Application to the South Dakota Public Utilities Commission for Facility Permits

Application to the South Dakota Public Utilities Commission for Facility Permits

BURNS~ £DONNELL~ Application to the South Dakota Public Utilities Commission for Facility Permits Sweetland Wind Farm, LLC Sweetland Wind Farm Project Burns & McDonnell Project No. 103828 Final 3/6/2019 Application to the South Dakota Public Utilities Commission for Facility Permits Sweetland Wind Farm, LLC Sweetland Wind Farm Project Hand County, South Dakota Burns & McDonnell Project No. 103828 Final 3/6/2019 prepared by Burns & McDonnell Engineering Company, Inc. Centennial, Colorado COPYRIGHT © 2019 BURNS & McDONNELL ENGINEERING COMPANY, INC. Application for Facility Permit Table of Contents TABLE OF CONTENTS Page No. COMPLETENESS CHECKLIST 1.0 INTRODUCTION ............................................................................................... 1-1 2.0 PROJECT DEVELOPMENT SUMMARY .......................................................... 2-1 2.1 Community Outreach and Land Acquisition ....................................................... 2-1 2.2 Summary of Agency Coordination ...................................................................... 2-2 2.3 County Permitting ................................................................................................ 2-3 2.4 Purchase and Off-take Agreements ..................................................................... 2-3 2.5 Environmental Analysis ....................................................................................... 2-3 2.6 Project Design ...................................................................................................... 2-4 3.0 FACILITY PERMIT APPLICATION ................................................................... 3-1 3.1 Relationship to NEPA .......................................................................................... 3-1 3.2 Summary of Potential Impacts ............................................................................. 3-1 4.0 NAMES OF PARTICIPANTS (ARSD 20:10:22:06) .......................................... 4-1 5.0 NAME OF OWNER AND MANAGER (ARSD 20:10:22:07) ............................. 5-1 6.0 PURPOSE OF, AND DEMAND FOR, THE WIND ENERGY FACILITY (ARSD 20:10:22:08, 20:10:22:10) .................................................................... 6-1 6.1 Renewable Power Demand .................................................................................. 6-1 6.2 Wind Resources Areas ......................................................................................... 6-3 6.3 Consequences of Delay ........................................................................................ 6-5 7.0 ESTIMATED COST OF THE PROJECT (ARSD 20:10:22:09) ......................... 7-1 8.0 GENERAL SITE AND PROJECT COMPONENT DESCRIPTION (ARSD 20:10:22:11, 20:10:22:33:02, 20:10:22:34) ...................................................... 8-1 8.1 Site Location and Overview................................................................................. 8-1 8.2 Wind Farm Facility .............................................................................................. 8-1 8.2.1 Turbines ................................................................................................ 8-3 8.2.2 Access Roads and Crane Paths ............................................................. 8-5 8.2.3 O&M Facility ........................................................................................ 8-5 8.2.4 Meteorological Towers ......................................................................... 8-6 8.2.5 Project Electrical System ...................................................................... 8-6 8.2.6 Switchyard ............................................................................................ 8-8 8.2.7 Construction and Operations................................................................. 8-9 Sweetland Wind Farm, LLC TOC-1 Burns & McDonnell Application for Facility Permit Table of Contents 8.3 Transmission Facility ......................................................................................... 8-10 8.3.1 Transmission Right-of-Way................................................................ 8-10 8.3.2 Configuration of Pole and Conductors ............................................... 8-12 8.3.3 Construction and Operations............................................................... 8-13 8.4 Temporary Laydown Yard ................................................................................. 8-16 9.0 ALTERNATE SITES AND SITING CRITERIA (ARSD 20:10:22:12) ................ 9-1 9.1 General Project Location Selection ..................................................................... 9-1 9.2 Site Configuration Alternatives ........................................................................... 9-2 9.3 Lack of Reliance on Eminent Domain Powers .................................................... 9-4 10.0 ENVIRONMENTAL INFORMATION (ARSD 20:10:22:13) ............................. 10-1 11.0 EFFECT ON PHYSICAL ENVIRONMENT (ARSD 20:10:22:14) .................... 11-1 11.1 Geological Resources......................................................................................... 11-1 11.1.1 Existing Geological Resources ........................................................... 11-1 11.1.2 Geological Resources Impacts/Avoidance & Mitigation Measures ... 11-3 11.2 Soil Resources .................................................................................................... 11-4 11.2.1 Existing Soil Resources ...................................................................... 11-4 11.2.2 Soil Resources Impacts/Avoidance & Mitigation Measures .............. 11-8 12.0 EFFECT ON HYDROLOGY (ARSD 20:10:22:14, 20:10:22:15) ..................... 12-1 12.1 Groundwater Resources ..................................................................................... 12-1 12.1.1 Existing Groundwater Resources ........................................................ 12-1 12.1.2 Groundwater Resources Impacts/Avoidance & Mitigation Measures ............................................................................................. 12-2 12.2 Surface Water Resources ................................................................................... 12-3 12.2.1 Existing Surface Water Resources ...................................................... 12-3 12.2.2 Surface Water Resources Impacts/Avoidance & Mitigation Measures ............................................................................................. 12-4 12.3 Current and Planned Water Uses ....................................................................... 12-6 12.3.1 Current or Planned Water Use ............................................................ 12-6 12.3.2 Current or Planned Water Use Impacts/Avoidance & Mitigation Measures ............................................................................................. 12-6 13.0 EFFECT ON TERRESTRIAL ECOSYSTEMS (ARSD 20:10:22:16) .............. 13-1 13.1 Vegetation .......................................................................................................... 13-1 13.1.1 Existing Vegetation ............................................................................. 13-1 13.1.2 Vegetation Impacts/Avoidance & Mitigation Measures..................... 13-3 13.2 Wildlife .............................................................................................................. 13-5 13.2.1 Existing Wildlife ................................................................................. 13-5 13.2.2 Wildlife Impacts/Avoidance & Mitigation Measures ....................... 13-13 13.3 Wetlands and Waterbodies .............................................................................. 13-18 13.3.1 Existing Wetlands and Waterbodies ................................................. 13-18 Sweetland Wind Farm, LLC TOC-2 Burns & McDonnell Application for Facility Permit Table of Contents 13.3.2 Wetland and Waterbody Impacts/Avoidance & Mitigation Measures ........................................................................................... 13-19 14.0 EFFECT ON AQUATIC ECOSYSTEMS (ARSD 20:10:22:17) ....................... 14-1 14.1 Existing Aquatic Ecosystems ............................................................................. 14-1 14.2 Aquatic Ecosystems Impacts/Avoidance & Mitigation Measures..................... 14-1 14.2.1 Wind Farm .......................................................................................... 14-1 14.2.2 Transmission Facility .......................................................................... 14-2 15.0 LAND USE (ARSD 20:10:22:18) .................................................................... 15-1 15.1 Land Use ............................................................................................................ 15-1 15.1.1 Existing Land Use ............................................................................... 15-1 15.1.2 Land Use Impacts/Avoidance & Mitigation Measures ....................... 15-2 15.2 Public Lands and Facilities ................................................................................ 15-4 15.2.1 Existing Public Lands and Facilities ................................................... 15-4 15.2.2 Public Lands and Facilities Impacts/Avoidance & Mitigation Measures ............................................................................................. 15-5 15.3 Sound ................................................................................................................. 15-5 15.3.1 Existing Sound ...................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    182 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us