Creating a World Class Metro for Pune City

Creating a World Class Metro for Pune City

Mobility in Smart Cities of Maharashtra – Case Study on Pune PRESENTATION AT URBAN MOBILITY CONFERENCE, INDIA BY RAJENDRA JAGTAP ADDITIONAL MUNICIPAL COMMISSIONER PUNE MUNICIPAL CORPORATION, PUNE Contents Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last Current mobility challenges faced by Pune Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed Proposed integrated mobility plan for Pune 2 About Pune Metropolitan Region th Time Standard India 20:51 03/11/2016 Modified Last 8 – Most populous city of India 7,200 sq. km – Area under PMR1 11 million – Population of PMR 432 sq. km – Area under PMC and PCMC 5.1 million – Population of PMC and PCMC Time Standard India 19:06 12/10/2016 Printed 46,17,773 – Vehicles registered2 500–600 per day – New cars registered th 5 – highest city by GDP in country INR 1,065 billion – GDP of Pune city (5th highest in country) 1 Comprises Pune, Pimpri- Chinchwad, Parts of Haveli, Daund, Bhor, Shirur, Mulshi and surrounding 854 villages ; 2 As of Aug 2016 Source: Press search, Census, Pune Municipal Corporaton 3 Traffic has consistently emerged as the #1 concern of Punekars time and again Citizen engagement output – top concerns for citizens of Pune Time Standard India 20:51 03/11/2016 Modified Last Transportation & Mobility 30% Water Supply & Sewage 25% Waste & Sanitation 22% 01 Time Standard India 19:06 12/10/2016 Printed Environment & Sustainability 12% 02 Safety & Security 3% 03 Energy 2% 04 05 06 4 Pune traffic heat map at 7 pm on Monday morning (based on Google map) Pune traffic at 7 pm Time Standard India 20:51 03/11/2016 Modified Last on Monday evening is Google mapping a nightmare! Major Kharadi residential IT hub centres Time Standard India 19:06 12/10/2016 Printed Hadapsa r IT Major residential area Major residential 5 Pune faces significant challenges in urban mobility and transport (1/2) Core Tenets of Time Standard India 20:51 03/11/2016 Modified Last urban mobility Fatalities (per lakh population) 11 8 Safe 5 2008 2013 Average peak hour speed, 2013 Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed 24 20 30 Swift 18 Bus 2WL 4WL Average waiting time, mins. (% of routes) Reliable 72 4 12 12 <10 10-20 20-60 >60 6 Pune faces significant challenges in urban mobility and transport (2/2) Bus fleet (lakh /popN) Condition of footpath, 2013 (%) Time Standard India 20:51 03/11/2016 Modified Last 40 46 55 33 33 27 2008 2013 No footpath < 2 mtrs >3 mtrs Share of public transport (%) Obstructions on footpath, 2013 50 Time Standard India 19:06 12/10/2016 Printed 47 53 18 19 0 2008 2013 <7 3-6 <2 2 WL and 4 WL penetration On street parking 2 WL Cars 633 20 400 13 198 83 5 2008 2015 2008 2013 SOURCE: MoUD study, 2008; CMP, 2008; TSR, 2013 7 Key mobility parameters will become even worse unless an integrated mobility 2 WL Car plan is created for Pune Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last 18 12 Average speed 9 (Km/hour) 2013 2021 2031 633 785 880 Vehicle Time Standard India 19:06 12/10/2016 Printed Penetration 198 253 296 (per 1000 population) 2013 2021 2025 13 10 11 Average trip length (Kms) 2013 2021 2031 SOURCE: MoUD report, 2008; TSR, 2013; India’s urban awakening, MGI, 2010 8 Contents Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last Current mobility challenges faced by Pune Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed Proposed integrated mobility plan for Pune 9 How do we solve the issue of mobility Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last “A developed country is not a place where the poor have cars. It’s where the rich use public transport” - Enrique Penalosa, former Mayor of Bogotá, Colombia Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed “Bring about equitable use of road space with people and not vehicles as the focus” - National Urban Transport Policy 10 In order to resolve these mobility issues, a Comprehensive Mobility Plan (CMP) has been designed by Pune City Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last Break-up of travel (2016) How we want Pune to travel in 2026 Private Private Walk Transport Transport Walk 28% 29% Time Standard India 19:06 12/10/2016 Printed 33% 47% 5% Cycle Cycle 10% 5% 9% Para- Public 11% transit 23% Transport Paratransit Public Transport SOURCE: Pune CMP 11 This resolve, to change the way Pune travels, would be anchored on 8 pillars ▪ 76 Km of metro planned across 2 phases Time Standard India 20:51 03/11/2016 Modified Last ▪ Total length of 37.2 km 8 ▪ Phase 1 to consist of 31 Km of network and 45 ▪ Includes road widening, BRT, Street Metro Km in Phase 2 furniture, in-out designing Network Public HCMTR 1 transport ▪ Common mobility card, i.e., “MI” card 7 enhancement ▪ 2000+ buses enabled with GPS ▪ Focus on TOD with FSI upto 4 possible ▪ Transport command and control centre under TOD (depending on street width) ▪ 1550 + buses being procured out of which 550 ▪ Under smart city plan, work initiated for would be A/C buses to improve public comfort creation of 10 acre ToD New DCR BRT – focus on 6 2 Time Standard India 19:06 12/10/2016 Printed TOD . 