Appendix A: Final List of Transportation

Appendix A: Final List of Transportation

Plan Bay Area Appendix A Final List of Transportation Projects/Programs by County As of May 7, 2012 (Amounts shown in millions of year-of-expenditure dollars) Total Project Committed Discretionary County RTP ID Project/Program Cost Funds Funds BAY AREA REGION/MULTI-COUNTY Bay Area Transportation for Livable Communitites (TLC) Program - Priority Development Area Region/Multi- 21011 (PDA) Planning Grants: provide planning funds to support transit-oriented $ 100 $ - $ 100 County development in PDAs Bay Area Region/Multi- 21012 Golden Gate Bridge Seismic Retrofit $ 700 $ 700 $ - County Bay Area Region/Multi- 21013 State-Owned Toll Bridge Rehabilitation/Replacement/Retrofit $ 1,620 $ 1,620 $ - County Small transit operators in Alameda, Contra Costa, Marin, Napa, Solano and Sonoma Bay Area counties - transit operating and capital improvement program (including replacement, Region/Multi- 21017 $ 9,037 $ 7,534 $ 935 rehabilitation and minor enhancements for rolling stock, equipment, fixed facilities and County other capital assets; does not include system expansion) Bay Area Golden Gate Bridge Moveable Median Barrier: installation of a moveable median Region/Multi- 21320 barrier on the Golden Gate Bridge to provide a physical separation between opposing $ 25 $ 25 $ - County directions of traffic Bay Area Implement Transbay Transit Center/Caltrain Downtown Extension (Phase 1 - Transbay Region/Multi- 21342 $ 1,589 $ 1,589 $ - Transit Center) County Bay Area Caltrain Service Frequency Improvements (6-Train Service during Peak Hours), Region/Multi- 21627 Electrification (San Francisco to Tamien), and Communications-Based Overlay Signal 1718 $ 1,046 $ 672 County System (CBOSS) and Positive Train Control System (PTC) Bay Area Implement Sonoma-Marin Area Rail Transit District (SMART) Commuter Rail and Multi- Region/Multi- 22001 $ 360 $ 360 $ - Use Pathway Project (Initial Operating Segment) County Bay Area Improve ferry facilities/equipment including the Downtown Ferry Terminal and Region/Multi- 22006 $ 193 $ 193 $ - procuring additional spare ferry vessels County Bay Area Fund Regional Measure 2 studies (Water Emergency Transportation Authority Region/Multi- 22241 $ 7 $ 7 $ - environmental studies, I-680/Pleasant Hill BART Connector Study) County Bay Area Fund Regional Measure 2 Express Bus North improvements (includes park-and-ride lots Region/Multi- 22243 $ 20 $ 20 $ - and rolling stock) County Bay Area Region/Multi- 22244 Fund City CarShare $ 5 $ 5 $ - County Bay Area Region/Multi- 22245 Fund Safe Routes to Transit $ 30 $ 30 $ - County Bay Area Lifeline Transportation Program: fund programs and services that address Region/Multi- 22423 809 $ - $ 809 transportation gaps specific to low-income communities County Bay Area Planning funds for the Metropolitan Transportation Commission, Association of Bay Region/Multi- 22425 Area Governments, Bay Conservation and Development Commission, and nine county $ 100 $ - $ 100 County congestion management agencies Bay Area Caltrain - transit operating and capital improvement program (including replacement, Region/Multi- 22481 rehabilitation and minor enhancements for rolling stock, equipment, fixed facilities and $ 7,667 $ 4,255 $ 1,120 County other capital assets); station improvements (e.g., platforrms) are included Bay Area Region/Multi- 22511 Provide ferry service between Berkeley/Albany and San Francisco $ 312 $ 312 $ - County Bay Area Region/Multi- 22636 Implement BART transbay tube earthquake safety improvements (Phase 1) $ 593 $ 593 $ - County Bay Area Region/Multi- 94089 Implement Presidio Parkway Project $ 2,053 $ 2,053 $ - County Page 1 of 23 Plan Bay Area Appendix A Final List of Transportation Projects/Programs by County As of May 7, 2012 (Amounts shown in millions of year-of-expenditure dollars) Total Project Committed Discretionary County RTP ID Project/Program Cost Funds Funds Bay Area Widen Route 12 (Jameson Canyon) from 2 lanes to 4 lanes from I-80 in Solano County Region/Multi- 94152 $ 140 $ 140 $ - to Route 29 in Napa County (Phase 1) County Bay Area BART - transit operating and capital improvement program (including replacement, Region/Multi- 94525 rehabilitation and minor enhancements, equipment, fixed facilities and other caital $ 43,516 $ 33,513 $ 4,457 County assets) Bay Area AC Transit - transit operating and capital improvement program (including Region/Multi- 94526 replacement, rehabilitation and minor enhancements for rolling stock, equipment, $ 15,926 $ 14,000 $ 172 County fixed facilities and other capital assets; does not include system eqpansion) Livermore Amador Valley Transit Authority (LAVTA) - transit operating and capital Bay Area improvement program (including replacement, rehabilitation and minor enhancements Region/Multi- 94527 $ 885 $ 685 $ 161 for rolling stock, equipment, fixed facilities and other capital assets; does not include County system expansion) Central Contra Costa Transit Authority (CCCTA) - transit operating and capital Bay Area improvement program (including replacement, rehabilitation and minor enhancements Region/Multi- 94558 $ 1,444 $ 1,401 $ - for rolling stock, equipment, fixed facilities and other capital assets; does not include County system expansion) Bay Area Golden Gate Transit - transit operating and capital improvement program (including Region/Multi- 94572 replacement, rehabilitation and minor enhancements for rolling stock, equipment, $ 4,240 $ 3,116 $ 681 County fixed facilities and other capital assets; does not include system expansion) Valley Transportation Authority (VTA) - transit operating and capital improvement Bay Area program (including replacement, rehabilitation and minor enhancements for rolling Region/Multi- 94610 $ 20,669 $ 20,669 $ - stock, equipment, fixed facilities and other capital assets; does not include system County expansion) San Francisco Municipal Transportation Agency (SFMTA) - transit operating and capital Bay Area improvement program (including replacement, rehabilitation and minor enhancements Region/Multi- 94636 $ 48,997 $ 42,139 $ 2,190 for rolling stock, equipment, fixed facilities and other capital assets; does not include County system expansion) Bay Area SamTrans - transit operating and capital improvement program (including Region/Multi- 94666 replacement, rehabilitation and minor enhancements for rolling stock, equipment, $ 7,535 $ 6,125 $ 744 County fixed facilities and other capital assets; does not include system expansion) Bay Area SolTrans - transit operating and capital improvement program (including replacement, Region/Multi- 94683 rehabilitation and minor enhancements for rolling stock, equipment, fixed facilities and $ 805 $ 594 $ - County other capital assets; does not include system expansion) Bay Area Implement I-80 Integrated Corridor Mobility (ICM) project operations and Region/Multi- 230221 $ 70 $ 70 $ - management County Bay Area Region/Multi- 230222 Implement San Pablo Avenue SMART Corridors operations and management $ 11 $ 11 $ - County Bay Area Implement Transbay Transit Center/Caltrain Downtown Extension (Phase 2 - Caltrain Region/Multi- 230290 $ 2,596 $ 639 $ 1,957 Downtown Extension) County Bay Area Region/Multi- 230336 Implement recommendations from MTC's Transit Connectivity Plan $ 10 $ 10 $ - County Freeway Performance Initiative (FPI): maximize performance and reliability using Bay Area technology and limited expansions at essential locations on freeways and major Region/Multi- 230419 $ 2,792 $ - $ 2,792 arterials; includes Traffic Operations System (TOS) infrastructure, TOS maintenance County and replacement, arterial coordination and management, and performance monitoring Bay Area Climate Policy Initiatives: fund initiatives that reduce greenhouse has emissions from Region/Multi- 230550 $ 700 $ - $ 700 cars and light duty trucks County Bay Area San Francisco Ferry Berthing Improvements Program (Phase 1): improvements to Region/Multi- 230581 existing ferry terminals and construction of new terminals to accommodate increases $ 33 $ 33 $ - County in ferry ridership Page 2 of 23 Plan Bay Area Appendix A Final List of Transportation Projects/Programs by County As of May 7, 2012 (Amounts shown in millions of year-of-expenditure dollars) Total Project Committed Discretionary County RTP ID Project/Program Cost Funds Funds Bay Area Conduct environmental and design studies related to implementing new ferry services Region/Multi- 230612 $ 2 $ 2 $ - in Antioch and Martinez County Bay Area Implement upgrades to Route 12 (Jameson Canyon) between Napa and Solano Region/Multi- 230627 $ 13 $ 13 $ - Counties (includes grade realignment and full safety barrier) County Bay Area Region/Multi- 230712 Golden Gate Bridge Suicide Barrier - project development $ 8 $ 8 $ - County Bay Area Implement station improvements along the Caltrain corridor associated with planned Region/Multi- 240019 transit-oriented development (includes parking, bus, shuttle and bicycle and pedestrian $ 220 $ 220 $ - County access improvements) Bay Area Implement system-wide access improvements at Caltrain stations associated with Region/Multi- 240031 increased service (includes parking, bus, shuttle and bicycle and pedestrian access $ 30 $ 30 $ - County improvements) Bay Area Caltrain South Terminal Track Capacity Expansion, Phase II and III - project Region/Multi- 240048 $ 16 $ 16 $ - development County Bay Area Region/Multi- 240140 Implement Caltrain at-grade crossing improvements $ 6 $ 6 $ - County Bay Area Priority Conservation Area (PCA) Program: provides funding to preserve open space Region/Multi-

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us