National Highway Authority

National Highway Authority

GOVERNMENT OF PAKISTAN MINISTRY OF COMMUNICATIONS NATIONAL HIGHWAY AUTHORITY RE-INVITATION FOR BIDS (RIFB) ROUTINE MAINTENANCE WORKS (F.Y. 2018-19) OF PUNJAB-NORTH REGION 1. National Highway Authority (NHA) invites sealed bids from eligible bidders who can prove their eligibility and qualification as mentioned in the Bidding Documents to execute the following Routine Maintenance Works. The estimated cost and other briefs are as under: Financial Route Location Estimated Sr. Thresholds Completion CSR 2014, Contract No. (NBC& Cost Bid Security # Length Required Period District SBC) KM KM (Rs.) (KM) (Rs. Millions) 20.700+ 2% of Engineer’s Cash Flow = 05 1 RM-PN-18-05-01 N-5 1099+300 1120+000 Sahiwal 18,058,700 01 Year Sahiwal Estimate Turn Over = 28 Bypass 29.200+ 2% of Engineer’s Cash Flow = 04 2 RM-PN-18-05-02 N-5 1120+000 1149+200 Okara 16,839,350 01 Year Okara Estimate Turn Over = 25 Bypass 28.100+ Renala & 2% of Engineer’s Cash Flow = 04 3 RM-PN-18-05-03 N-5 1149+200 1177+300 17,522,450 01 Year Okara Habibabad Estimate Turn Over = 26 Bypass 24.000+ 2% of Engineer’s Cash Flow = 04 4 RM-PN-18-05-04 N-5 1177+300 1201+300 Pattoki 16,635,300 01 Year Kasur Estimate Turn Over = 24 Bypass 20.200+ Phool Nagar 2% of Engineer’s Cash Flow = 04 5 RM-PN-18-05-05 N-5 1201+300 1221+500 15,608,450 01 Year Kasur & Manga Estimate Turn Over = 23 Bypass 2% of Engineer’s Cash Flow = 04 6 RM-PN-18-05-06 N-5 1221+500 1245+000 23.500 16,009,950 01 Year Lahore Estimate Turn Over = 24 Chund 2% of Engineer’s Cash Flow = 02 7 RM-PN-18-CB-07 0+000 5+600 5.600 6,228,750 01 Year Jhang Bridge Estimate Turn Over = 09 2% of Engineer’s Cash Flow = 06 8 RM-PN-18-05-08 N-5 1266+800 1283+000 16.200 22,206,250 01 Year Sheikhupura Estimate Turn Over = 33 2% of Engineer’s Cash Flow = 05 9 RM-PN-18-05-09 N-5 1283+000 1300+000 17.000 18,062,000 01 Year Sheikhupura Estimate Turn Over = 27 2% of Engineer’s Cash Flow = 04 10 RM-PN-18-05-10 N-5 1300+000 1320+000 20.000 16,996,100 01 Year Gujranwala Estimate Turn Over = 25 2% of Engineer’s Cash Flow = 03 11 RM-PN-18-05-11 N-5 1320+000 1336+000 16.000 11,020,900 01 Year Gujranwala Estimate Turn Over = 17 2% of Engineer’s Cash Flow = 02 12 RM-PN-18-05-12 N-5 1336+000 1354+000 18.000 7,748,950 01 Year Gujranwala Estimate Turn Over = 12 2% of Engineer’s Cash Flow = 04 13 RM-PN-18-05-13 N-5 1354+000 1370+000 16.000 14,631,650 01 Year Gujranwala Estimate Turn Over = 22 2% of Engineer’s Cash Flow = 04 14 RM-PN-18-05-14 N-5 1370+000 1385+000 15.000 15,163,500 01 Year Gujrat Estimate Turn Over = 23 2% of Engineer’s Cash Flow = 03 15 RM-PN-18-05-15 N-5 1385+000 1400+000 15.000 12,632,400 01 Year Gujrat Estimate Turn Over = 19 2% of Engineer’s Cash Flow = 01 16 RM-PN-18-05-16 N-5 1400+000 1415+000 15.000 3,418,250 01 Year Gujrat Estimate Turn Over = 05 2% of Engineer’s Cash Flow = 03 17 RM-PN-18-05-17 N-5 1415+000 1430+000 15.000 13,900,700 01 Year Gujrat Estimate Turn Over = 21 2% of Engineer’s Cash Flow = 03 18 RM-PN-18-05-18 N-5 1430+000 1445+000 15.000 10,123,300 01 Year Gujrat Estimate Turn Over = 15 2% of Engineer’s Cash Flow = 03 19 RM-PN-18-05-19 N-5 1445+000 1462+000 17.000 10,470,350 01 Year Jhelum Estimate Turn Over = 15 2% of Engineer’s Cash Flow = 03 20 RM-PN-18-05-20 N-5 1462+000 1482+000 20.000 12,095,600 01 Year Jhelum Estimate Turn Over = 18 2% of Engineer’s Cash Flow = 03 21 RM-PN-18-05-21 N-5 1482+000 1510+000 28.000 12,199,550 01 Year Rawalpindi Estimate Turn Over = 18 2% of Engineer’s Cash Flow = 02 22 RM-PN-18-05-22 N-5 1510+000 1530+000 20.000 9,532,600 01 Year Rawalpindi Estimate Turn Over = 14 Financial Route Location Estimated Sr. Thresholds Completion CSR 2014, Contract No. (NBC& Cost Bid Security # Length Required Period District SBC) KM