PPP Road Projects

PPP Road Projects

<p><strong>PPP Road Projects </strong></p><p><strong>ROGELIO L. SINGSON </strong></p><p>Secretary <br>Department of Public Works and Highways </p><p>November 18, 2010 </p><p>1</p><p><strong>PRESENTATION OUTLINE </strong></p><p>Strategic Directions Expressways in Operation and Under Construction Projects for Bidding in 2011 PPP Pipeline of Projects&nbsp;under the Medium Term Other DPWH PPP Projects Under Development </p><p>2</p><p><strong>STRATEGIC DIRECTIONS </strong></p><p>Upgrading the national road network&nbsp;in terms of&nbsp;quality and safety standards with focus&nbsp;on urban centers and&nbsp;strategic tourism destinations; </p><p>Completion of critical&nbsp;bridges along national roads; Develop more Public-Private Partnership (PPP) projects for much needed infrastructure and level playing field for investments; </p><p>Address private sector concerns – Transparency, RROW, regulatory risks and government support; </p><p>Pursue contracts for long term maintenance period&nbsp;(5-10 years) in road and bridge construction; and </p><p>Introduce innovative technology such as bio-engineering for road slope protection </p><p>3</p><p><strong>EXPRESSWAYS </strong><br><strong>IN OPERATION </strong></p><p><strong>Project Name </strong></p><p>Subic-Clark-Tarlac Expressway (93.77 km) North Luzon Tollway (82.62 km) C-5 Expressway (Segment 8.1, 2.34 km) Metro Manila Skyway, Stage 1 (13.43 km At-grade &amp; 9.30 km Viaduct) </p><p>Manila-Cavite Toll Expressway (6.75 km) </p><p>South Luzon Tollway (36.03 km) </p><p>Southern Tagalog Arterial Road (41.90 km) </p><p>4</p><p><strong>Total Length = 286.14 km </strong></p><p><strong>EXPRESSWAY UNDER </strong><br><strong>CONSTRUCTION/PLANNING </strong></p><p><strong>Project Name </strong></p><p>Tarlac- Pangasinan- La Union Toll Expressway (TPLEX) (88.58 km) </p><p>North Luzon Tollway, C-5 Expressway <br>Segment 8.2 - 10.23 km Segment 9&nbsp;- 4.06&nbsp;km Segment 10&nbsp;- 5.63&nbsp;km </p><p>NLEx-SLEx Link Expressway (13.4 km) (Unsolicited proposal&nbsp;for NEDA review and subject to&nbsp;Swiss Challenge) </p><p>Manila-Cavite Toll Expressway, R-1 Extension (7.00 km) </p><p>Metro Manila Skyway, Stage 2 (6.88 km) </p><p><strong>Total Length = 135.78 km </strong></p><p>5</p><p><strong>EXISTING SITUATION IN METRO MANILA AND NEARBY AREAS </strong></p><p>Arterial road network&nbsp;composed of 6 circumferential and 10 radial roads proposed in the late 1960s.&nbsp;All radial roads already completed; however, development of circumferential roads&nbsp;still incomplete; </p><p>Three expressways, namely NLEX, SLEX&nbsp;and the ManilaCavite Toll Road&nbsp;presently functioning independently and not formed as a network; </p><p>Heavy traffic&nbsp;is the norm in Metro Manila; and Travel speed in most major roads in Metro Manila quite slow at less than 20 kph and even less than 10 kph in some major roads including Aguinaldo Highway in Cavite Province. </p><p>6</p><p><strong>EXISTING AND </strong><br><strong>PROPOSED </strong><br><strong>EXPRESSWAYS : </strong><br><strong>200 Km SPHERE OF </strong><br><strong>METRO MANILA </strong></p><p>7</p><p><strong>PROJECTS FOR IMPLEMENTATION IN 2011 </strong></p><p>Cavite-Laguna Expressway (Cavite Side) NAIA Expressway, Phase II NLEX-SLEX Link Expressway (Unsolicited Proposal) </p><p>8</p><p><strong>Proposed PPP Projects </strong></p><p><strong>1. Cavite-Laguna&nbsp;Expressway - Cavite Side (27.5 km) </strong></p><p>• Vital&nbsp;access between&nbsp;economic zones in Cavite Province and Ninoy Aquino International Airport (NAIA), Metro Manila Ports, Batangas Port&nbsp;and decongest traffic of Cavite roads, particularly Aguinaldo Highway <br>• 6&nbsp;lanes, at-grade expressway, with a total length of 27.5 kilometers <br>• Estimated&nbsp;total project cost is PhP <br>11.79 Billion (US$ 262 Million) <br>• ROW&nbsp;acquisition is PhP 0.96 B </p><p>9</p><p><strong>Milestones – CAVITE-LAGUNA Expressway </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Particular </strong></li><li style="flex:1"><strong>Date </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">Hiring of financial transaction advisor </li><li style="flex:1">Dec 2010 </li></ul><p>Preparation of technical/financial plans and tender </p><ul style="display: flex;"><li style="flex:1">documents </li><li style="flex:1">Aug 2011 </li></ul><p>Aug 2011 <br>Completion of ROW acquisition plan and resettlement plan, if applicable </p><p></p><ul style="display: flex;"><li style="flex:1">Submission to NEDA Investment Coordination Committee </li><li style="flex:1">Aug 2011 </li></ul><p>Commencement of bidding process Target Bid date <br>Sept 2011 Dec 2011 </p><p>10 </p><p><strong>Proposed PPP Projects </strong></p><p><strong>2. NAIA&nbsp;Expressway (Phase