GOVERNMENT of KHYBER PAKHTUNKHWA PAKHTUNKHWA HIGHWAYS AUTHORITY, PESHAWAR Tel: No

GOVERNMENT of KHYBER PAKHTUNKHWA PAKHTUNKHWA HIGHWAYS AUTHORITY, PESHAWAR Tel: No

GOVERNMENT OF KHYBER PAKHTUNKHWA PAKHTUNKHWA HIGHWAYS AUTHORITY, PESHAWAR Tel: No. 091-9213272, Fax No. 091-9210434, E-mail: [email protected] Attached Departments Complex near Treasury Office, Khyber Road Peshawar NOTICE INVITING E-BIDDING (Single Stage Single Envelope E-Bidding System) Pakhtunkhwa Highways Authority (PKHA) invites Electronic Bids from eligible firms / contractors in accordance with KPPRA Procurement Rules 2014 on, "Single Stage Single Envelope" E-Bidding Procedure for the following works. The bidders should be registered with Pakistan Engineering Council (PEC) for the Year 2020 — 21 in relevant Category & Field of Specialization. The firms already enlisted with PKHA having adequate financial soundness, relevant experience, personnel capabilities, required artici ate in the tender e uioments and other requirements as included in ITB can . ' Required Cost of Date Category Last Estimated Bid Tender Period & Date & s. Name of Work Cost in of Security Form I of Time No Million P.E.CI (Rs:) Documents Completion Time of of Submission ''' PKHA (Rs:) Opening On Special Repair / 22-06-21 Same Package No. 19/2020-21 (P/B): C-6/ 2% of 06 Estimated at 12:00 Day at 1 AOM&R to P-H/Way S-3. 17.00 5,100 Months PH-8 cost hrs 12:30 Sub Head: Batkhela-Qulangi Section (Km 01-22) hrs Special Repair / Package No. 20/2020-21 (P/B): C-6/ 10.00 -do- 3,000 -do- -do- -do- 2 AOM&R to P-H/Way S-3. PH-8 Sub Head:, Qulangi-Totai Section (Km 23-55) Package No. 21/2020-21 (P/B): Special Repair / C-6/ 8.00 -do- 2,400 -do- -do- -do- 3 AOM&R to P-H/Way S-3. PH-8 Sub Head: Totai-Dar:ai Section Km 56-90 Package No. 22/2020-21 (P/B): Special Repair / C-6/ 18.00 -do- 5,400 -do- -do- -do- 4 AOM&R to P-H/Way S-3-C. PH-8 Sub Head: B. am to Gat 20 Kms Package No. 23/2020-21 (P/B): Special Repair / C-6/ 6.00 -do- 1,800 -do- -do- -do- 5 AOM&R to P-H/Way S-10. PH-8 Sub Head: Km 88 — 102 Package No. 24/2020-21 (P/B): Special Repair / C-5/ 40.00 -do- 12,000 -do- -do- -do- 6 AOM&R to P-H/Way S-5. PH-7 Sub Head: Rue •er-Ghoralalli Section 25 KM) Package No. 25/2020-21 (P/B): Special Repair / C-5/ 40.00 -do- 12,000 -do- -do- - (C. - 7 AOM&R to P-H/Way S-5. Sub Head: Barrian- PfI -7 Nathiagalli-Abbottabad Section (57.5 Km) Package No. 26/2020-21 (P/B): Special Repair / C-6/ 15.00 -do- 4,500 -do- -do- -do- 8 AOM&R to P-H/Way S-5-B. PH-8 Sub Head: Sarai Saleh Serian via Rehana Road Package No. 27/2020-21 (P/B): Special Repair/ C-4/ 80.00 -do- 24,000 -do- -do- -do- 9 AOM&R to P-H/Way S-7. PH-6 Sub Head: Chapri to Sadda (Km 100 to 147) 47 km Package No. 28/2020-21 (P/B): Special Repair/ C-4/ Sadda to 80.00 -do- 24,000 -do- -do- -do- 10 AOM&R to P-H/Way S-7. Sub Head: PH6 Parachinar (Km 147 to 181) 34 Km Package No. 29/2020-21 (P/B): Special Repair/ C-4/ -do- 21,000 -do- -do- -do- 11 AOM&R to P-H/Way S-8. Sub Head: Makin to 70.00 PH-6 Patasi Adda (184 to 261 Km) 77 km Package No. 30/2020-21 (P/B): Special Repair/ C-6/ 20.00 -do- 6,000 -do- -do- -do- 12 AOM&R to P-H/Way S-8. Sub Head: Khirgi to 131-1 -8 Sara Rogha (Km 107 to 151) 44 Km Package No. 31/2020-21(P/B): Special Repair/ C-5/ -do- -do- -do- 13 AOM&R to P-H/Way S-8. Sub Head: Sara Rogha 40.00 PH-7 -do- 12,000 to Makin (km 151 to 184) 33 Km Page 1 014 E: Tenders \ 2020-21\1'Jan - 13 \Package No. 19 to 38-2020-21 (Plan-B).docx On Package No. 32/2020-21 (P/B): Special Repair/ C-6/ 24-06-21 Same 14 AOM&R to P-H/Way S-1. 