Stage 4: Aurora 5 Site - 24 Hour Testing 14

Stage 4: Aurora 5 Site - 24 Hour Testing 14

Stage 4: Aurora 5 Site - 24 Hour Testing 14 14 Stage 5: Recommend a Preferred Solution 15 •Rehabilitate Aurora Well No. 5, Aurora Well No. 6 and Newmarket Well No. 15 •Construct new wells at: • Green Lane • Aurora Well No. 5 19 Stage 6: Confirm Preferred Solution – Green Lane 16 Green Lane Well Construction: • Aquifer Thickness – 31 m • Transmitting Capacity – 104 L/s • Available Drawdown – 33 m • Completion Date – July 27th, 2016 • Diameter – 0.30 m (12”) • Step Test – July 28, 2016 • Depth – 93 m • 72 hour Test - August 2-5, 2016 • Screen Length – 10.7 m Parameter Step-Test 72 Hour Test Pumping Rate 18/36/55 55 (L/s) Drawdown (m) 0.14/0.37/0.77 3.8 Specific Capacity 71 (at 55 L/s) 15 (L/s/m) Water Quality Hardness and iron Hardness and iron Results above ODWQS above ODWQS 19 Stage 6: Confirm Preferred Solution - Green Lane 17 Monitoring Wells 17 Stage 6: Confirm Preferred Solution - Aurora 18 Aurora Well Construction: • Aquifer Thickness – 30 m • Completion Date – September 7th, • Available Drawdown – 45 m 2016 • Diameter – 0.30 m (12”) • Step Test – September 7, 2016 • Depth – 97.5 m • 72 hour Test – Sept 12-15, 2016 • Screen Length – 7.9 m (underway) • Transmitting Capacity – 75 L/s Parameter Step-Test 72 Hour Test Pumping Rate (L/s) 20/40/55 55 Drawdown (m) 0.45/0.95/1.51 TBD Specific Capacity 36 (at 55 L/s) TBD (L/s/m) Water Quality TBD TBD Results 19 Stage 6: Confirm Preferred Solution – Aurora 19 Monitoring Wells 19 LSRCA Regulation Area – Green Lane 20 19 LSRCA Regulation Area – Aurora 5 21 19 Source Water Protection 22 •Class EA Requirements (2014 Amendments): Clean Water Act and Source Protection Plans • Includes additional references to the Clean Water Act and Source Protection Plans • Class EA amendments serve as a reminder to consider source water protection as part of proponent’s decision making process •MOECC Consultation: • To include in Project File: • Section on Source Protection • Summary on preliminary consultation with stakeholders • Preliminary WHPAs consultation with Local Municipalities • Work plan • Letter from Source Protection Authority to support the work plan 19 Source Water Protection 23 •York Region’s Work Plan • To complete prior to the new wells becoming part of YR Water system • Review and Update Groundwater Flow Model • Delineate WHPAs • Vulnerability Scoring • Assessment and Mapping of Aquifer Vulnerability in WHPAs • Assignment and Mapping of Vulnerability Scores • Analysis and Rating of Uncertainty • Threats Assessment and Verification • Mapping and updates to Regional Official Plan • Source Protection Plan update • Public Consultation 23 Wellhead Protection Area (preliminary) – Green Lane 24 24 Wellhead Protection Area (preliminary) – Aurora 5 25 25 Key Dates 26 York Region will conduct Stage 2 Comments received tonight will Archaeological Assessments at be considered together with the the Preferred1 Well Sites to results of Stage 5 to confirm 2 the 3 identify the presence of Preferred Well Site(s). Please provide agency archaeological resources,Notice if any. of Completion: Public Review Period: comments by: November 3, 2016 November 3 to September 30, 2016 December 5, 2016 20 From: Shelly Cuddy [mailto:[email protected]] Sent: Tuesday, November 22, 2016 12:18 PM To: Cushing, Julia; Melinda Bessey; Charles Burgess Cc: [email protected]; Alexander, Matthew (Guelph); Quackenbush, Patricia Subject: RE: Yonge Street Aquifer: DRAFT Project File for LSRCA Review Hi Julia, Thank you for giving us the opportunity to comment on the Yonge Street Aquifer Well Supply Restoration project. I went through the report in some detail and have reviewed the preferred options. At this time I do not have any concerns regarding the 2 proposed water supply wells. It was noted that the technical report will be provided within the appendix so my review did not include the hydrogeological assessment. However, given the location of the proposed wells and the PTTW will not be increasing I don’t anticipate that the conservation authority will have any concerns. Please note that Melinda is currently out of the office and she has not reviewed the report. Melinda will be able to answer any planning or permitting questions you may have. Thanks Shelly Cuddy, P.Geo. Hydrogeologist Lake Simcoe Region Conservation Authority 120 Bayview Parkway, Newmarket, Ontario L3Y 3W3 905-895-1281, ext. 313 | 1-800-465-0437 | [email protected] | www.LSRCA.on.ca The information in this message (including attachments) is directed in confidence solely to the person(s) named above and may not be otherwise distributed, copied or disclosed. The message may contain information that is privileged, confidential and exempt from disclosure under the Municipal Freedom of Information and Protection of Privacy Act and by the Personal Information Protection Electronic