Thailand's Transport Infrastructure Development Plans

Thailand's Transport Infrastructure Development Plans

Thailand’s Transport Infrastructure Development plans Mr. Chaiwat Thongkamkoon Director General, Office of Transport and Traffic Policy and Planning1 Thailand’s Transport Infrastructure Development Strategies 2015-2022 Plan 1: Intercity Rail Plan 2: Improving Plan 3: Enhancing Plan 4: Increasing Plan 5: Enhancing Networks Public Transport Connectivity between Water Transport Air Transport Development Networks & Services Key Domestic Network Capability Production Bases & Neighboring Countries 5.1 Airport 1.1 Tracking &Facilities 2.1 Implementation 4.1 Inland Port Capacity Expansion Improvement of 10 Metro Lines 3.1 Accessibility to Development Agricultural & Tourist Areas 5.2 Enhancement 4.2 Coastal Port 1.2 Dual Track 2.2 Construction of in Air Traffic Development Management Capability Development Roads & Bridges 3.2 Connectivity between Hub & Key Production Bases 5.3 Increased Fleet 2.3 Procurement of Utilization 3,183 NGV Buses and 3.3 Connectivity between Depots Gateways 5.4 Airฮ Transport Industrial Park 3.4 Promoting Seamless Multi-Modal Transport 5.5 Human Resource Development Enhancing operation and service transportation management 2 Plan 1: Intercity Rail Networks Development Existing Transport Network Future Transport Network ChiangKhong ChiangMai 8 Nongkai DenChai Udonthani Nakhon Panom Ban Dara Junction Tak 2 KhonKean 1 Phichit 2 Ban Phai Nakhon Sawan Bua Yai Junction 4 Jira Junction Ubonratchathani Lopburi 5 Kaeng Khoi Junction Suphan Buri Ban Phachi Junction 3 Khlong 19 Junction 1 Nakhon Pathom 1 Aranyaprathet BKK Chachoengsao Laem Junction Phetchaburi Chabang 6 7 Rayong Hua Hin Prachuap Kriri Khan7 3 Chumphon Ranong 4 Surat Thani Nakhon Si Thammarat 5 Phuket Trang HatYai Pattani Padang Besar 6 2 3 Existing Railway Network Single 3,675 km Double 252 km (Lop Buri-Ban Pachi / Kaeng Khoi-Ban Phachi/Nakhon Pathom- BKK/BKK-Rangsit) Triple 107 km Existing Railway Network (Rangsit-Ban Phachi Junction/Hua Mak- Chachoengsao) Total 4,034 km 4 Future Railways 2,992 km. (Double Track Project) ChiangKhong Completion km ChiangMai Chachoengsao-Khlong19 - Kaeng Khoi 2019 106 8 Double Track = 80.9% of the Total Immediate Jira Junction - Khon Kean 2019 185 Nongkai DenChai Phase Prachuap Kiri Khan - Chumphon 2020 167 7 sections Udonthani Nakhon Panom Lopburi - Pak Nam Pho 2020 148 Ban Dara Junction 993 km Tak 2 132 Mab Kabao - Jira Junction 2020 KhonKean 1 Phichit Nakhon Pathom - Hua Hin 2020 165 2 Ban Phai Hua Hin - Prachuap Kiri Khan 2020 90 Nakhon Sawan Bua Yai Junction 4 Jira Junction 5 Ubonratchathani Lopburi Kaeng Khoi Junction 3 Suphan Buri Ban Phachi Junction Khlong 19 Junction 1 Nakhon Pathom 1 Aranyaprathet BKK Chachoengsao Khon Kean - Nong Kai 2024 174 Laem Junction Phetchaburi Chabang Medium Phase Chumphon - Surat Thani 2024 167 6 7 Rayong 8 sections Pak Nam Pho - Den Chai 2025 285 Hua Hin 7 1,609 km Jira Junction - Ubonratchathani 2025 309 Prachuap Kriri Khan 48 Hat Yai - Padang Besar 2025 3 2025 70 Sriracha - Map Ta Phut Chumphon Surat Thani - Hat Yai-Song Kha 2026 339 Ranong 4 Den Chai - Chiang Mai 2029 217 Surat Thani New Double Track 14 Lines 2,352 km Nakhon Si Thammarat Immediate Phase 3 sections 839 km 5 ( ) Klong19 - Aranyaprathet Phuket 2030 174 Medium Phase 4 sections (642 km) Long term Trang Plan Hat Yai - Junction-Sungai Kolok HatYai - 216 Pattani Long Term Plan 7 sections (871 km) Padang 2 sections Besar 6 390 km 2 5 High Speed Rail Development Plan Chiang Mai Nong Khai 2 Phitsanulok Immediate Phase 