15.00 -do- 4,500 -do- at 12:00 Day at PH -8 Sub Head: Ghazi - Serikot - Panian Road (40 Km). hrs 12:30 hrs Package No. 33/2020-21 (P/B): Special Repair/ C-6/ AOM&R to P-H/Way (S-1) Sub Head: Serikot 20.00 -do- 6,000 -do- -do- -do- 15 PH-8 Bypass Road Haripur Section (8 Km). Package No. 34/2020-21 (P/B): Special Repair / C-5/ AOM&R to P-H/Way S-12. Sub Head: Mansehra- 45.00 -do- 13,500 -do- -do- -do- 16 PH-7 Oghi-Darband-Chandoor Section (95 Km) Package No. 35/2020-21 (P/B): Special Repair / C-4/ 17 AOM&R to P-H/Way S-12. Sub Head: Chandoor- 75.00 -do- 22,500 -do- -do- -do- PH-6 Haripur Section Length (72 Kms) Package No. 36/2020-21 (P/B): Special Repair / C-6/ AOM&R to P-H/Way S-12-B. 18.00 -do- 5,400 -do- -do- -do- 18 PH-8 Sub Head: Oghi-Jar Galli Section (13 KM) Package No. 37/2020-21 (P/B): Special Repair / AOM&R to P-H/Way (S-3-A) Qulangi-Bandagai C-5/ 19 37.00 -do- 11,100 -do- -do- -do- road via Japan Bridge (26 Km). Sub Head: Qulangi- PH-7 Bandagai Road (KM 1-26) Special Repair / Package No. 38/2020-21 (P/B): C-6/ Arkot to 17.00 -do- 5,100 -do- -do- -do- 20 AOM&R to P-H/Way S-3-C. Sub Head: PH-8 Biakand-Nakhtar Kandaw (10 Kms) Package No. 39/2020-21 (P/B): Special Repair / C-5/ AOM&R to P-H/Way S-3-D. 30.00 -do- 9,000 -do- -do- -do- 21 PH-7 Sub Head: Khadaqzai Bridge to Chakdara Road Special Repair / Package No. 40/2020-21 (P/B): C-6/ Sub Head: Rahat Kot 29.90 -do- 9,000 -do- -do- -do- 22 AOM&R to P-H/Way S-3-F. PH-8 to Salchra Road (10 Kms) Special Repair / Package No. 41/2020-21 (P/B): C-5/ 30.00 -do- 9,000 -do- -do- -do- 23 AOM&R to P-H/Way S-4. PH-7 Sub Head: Timergara Bypass Road. Special Repair / Package No. 42/2020-21 (P/B): C-5/ 24 AOM&R to P-H/Way S-4-A. Sub Head: Munda- 35.00 PH-7 -do- 10,500 -do- -do- -do- Samarbagh Road (Km 01-30) Package No. 43/2020-21 (P/B): Special Repair / C-5/ 25 AOM&R to P-H/Way S-4-B. Sub Head: Balambat- 35.00 pll...7 -do- 10,500 -do- -do- -do- Maidan-Kalpani-Barawal-Bandi Road. 2. Tender Form, B.O.Q, Instruction to Bidders (ITB) & Scope of Work / TOR's can be downloaded from (www.pkha.zov.pk) & KPPRA website (www.kppra.zov.pk) before opening date and submit it along with bid, otherwise bids submitted without these documents will be considered as non-responsive. 3. All bidders are required to be registered with the Khyber Pakhtunkhwa Revenue Authority (KPRA) (Active Status). NI ...1RECTOR — P1CHA — Peshawar C Ph # 091-9210963 EATenders \ 2020-21 \ Plan - B\Package No. 19 to 43-2020-21 (Plan-B).doca Page 2 of 4 • (SINGLE STAGE SINGLE ENVELOP E-BIDDING SYSTEM CONDITIONS/ITB) 1. Bid Security (2% of the Estimated Cost) in the shape of Call Deposit (CDR) or Bank Guarantee (in original) shall be provided before closing time and must be uploaded on E-Bidding System. 2. Cost of Tender form (@0.03% of Estimated Cost) (Non-refundable) in the shape of Call Deposit (CDR) (in original) shall be provided before closing time. 3. Financial Bid should be submitted online / electronically and CDR (in original) & other relevant documents should reach in this office in sealed envelope on or before the closing date & time. 4. Electronic Bids will be displayed Online on E-Bidding System after 30 minutes of closing time in the presence of bidders / their representatives who chose to be present. 5. The contractors quoting their bids more than 10% below on Engineer's Estimate shall submit an Additional Bid Security equal to 8% of the bid cost along with the 2% bid security at the time of bid submission. 6. If the successful contractor who has quoted a rate more than 10% below on the Engineer Estimate and has repudiated the contract, the entire security deposit i.e. 2% bid security along with 8% additional bid security shall be forfeited in favor of the Government. 7. The bidder are required to quote their rates (electronically) "ABOVE / BELOW / AT PAR" for both priced BOQ / Engineer Estimate based on MRS -2020 applicable and NSI Items as well. Only two digits after the decimal point shall be considered for evaluation purpose. 8. Any bidder who provides incorrect information shall stand disqualified & de-barred. 9. Time allowed for the completion of the work as specified in the NIT shall start from the issuance of Work Order. 10. Electronic Bids validity period is 90-days. 11. Successful Bidder should sign the agreement with the department within Twenty Eight (28) days after issuance of Work Order.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us