London Overground Mike Stubbs Director London Overground

London Overground Mike Stubbs Director London Overground

London Overground Mike Stubbs Director London Overground Contents • What is London Overground? • The need for London Overground • Where we started • Our journey • Where we are today • Future direction • Lessons & Conclusions AWhat history is London of growth... Overground ? • The part of Transport for London responsible for our heavy rail train services • We operate an outer London orbital rail network within Greater London • We set the specifications for train frequency, station facilities and overall performance, and are responsible for fares and revenue • We plan and fund improvements and extensions to the network • Network Rail manages and maintains most of the track and signals, as London Overground is part of the National Rail network 30% of Londoners are within walking distance of a London Overground station The need for London Overground The existing networks only facilitated radial journeys Aims of London Overground • Provide metro services on mainline rail in London • Add capacity – make better use of London’s forgotten railways • New journey opportunities – enable orbital journeys • Drive regeneration and change – through improved transport links • Higher service standards – integration with wider TfL network, common ticketing, information and customer service standards Immediate Objectives Existing, underperforming routes were devolved to TfL in 2007, creating London Overground • Increased Safety and Customer Service – staffed stations, TfL standards • Increased Reliability – industry leading punctuality • Increased Frequency – minimum 4tph service on all lines ‘Turn Up and Go’ • Expanded Network Delivered through: – Relentless management effort – An integrated, largely outsourced business – Targeted investment Where did we start in 2007? Investment – East London Line Project in 3 Phases System Engineering principles on ELL Project • Lifecycle Management • Operational concept • Requirements Definition • Modelling • System Breakdown Structure (Levelling) • Interface definition and management • Configuration Management and Baselines • Assurance ProjectSystem Lifecycle Engineering Lifecycle Development Operation & Remit Maintenance Inception Functional Trial Operations Specification Feasibility Closeout Preliminary Test Running Design Detailed Design Test & Commissioning Development Manufacture & Installation Delivery SystemManaging Engineering Delivery Breakdown - System Breakdown Structure Assurance – Test Running and Trial Operations • Four stages of Test Running to include dynamic tests of infrastructure and rolling stock separately then integrated • Trial Operations with Railway handed over to operations – Shadow operation to demonstrate suitability of people and processes – Emergency exercises – Emergency services testing of procedures – Full opening date achieved 24 May 2010 Assurance - Technical Case • Technical Case addressed totality of assurance • Technical Case required and assembled evidence that: – ELL will possess required behaviour (Product based argument) – correct processes used (Process based argument) • Supplier had “burden of proof” that acceptance criteria was met, Project accepts • TC used Goal Structuring Notation to make the assurance argument clear through visual representation Our Journey – Change and Growth 5 car trains (LOCIP) Orbital Network (ELL P2) ELL P1A WA Class 378s Devolution and NLL Capacity (NLRIP) Opening of ELL Responding to Growth - LO Capacity Improvement Programme Mayor committed • 1st ELL 5 car train by end 2014 • 1st 5 car train on rest of LO by end 2015 Where we started .... Where are we now Where we have come from Where are we now • 184 million passengers last year (33 million in 2007) • 1485 trains per day • 125km of route • Serving 112 stations. • We operate 98 trainsets, consisting of: – 90 electric trains – 8 diesel trains • Delivered in under 9 years, through c £2bn of investment The Future • More change and growth! • A new operator from November 2016 with a focus on even higher operational performance • Expansion through devolution rather than construction • Political, public and stakeholder support for more of London Overground, but….. …..absolute need to maintain day to day performance at the highest levels Lessons and Conclusions • London Overground has been a huge success • Focus on clear objectives – deliver what the customer wants • Integrated business – common goals, including down supply chain • Targeted investment in incremental improvements – highly cost effective • Be prepared for continual change Mike Stubbs – Director London Overground Transport for London [email protected] +44 (0)7770 645027 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us