II) </strong></p><p>• The&nbsp;project will link Skyway and <br>Manila-Cavite Coastal Expressway <br>• Provide&nbsp;vital access to NAIA Terminals <br>1, 2, &amp; 3 <br>• 4&nbsp;-lane elevated expressway with a total length of 5.19 kilometers <br>• Total&nbsp;investment requirement is PhP <br>10.59 Billion (US$235.33Million) <br>• ROW&nbsp;acquisition is PhP 1.02 B </p><p>11 </p><p><strong>Milestones – NAIA Expressway, Phase II </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Particular </strong></li><li style="flex:1"><strong>Date </strong></li></ul><p></p><p>Feasibility Study ROW acquisition plan and resettlement plan <br>Completed <br>To be undertaken by Private Sector <br>Submission to NEDA Investment Coordination Committee </p><ul style="display: flex;"><li style="flex:1">Of Implementation Program </li><li style="flex:1">Jan 2011 </li></ul><p>Commencement of bidding process Target Bid date <br>Mar 2011 July 2011 </p><p>12 </p><p><strong>Proposed PPP Projects </strong></p><p><strong>3. NLEX-SLEX Link Expressway </strong></p><p>• To&nbsp;close the gap&nbsp;and complete the northsouth Luzon industrial beltway transport axis by connecting NLEx and SLEx <br>• It&nbsp;starts at Caloocan City and ends at Makati <br>City. It is an elevated expressway over PNR right-of-way. <br>• Submitted&nbsp;by MPTC as an unsolicited proposal. <br>• Endorsed&nbsp;to NEDA for evaluation and approval. <br>• Expected&nbsp;Date of Bidding (Swiss Challenge) <br>– <sup style="top: -0.45em;">2nd </sup>Quarter of 2011. <br>• Detailed&nbsp;Design and Construction Schedule <br>– 3<sup style="top: -0.45em;">rd </sup>Quarter of 2011 – 2014. <br>• Estimated&nbsp;total project cost is PhP 21 Billion <br>(US$ 467 Million) </p><p>13 </p><p><strong>PPP Pipeline of Projects for Implementation in the Medium Term </strong></p><p><strong>(For Bidding Beyond 2011) </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Length (Km) </strong></li><li style="flex:1"><strong>Cost </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">1. Cavite-Laguna&nbsp;Expressway – Laguna </li><li style="flex:1">14.3 </li><li style="flex:1">PhP 7.00 B </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Side </li><li style="flex:1">(US$ 155.56 M) </li></ul><p>Section </p><p></p><ul style="display: flex;"><li style="flex:1">2. C-5/FTI/Skyway&nbsp;Connector </li><li style="flex:1">6.8 </li><li style="flex:1">PhP 5.64 B </li></ul><p>(US$ 125.33 M) </p><p>3. C-6&nbsp;Expressway (Global City Link) – <br>South Section <br>50.0 43.6 35.7 <br>PhP 40.4 B <br>(US$ 897.78 M) </p><p>4. C-6&nbsp;Expressway (Laguna de Bay Flood <br>Control Dike Expressway) <br>PhP 18.59 B <br>(US$ 413.11 M) </p><p>5. Central&nbsp;Luzon Expressway (CLEX), <br>Phase 2 (Cabanatuan-San Jose) <br>PhP 11.81 B <br>(US$ 262.44 M) </p><p>14 </p><p><strong>PPP Pipeline of Projects for Implementation in the Medium Term </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Length (Km) </strong></li><li style="flex:1"><strong>Cost </strong></li></ul><p></p><p>6. SLEX&nbsp;Extension (to Lucena City), <br>2-lane </p><ul style="display: flex;"><li style="flex:1">47.8 </li><li style="flex:1">PhP 9.5 B </li></ul><p>(US$ 211.11 M) </p><p></p><ul style="display: flex;"><li style="flex:1">7. Calamba-Los&nbsp;Banos Expressway </li><li style="flex:1">15.5 </li></ul><p>16.1 <br>PhP 5.9 B <br>(US$ 131.11 M) </p><p></p><ul style="display: flex;"><li style="flex:1">8. R-7&nbsp;Expressway </li><li style="flex:1">PhP 23.98 B </li></ul><p>(US$ 532.89 M) </p><p>9. NLEX East/La Mesa Parkway </p><p><strong>Total </strong></p><p>103.0 </p><p><strong>332.80 </strong></p><p>PhP 38.8 B <br>(US$ 862.22 M) </p><p><strong>PhP 161.62 B </strong><br><strong>(US $ 3,591.55 M) </strong></p><p>15 </p><p><strong>OTHER DPWH&nbsp;PPP PROJECTS UNDER DEVELOPMENT </strong></p><p>Long Term Performance Based Road Maintenance Projects This is a contracting methodology which will ensure good roads throughout the contract duration (e.g. 10 years or more) for a specified level of service </p><p>National Bridge Program This will involve the design, construction and 10-yr maintenance contract for national bridges which are identified as priorities. </p><p>Weighbridge Operation Aims to privatize the operation of weighbridge&nbsp;to have an efficient control of overloading along the selected pilot service area </p><p>Metro Cebu and Mindanao Expressway Projects </p><p>16 </p><p><strong>Please Visit us at </strong><a href="/goto?url=http://www.dpwh.gov.ph" target="_blank"><strong>www.dpwh.gov.ph </strong></a></p><p>17 </p><p><strong>PPP Road Projects </strong></p><p><strong>ROGELIO L. SINGSON </strong></p><p>Secretary <br>Department of Public Works and Highways </p><p>November 18, 2010 </p><p>18 </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us