Saudi Arabia National Renewable Energy Program

Saudi Arabia National Renewable Energy Program

Saudi Arabia National Renewable 1 Energy Program Saudi Arabia significantly increased its renewable energy targets and long term visibility Planned Capacity (GW) 5-Year Target 12-Year Target 58.7 Increased 2.7 CSP 5-Year Target 16.0 Wind Extended visibility 2 to 2030 27.3 7.0 Optimized 40.0 Solar PV the energy mix 9.5 20.0 2.4 Manufacturing 5.9 capacity of 200GW by Initial Revised 2030 Target 2030 12 pre-developed projects will be tendered in 2019 with a total capacity of ~3.1 GW Qurrayat Alfaisalia Saad Wadi Adwawser Yanbu TOTAL 200 600 600 70 850 Madinah Rabigh Alras Qurrayat 50 300 300 40 3 2,225 Rafha Jeddah 45 300 Mahad Dahab 850 20 Projects will be deployed in 35+ parks spread across the Kingdom Waad Al Shammal Qurayyat Tabarjal Rafha 35+ parks Sakaka North Tabuk Al Kahafah to be developed by 2030 Tabuk Midyan Qaisumah Al Masa'a Sourah Al Ghat Unaizah Sudair Spread across Al-Ula Ar Rass Shaqra Malham 4 Henakiyah Dhurma Ghilanah the Kingdom to promote Yanbu Khushaybi Tuwaiq Riyadh Al Haeer South Yanbu Madinah AlQuwaiiyah regional development Mastoorah Mahd Aldhab Duwadimi Rabigh Dhahban Starah Al-Kharj South Jeddah Al Faisaliah Haden Layla Al Laith Gradual deployment Bisha Wadi Ad Dawasir to mitigate technology risk Jazan Solar PV Farasan Sharorah Wind CSP What is Pre-Development? Site Selection Pre-development activities provide certainty and deliver lower project costs Energy Yield Grid Impact Assessment Studies Preliminary Pree-- Secure Design Input to tender DDeveellooppmmenetn Land 5 t AAccttivivitiiteises Reduced risk Successful IPP Hydrological Measure Assessment Resource Lower LCoE Geotech. Environmental Assessment Assessment Framework for Developing Tendering Policies Qualification RFP Evaluation Award 6 • Technical and • Local Content • Public bid • Short listing and financial criteria requirements announcements than award. No • Prescriptive technical • RFP compliance and alternative bids parameters of the than lowest LCOEE or negotiations plants (location, size, technology) • Bank Guarantees, EPC term sheets, O&M term sheets, financial model Saudi Arabia Localization Objectives Global Local Content Benchmarks Bubble size - Installed Renewable Energy Capacity (GW): <10 GW 10-100 GW >100 GW MEIM and PIF are working on complementary tracks to promote localization of manufacturing Development Allocated Pipeline Track Objectives Approach (% of RE Capacity) • Enable price discovery Tendered • Competitive tender • Attract private investments by REPDO 30% 9 • Increasing local content • Promote market innovation requirements • Negotiated deal with international • Fast-track localization Awarded partner for project development • Target exports of RE equipment to PIF • Captive offtake from large scale 70% manufacturing (200 GW) • Develop Giga-scale projects What Do We Want from Local Content High Short-term Technology: Inverter Nacelle localization target Assembly Assembly Wind Tower Solar Hub Assembly GDP Impact: Rotor Medium-term Blades 10 Long term cost localization target 50 Mn SAR / GW competitiveness Module Long-term localization target Cells Nacelle Polysilicon Housing Nacelle Electrical** Drivetrain Wafer Drivetrain Others* Gearbox Low Low Ease of Localization High Notes: *) Rotor Bearings, Break System, and Main Shaft; **) Power Converter, Transformers, and Fiber-optic Cables What Do We Want from Local Content Competitive and Sustainable Industry Value Localization Strategy Approach • Promote Factory localization • Expect Development of Supply Chain $15.000 Assembling Nacelle in the Country 11 $120.000 Main System Level (Generator, Gearbox, Transformer…) $300.000 Main Subsystem Level Level (Rotor, Stator…) $15.000 Subassembly Level $1.500.00 Individual Component Level (Bolts & Nuts) Captured Value Pyramid Local Content Roadmap Short Term (2017) Medium Term (2018-2019) Long Term (2020 onwards) LCOE Baseline Local Content Buildup Global Competitiveness Tendering guidelines & Tenders designed to Tenders support set up processes established drive local content of export capabilities 12 Introductory Aggressive capacity Stable development to capacity of 700 MW scale-up install 2030 targets Established LCOE Balanced LCOE and Balanced LCOE and price baseline Local Content Local Content Kick-start RE supply Setup of solar and wind Sustainable and export chain development industrial clusters oriented RE supply chain Localization Localization Localization 30% 40% - 60% 60%+ SAK & DAJ Source: Team Analysis .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us