Erwconsulting Chartered Surveyors Property – Planning – Development -Consultancy ______

Erwconsulting Chartered Surveyors Property – Planning – Development -Consultancy ______

ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) LPA REF. 21C171 APPLICATION TO DISCHARGE CONDITION (09) Site – TYDDYN LLYWARCH LLANDDANIEL FAB ANGLESEY LL60 6EG SH 49758 70320 Development Project – CONVERSION OF OUTBUILDINGS TO 4NR DWELLINGS ETC, TOGETHER WITH IMPROVEMENT TO ACCESS Issued July 08, 2020 CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 1 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ THE APPROVED RED-LINED SITE PLAN - CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 2 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) GENERAL PROPOSALS - This CTMP supports the application to discharge pre-commencement condition (09) of the planning permission in respect of which we submit the proposals below. Its purpose and aim is to detail the requirements to be followed by all persons and companies visiting, travelling or delivering to the site. The guidance provides information on the safest and best practice procedure to follow when considering movements to and from the site by all construction related vehicles. Following the CTMP will help reduce the negative effects (if any) of off-site construction traffic on the local road network and the environment. The contents of this CTMP shall be communicated at these appropriate stages – * Sub-contractor Tender Enquiries * The Pre-Start Health, Safety and Environmental meetings * All site inductions will include a section on this CTMP * During on-going Toolbox Talks during the construction project Close contact will be maintained with immediate neighbours and representatives of the local community to deal with and dispose of any unexpected issues that may arise. Immediate neighbours will be provided with contact details of the Contract Director, Site Manager and Main Office in line with the Considerate Constructors Code of Considerate Practice. The nearest private dwelling is Tyddyn Llywarch farm house which is in the ownership of the Applicant, and is subject to a short term tenancy. The appointed Principal Contractor is Mr Darren Thomas but the precise method of working, programme of works and resources that the Contractor will employ is not yet certain however, as a guide, it is anticipated that the build will take approximately 6-9 months and a workforce of up to 10 persons could be on site at any one point. CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 3 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ Traffic generated during the construction stage will typically be a mix of cars, vans, with or without trailers, construction vehicles and lorries. The most intensive period of construction generated HGV traffic is expected to be the demolition and removal of redundant buildings, and concrete pour for new foundations and it is anticipated that max. 3nr loads of concrete will be required for the pouring operation. General materials will be delivered by Builders Merchants lorries and it is anticipated that this will not exceed 1nr principal delivery per day. CONTROL OF ACCESS - The following measures will be adopted to safely control access to the site and manage traffic movements – * All drivers must report to the Site Office upon arrival * All drivers must adhere to site signage and 10mph speed limit * Strictly no reversing shall occur without the presence of trained banksman * All drivers must wear full PPE when leaving their vehicle * Any lifting equipment must have relevant certification prior to use on site and documents must be inspected by the Site Manager. * Operatives must ensure that plant, machinery, cabins and containers are secured at the end of each working day and keys removed during meal breaks. * All vehicle drivers must ensure that their wheels are clean prior to entering the public highway. * Any members of the public attempting to enter the site with a query must be met and accompanied to the Site Manager’ office. TRAFFIC ROUTING – The site is accessed direct from the public highway. There is adequate space in the Applicant’s ownership within the site’s curtilage to allow HGV’s to enter, turn and re-enter the public highway in forward gear. The routing of all vehicles to the site of construction shall be either – CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 4 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ (1) the Gaerwen route – from the A5 Holyhead road at Gaerwen, by the unclassified road (with passing places) via Gaerwen Station, to Llanddaniel Fab, and beyond, to the site, or, (2) the Star route – from the A5 junction at Star along the unclassified road (with passing places) to Llanddaniel Fab and beyond, to the site. Subject to the highway authority being satisfied that no weight restriction applies to any bridges, both public routes to/from the A5 are considered safe and suitable for all vehicles, as shown in BLUE - The development is relatively minor, a conversion of a range of redundant buildings to 4nr dwellings, in a rural location. There is no expectation of TTMM’s or TRO’s, or out of gauge loads. The type, size and laden weight of construction and delivery vehicles (maximum typically Hogan’s and Huws Gray 4/6-wheel type HGV’s) are not expected to exceed 25 tons. CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 5 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ CONSTRUCTION LOGISTICS AND COMMUNITY SAFETY – The CLOCS standard (Version 2, January 2019) for construction logistics is a national industry standard which sets out a series of requirements for logistics operators designed to reduce the risk of collisions with vulnerable road users. The Principal Contractor will be required to implement the CLOCS standard by requiring that suppliers be a member of (or working towards membership) of recognised independent bodies such as – * Fleet Operator Recognition Scheme * Van Excellence CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 6 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ SITE SPECIFIC PROPOSALS - The specific requirements of condition (09), by numbers and reference to the following approved site plan are now addressed - 1. Using the existing field access (widened to 5m), for its better visibility (than the existing ‘farmyard access’) the parking of vehicles for development operatives and visitors shall be on-site in the area edged BLUE on the Plan. 2. The loading and unloading of plant and materials, and vehicle turning to enable exit in forward gear, shall be on-site in the area edged RED on the Plan. 3. The storage of plant and materials used in the construction shall also be in the area edged RED on the Plan. 4. The measure to be implemented to prevent mud and debris from contaminating the adjacent highway network shall be power-water hosing within the permeable area edged RED on the Plan. The area will be overlaid during construction with MoD aggregate to avoid mudding. CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 7 July 08, 2020 ERWCONSULTING CHARTERED SURVEYORS PROPERTY – PLANNING – DEVELOPMENT -CONSULTANCY _______________________________________ The condition of the highway leading to the site shall be continually monitored and man and brush road sweeping deployed if necessary to maintain the highway clear and safe. 5. Hours of working and the management and operation of construction and delivery vehicles shall be week-days 0800hrs-1700hrs and Saturday 0800hrs-1200hrs. RESPONSIBLE PERSONNEL – The personnel responsible for compliance shall be the appointed Contractor, who shall sign and date this CTMP where indicated below, and prominently display a copy in the Site Office. CTMP drafted by - ERWCONSULTING | CHARTERED SURVEYORS Issued July 08, 2020 CTMP read and signed in acceptance by the Principal Contactor – ____________________________________ Print name & address Mr Darren Thomas _________________________________ Date _________________________________ CONSTRUCTION TRAFFIC MANAGEMENT PLAN FOR TYDDYN LLYWARCH, LLANDDANIEL FAB 8 July 08, 2020 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us