4 sections 1,248 km 3 2017-2021 •1 Bangkok-Nakhon Ratchasima (253 km) 4 Nakhon •2 Bangkok-Rayong (260 km) Ratchasima Phase 1 Three Airports Seamless Connections 220 km 1 Phase 2 U Ta pao-Rayong 40 km BKK •3 Bangkok-Phitsanulok (380 km) 2 1 •4 Nakhon Ratchasima-Nong Khai (355 km) Rayong Hua Hin Medium Phase 2 sections 499 km 2022-2026 •1 Bangkok-Hua Hin (211 km) 1 •2 Phitsanulok-Chiang Mai (288 km) Surat Thani Long Term Plan 2 sections 759 km 2026-2027 •1 Hua Hin-Surat Thani (424 km) 2 •2 Surat Thani-Padang Besar (335 km) Padang Besar 6 Plan 2: Mass Rapid Transit Network Thammasat University Rangsit Campus –Maha Chai (80.8 km) Khae Rai-Minburi (36 km) Taling Chan-TH Cultural Bang Yai-Rat Centre-Minburi (37.5 km) Burana (42.8 km) ARL Donmuang- Suvarnabhumi (50.3 km) Salaya-Siriraj-Hua Mak (58.5km) Lat Phrao- Bang Sue-Hua Lamphong- Yot Se-Bang Wa Samrong (30.4 km) Tha Phra-Phutthamonthon (15.5 km) Sai 4 (55 km) Lam Luk Ka-Bang Pu (66.5 km) 10 Metro lines with total length 473.3 km 7 Plan 3: Enhancing Connectivity between Key Domestic Production Bases & Neighboring Countries Improvement of road and highway network linking key agricultural area and tourist attraction will enhance connectivity and accessibility of main production areas. 3.1 Accessibility to 3 Motorway routes: Agricultural & Tourist Areas • Pattaya- Mab Taphut, • Bang Pa-in-Nakhon Ratchasima 3.2 Connectivity between Hub & Key Production Bases • Bang Yai-Kanchanaburi 4 lanes highway development connecting 3.3 Connectivity between major cities supporting agricultural, Gateways tourist areas, and Special Economic Zones (SEZ) 3.4 Promoting Seamless Multi-Modal Transport 8 Plan 4 : Increasing Water Transport Network Laem Chabang Phase III China Myanmar Vietnam Bangkok 1 2 Laos Bangkok Port Maptaphut port SRTO Terminal A Thailand Ko sichang anchorage area Cambodia Laemchabang Port Thathong Pier Ranong Samui, Surat Thani Province Port Donsak Pier Phuket Port Chiang Saen Port 1 Krabi Province Chiang Khong Port Kantang Songkhla Port 2 Pier The development of coastal ports is intended to provide an alternative mode of transport that is both economical and environmentally friendly. 9 Plan 5 : Enhancing Air Transport Capacity Pushing forward the development of major airports as gateways will improve connection to other countries. Runway & SAT Mae Sot Sakon Nakorn • Suvarnabhumi International Airport Runway Expansion Suvarnabhumi • Don Muang International Airport Bangkok • Mae Sot Airport Samut Prakan U-Tapao Chonburi • Bae Tong Airport Don Mueang • Sakon Nakhon Airport • U-Tapao International Airport Passenger Terminal Betong 10 (Draft) 20 Years Thailand Transport System Development Strategy 2018-2037 - Green & Safe transport - Use of clean/alternative fuels Green & Safe Transport Innovation & - Access to transport services with affordability - Improved transport & logistics efficiency Management - Reduced transport & logistics costs & equity - Development of domestic & - Universal design & service design international transport connectivity Transport Inclusivity Efficiency 11 (Draft) 20 Years Thailand Transport System Development Strategy 2018-2037 Strategy 1 Integrated Transport Systems: Connectivity, Accessibility, Mobility Strategy 2 Transport Services: Safety, Reliability Strategy 3 Regulations & Institution: Transparency, Equity, PPP Strategy 4 Human Resource Development: World-Class Standard Strategy 5 Technology & Innovation: Research and Development (R&D) 12 Ministry of Transport Thank you https://www.otp.go.th 13.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us