ...............................................................................El to ElO DIVISION 1- PROJECT REQUIREMENTS 011lO Summary of Work .................................................................... ............ 01110-1-2 01300 Administrative Requirements ................................................... ............ 01300-1-2 01500 Temporary Facilities and Controls ........................................... ............ 01500-1 01600 - Product Requirements .............................................................. ............ 01600-1-2 01700 - Execution requirements & Closeout Procedures ................... ............ 01700-1-3 DIVISION 22 PLUMBING SPECIFICATION DIVISION 22 MECHANICAL SPECIFICATION Fire Protection Specifications are on the drawings Note: The drawings listed below do not represent the entire construction drawing set. Only these drawings were deemed relevant for this bid. Please contact County Representative to request any drawings not included here. TITLE SHEET, LEGEND, VICINITY MAP ....................................................A0 SITE PLAN, LANDSCAPING, DEMOLITION ................................... ............ Al FIRSTFLOOR PLAN ........................................................................................A2 SECOND FLOOR PLAN.................................................................................. A3 ROOFPLAN.......................................................................................................A4 FIRST FLOOR REFLECTED CEILING PLAN ................................... ............ AS SECOND FLOOR REFELECTED CEILING PLAN .......................................A6 MECHANICAL COVER SHEET ......................................................... ............ MP.0 15T FLOOR MECHANICAL DEMOLTION ........................................ ............ DM.1 2ND FLOOR MECHANICAL DEMOLTION ........................................ ............ DM.2 ROOF MECHANICAL DEMOLTION ................................................. ............ DM.3 (continued on next page) TC-1 1ST FLOOR MECHANICAL PLAN ...................................................... ............ M1.1 2ND FLOOR MECHANICAL PLAN ..................................................... ............ M1.2 1ST FLOOR PIPING PLAN ............................................................................... M2.1 2ND FLOOR PIPING PLAN ................................................................... ............ M2.2 ROOF MECHANICAL PLAN .............................................................. ............ M3 MECHANICAL SCHEDULES ............................................................. ............ M4. I MECHANICAL SCHEDULES ............................................................. ............ M4.2 MECHANICAL DETAILS .................................................................... ............ M5 MECHANICAL SCHEMATICS ........................................................... ............ M6 MECHANICAL CONTROLS ............................................................... ............ M7 MECHANICAL CONTROLS ............................................................... ............ M8 MECHANICAL CONTROLS ............................................................... ............ M9 MECHANICAL CONTROLS ............................................................... ............ M1O 1ST FLOOR PLUMBING DEMOLTION .............................................. ............. DPI 2ND FLOOR PLUMBING DEMOLTION ............................................. ............ DP2 1ST FLOOR PLUMBING PLAN .......................................................................P1 2ND FLOOR PLUMBING PLAN ........................................................... ............ P2 ROOF PLUMBING PLAN .................................................................... ............ P3 PLUMBING DETAILS & SCHEDULES .........................................................P4 PLUMBING ISOMETRICS ..............................................................................P5 FIRE PROTECTION PLAN .................................................................. ............ FP1 Note: Automatic Fire Protection Bid Set has architectural drawings and FP 1 only. TC-2 INVITATION TO BID Notice is hereby given that Boulder County will accept sealed bids for subcontracts for the Boulder County Sheriff Headquarters Remodel, 5600 Flatiron Parkway, Boulder, CO 80301. PLEASE NOTE: The Boulder County Architect/Construction Division will be the General Contractor for this project. Contracts to be bid at this time include only those listed below. The following items will be bid according to the project plans and specifications: Item #1 - Mechanical Item #2 Plumbing Item #3 - Automatic Fire Protection Plans and project manuals will be available on Thursday, March 25 2010 at 10:00 a.m. at the Purchasing Department in the Boulder County Courthouse West Wing (First Floor), 2020 13th Street, or please call 303-441-3525 to make alternate arrangements. You may also view the bid documents on line at Rocky Mountain Bid Net at the web link below: https://www. govh I ds.corn/scripts/CO I/Public/homel.asp A pre-bid walk-through will be held Wednesday, March 31, 2010 at 10:00 a.m. at the project site. The site is located at 5600 Flatiron Parkway, Boulder, CO 80301. Bidders are to meet the County Representative inside the main entrance on the first floor. The pre-bid conference is not mandatory, but bidders are strongly encouraged to attend. It is the bidder's responsibility to be familiar with all pre-existing conditions that may affect their bid. Bids for contracts for the Boulder County Sheriff Headquarters Remodel must be received at the Purchasing Department Office prior to the due date and time, for date and time stamping. Bids shall be submitted in a sealed envelope marked: Bid # 5277-10, Boulder County Sheriff Headquarters Remodel - Item # BIDDERS SHOULD USE THE BID FORM IN THE PROJECT MANUAL. 1. Questions concerning bidding procedures are to be brought to the Purchasing Department at the number listed above. 2. Questions concerning Technical Issues will be dealt with by the COUNTY'S REPRESENTATIVE, Alan Watkins, Boulder County Architect's Office, 2020 13th St., Boulder, CO 80302, ph. 303-441-3286 (fax: 303-441-1718). [email protected] Submittal Due: Date: Thursday, April 8, 2010 Time: 2:00 P.M. At: Boulder County Purchasing Office 2020 13th Street Boulder, Colorado 80302 UT 4. Late Bids are those with a date and time stamp from the Boulder County Purchasing Office after the due date and time. They will be returned unopened.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    206 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us