16 KMs of existing corridor . Additional 64 kms under various stages of ▪ Goal to achieve 25% of trips by bicycle planning/implementation ▪ Create 100kms + of dedicated bicycle Urban Bicycle track 5 street ▪ Create a Public Bicycle sharing system design with 1000 bikes over next 5 years as part of 3 Smart cities Pedestrian policy . Re-designing of street to ensure it move "people" and not cars; 400 kms of street ▪ A policy which puts people first instead of cars to be re-designed ▪ Better road design and traffic calming to make 4 . Pilot program to cover ~30 kms of road to road safer for pedestrians be implemented by end of 2017 ▪ Creation of pedestrian only zones across the city . Objective is to improve walkability ▪ Promoting walkability 12 1 Public transportation enhancement with objective of improving ridership through increased availability, convenience and increasing reliability 1550 buses under procurement including 550 Time Standard India 20:51 03/11/2016 Modified Last Common Mobility Card defined A/C buses Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed 2000+ buses fitted with GPS1 Central Command and control centre 1 old buses fitted with GPS 13 2 Pune’s proposed BRT network 16 km – Operational from 2015-16 Time Standard India 20:51 03/11/2016 Modified Last 19 km additional – To be operational from April ‘17 15 km re-design – to be operational from April ‘17 ~30 km additional corridor – to be operational from 2018 Time Standard India 19:06 12/10/2016 Printed SOURCE: Pune Municipal Corporation 14 3 Urban street design guidelines developed for Pune Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last Features of the policy ▪ Based on principals of universal access ▪ Increased focus on Pedestrianisation and increase walkability Time Standard India 19:06 12/10/2016 Printed ▪ Cycle friendly ▪ Organised hawkers space ▪ Strong focus on organised parking and parking policy SOURCE: Pune Municipal Corporation 15 15 3 400 kms of the streets to be re-designed by 2020; 100 already under design phase Proposed corridor of 100 kms Time Standard India 20:51 03/11/2016 Modified Last under street redesign by 2017 Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed SOURCE: Pune Municipal Corporation 16 16 3 On-going mock through “reversible changes” to ensure people experience pedestrianization before long term changes are made Last Modified 03/11/2016 20:51 India Standard Time Standard India 20:51 03/11/2016 Modified Last Printed 12/10/2016 19:06 India Standard Time Standard India 19:06 12/10/2016 Printed SOURCE: Pune Municipal Corporation 17 17 4 A Pedestrian policy has been defined for Pune Features of the policy Time Standard India 20:51 03/11/2016 Modified Last ▪ Status, dignity and top priority to walking by changing the existing attitude and mindset of all concerned ▪ Better road design and traffic calming to make road safer for pedestrians Time Standard India 19:06 12/10/2016 Printed ▪ Creation of pedestrian only zones across the city ▪ Promoting walkability as convenient and zero cost mode of transport ▪ Detailed policy is available on ▪ https://go.itdp.org/download/attachments/47653152/PMC%20Pedestrian%20policy_%20ENG_Re v_FINAL_dt.%2024-02-16.pdf?version=1&modificationDate=1461651378497&api=v2 SOURCE: Pune Municipal Corporation 18 5 Detailed plan for cycling under preparation; Objective to improve mode share of cycle from 5% to 10% by 2026 Features of the plan Time Standard India 20:51 03/11/2016 Modified Last ▪ Creating safe, convenient, comfortable cycling conditions for the current and future cyclists ▪ Aspiration to convert long private trips from 4 wheelers to cycles and public transport ▪ Aspiration to convert short private trips from private Time Standard India 19:06 12/10/2016 Printed modes to cycles ▪ Support safe behaviour by motorists towards non- motorised mode ▪ Implement state of the art public bicycle sharing system with 1000+ bikes in the next 3 years SOURCE: Pune Municipal Corporation 19 5 Preliminary Identification of Locations for Public Bicycle System in Pune completed (Pending ground truthing,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    28 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us