Documents Act. If you have received this message in error, please notify the sender immediately and delete the message without making a copy. Thank you. From: Cushing, Julia [mailto:[email protected]] Sent: November-16-16 12:28 PM To: Melinda Bessey; Shelly Cuddy; Charles Burgess Cc: [email protected]; Alexander, Matthew (Guelph); Quackenbush, Patricia Subject: RE: Yonge Street Aquifer: DRAFT Project File for LSRCA Review Hi Shelley, Thanks for the call today – here is the link to the document: This file will be available for download until 11/23/2016 File Description Size YORK-5280711-v6-DRAFT Project File_2016_11_02.pdf 144,172KB We look forward to your comments early next week – please let us know if you would like to discuss or if you have any question as you complete your review. Regards, Julia Julia Cushing, MCIP, RPP Senior Environmental Planner D: 905-747-1922 (NEW) C: 416-528-5017 [email protected] AECOM 30 Leek Crescent, 4th Floor Richmond Hill, Ontario L4B 4N4 T: 905-882-4401 F: 905-882-4399 (NEW) www.aecom.com This communication is intended for the sole use of the person(s) to whom it is addressed and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted and all copies destroyed. Please consider the environment before printing this page. From: Cushing, Julia Sent: Wednesday, November 02, 2016 4:25 PM To: [email protected]; '[email protected]'; [email protected] Cc: [email protected]; Alexander, Matthew (Guelph); Quackenbush, Patricia Subject: Yonge Street Aquifer: DRAFT Project File for LSRCA Review Hello Melinda, Shelly and Charles, Please find, at the link below, the Draft Project File for the Yonge Street Aquifer Well Capacity Restoration Project. Melinda, as you may recall, we met about this Project on September 14, 2016 - this Project is being conducted in accordance with the Municipal Class Environmental Assessment Process for a Schedule B Project and the purpose is to restore the full permitted capacity of York Region’s wells within the Yonge Street Aquifer. The Preferred Solution involves rehabilitating four existing wells and constructing two new wells. The Draft Project File documents the studies conducted, the decision making process and consultation undertaken since the commencement of this project. The Draft Project File will be available for downloading until November 9, 2016. File Description Size YORK-5280711-v6-DRAFT Project File_2016_11_02.pdf 144,172KB Please let us know if you have any questions or comments. We ask that you provide us with your comments by November 16, 2016. Regards, Julia Julia Cushing, MCIP, RPP Senior Environmental Planner D: 905-747-1922 (NEW) C: 416-528-5017 [email protected] AECOM 30 Leek Crescent, 4th Floor Richmond Hill, Ontario L4B 4N4 T: 905-882-4401 F: 905-882-4399 (NEW) www.aecom.com This communication is intended for the sole use of the person(s) to whom it is addressed and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted H.8.4 MTCS Consultation Ministry of Tourism, Culture and Ministère du Tourisme, de la Culture et du Sport Sport Culture Programs Unit Unité des programmes culturels Programs and Services Branch Direction des programmes et des services Culture Division Division de culture 401 Bay Street, Suite 1700 401, rue Bay, bureau 1700 Toronto ON M7A 0A7 Toronto ON M7A 0A7 [email protected] [email protected] February 12, 2013 Jessica Marr Archeoworks Inc. 16715-12 Yonge Street, Suite #1029 Newmarket, Ontario L3X 1X4 RE: Entry into the Ontario Public Register of Archaeological Reports: Archaeological Assessment Report Entitled, “Stage 1 Archaeological Assessment (AA): Yonge Street Aquifer Well Capacity Restoration Environmental Assessment Township of East Gwillimbury And Township of Whitchurch Regional Municipality of York Ontario”, Dated January 17, 2013, Received by MTCS Toronto Office on February 4, 2013, MTCS Project Information Form Number P334-240-2012, MTCS File Number 19WT129 Dear Ms. Marr: The above-mentioned report, which has been submitted to this Ministry as a condit ion of licensing in accordance with Part VI of the Ontario Heritage Act, R.S.O. 1990, c 0.18 has been entered into the Ontario Public Register of Archaeological Reports without technical review.1 Please note that the ministry makes no representation or warranty as to the completeness, accuracy or quality of reports in the register. Should you require further information, please do not hesit ate to send y our inquiry to [email protected]. cc. Matt King, Brutto Consulting Jane Petlyarsky, Town of Richmond Hill 1In no way will the ministry be liable for any harm, damages, costs, expenses, losses, claims or actions that may result: (a) if the Report(s) or its recommendations are discovered to be inaccurate, incomplete, misleading or fraudulent; or (b) from the issuance of this letter.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    73 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us