KM (Rs.) (KM) (Rs. Millions) 2% of Engineer’s Cash Flow = 02 23 RM-PN-18-05-23 N-5 1530+000 1544+000 14.000 8,221,400 01 Year Rawalpindi Estimate Turn Over = 12 2% of Engineer’s Cash Flow = 03 24 RM-PN-18-05-24 N-5 1544+000 1560+000 16.000 13,564,650 01 Year Rawalpindi Estimate Turn Over = 20 2% of Engineer’s Cash Flow = 04 25 RM-PN-18-05-25 N-5 1560+000 1580+000 20.000 14,184,500 01 Year Rawalpindi Estimate Turn Over = 21 2% of Engineer’s Cash Flow = 04 26 RM-PN-18-05-26 N-5 1580+000 1600+000 20.000 14,200,450 01 Year Attock Estimate Turn Over = 21 2% of Engineer’s Cash Flow = 03 27 RM-PN-18-05-27 N-5 1600+000 1615+000 15.000 13,552,550 01 Year Attock Estimate Turn Over = 20 2% of Engineer’s Cash Flow = 03 28 RM-PN-18-05-28 N-5 1615+000 1630+000 15.000 12,465,200 01 Year Attock Estimate Turn Over = 19 2% of Engineer’s Cash Flow = 02 29 RM-PN-18-80-29 N-80 0+000 35+000 35.000 6,959,700 01 Year Attock Estimate Turn Over = 11 2% of Engineer’s Cash Flow = 02 30 RM-PN-18-80-30 N-80 35+000 75+000 40.000 7,229,750 01 Year Attock Estimate Turn Over = 11 2% of Engineer’s Cash Flow = 02 31 RM-PN-18-80-31 N-80 75+000 108+000 33.000 8,566,250 01 Year Attock Estimate Turn Over = 13 2. Bidding will be carried out by adopting “Single Stage Two Envelops” procedure. Bidders are required to be registered with Pakistan Engineering Council with a valid registration Certificate in Category C-5 or above for the year 2019 (Attested Copy of PEC receipt for renewal of constructor licence for 2019 is also admissible) having specialization Code CE-01 & CE-10. 3. Bidders can download bidding documents from NHA website. The bidders are advised to visit the site before submission of bids. Bids shall be received in NHA Regional Office Conference Room, Lahore on 08th October, 2019 until 1100 hours. Bidders’ representatives would be required to present the “Authority to submit the Bid” while submitting the bids. The envelope containing ‘Technical Bid’ will be opened on the same day at 1130 hours in the presence of bidders or their authorized representatives who may choose to attend. Second envelope containing “Financial Bid” of technically qualified bidder(s) will be opened later, the date of which will be communicated after evaluation of the Technical Bids. 4. Bid security of an amount (2% of Engineer’s Estimate) in favour of “National Highway Authority Retention Money Account”, in the form and validity as mentioned in the bidding documents, must be accompanied with ‘Technical Bid”. 5. Bidders representatives would be required to present the “Authority to Submit the Bid” while submitting the bids, if failed to provide Authority Letter, their bids will not be considered. The Bidders will provide the No Litigation Certificate on judicial stamp paper or information about any litigation along with Technical Bids. Audit Reports of Last three (03) years by chartered accountant firm must to be provided with technical bids as per standard format. Required machinery and technical staff /undertaking must be provided on judicial stamp papers along technical bids indicating the contract title. 6. All the bidders must read the Instructions to bidder (ITB) carefully and fulfil the criteria given in Bidding Document’s i.e “Bidding Data Sheet”. 7. The firms providing unsubstantiated and / or incorrect information are liable to disqualification and /or legal action. Unsatisfactory performance of the firm in its previous work/works will also be a sufficient ground for disqualification. NHA reserves the right to reject all bids as per the PPRA Rule No. 33(1). GM (Maintenance) Punjab-North National Highway Authority Shahpur Interchange, Tohkar Niaz Baig Multan Road Lahore Ph: 042-99232556, Fax:042-99232557 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us