MANTOVANI — MARINE, CIVIL AND INFRASTRUCTURAL CONSTRUCTION 1 MANTOVANI — MARINE, CIVIL AND INFRASTRUCTURAL CONSTRUCTION 2 3 Company Name Impresa di Costruzioni Ing. E. MANTOVANI SpA MANTOVANI Type Of Company Company Limited by Shares — Company Equity € 50.000.000,00 fully paid PROFESSIONALISM Nation Italy AND PROFICIENCY Registered Offices Viale Ancona 26 30172 Mestre-Venice — Administrative Offices Via Belgio 26 Zona Industriale Camin PROFESSIONALITÀ 35127 Padua T +39 049 7622611 E COMPETENZA F +39 049 8703345 [email protected] www.mantovani-group.it 4 5 MANTOVANI PROJECTS, PAST, MANTOVANI PROGETTI, STORIA, PRESENT AND FUTURE PRESENTE E FUTURO The Impresa di Costruzioni Ing. Mantovani L’Impresa di Costruzioni Ing. Mantovani dates back to 1949. During the first part nasce nel 1949. Nella prima parte of its history, it worked in the field of civil, della sua storia opera principalmente hydraulic and maritime engineering, nel campo dell’ingegneria civile, specialising in the construction of idraulica e marittima, specializzandosi largescale works. In 1987, after passing nella realizzazione di grandi opere. under the control of Serenissima Holding Con il passaggio al controllo da run by the Chiarotto family, the company parte di Serenissima Holding della grew rapidly, becoming one of Italy’s famiglia Chiarotto nel 1987, l’impresa leading 15 construction companies, è protagonista di una forte crescita che operating as a general contractor. la porta tra le prime 15 imprese leader in Italia nel settore delle costruzioni, In the beginning it specialised in the mercato all’interno del quale opera construction of roads, such as the historic come “general contractor”. Autostrada del Sole, later extending its core business to include engineering Inizialmente specializzata nella activities such as dredging, maritime realizzazione di opere stradali come and port engineering (Mose), roads (the la storica Autostrada del Sole, col tempo Mestre ring road), large high-technology ha ampliato il suo core business in structures (the Trento Proton Therapy attività ingegneristiche quali dragaggi, Centre and the Dell’Angelo Hospital, opere marittime e portuali (Mose), strade Mestre) and reclamation, restoration and (Passante di Mestre), grandi strutture recovery of polluted areas. ad alta tecnologia (Centro protonico di Trento,Ospedale dell’Angelo di Mestre), Since 2003, it has been involved in bonifiche, ripristino e recupero Venice in excavation work associated di aree inquinate. with construction of the Mose system to protect the Lagoon, while since August Dal 2003 è impegnata a Venezia in opere 2012 it has been present in Milan in di scavo riguardanti la realizzazione del preparation for Expo 2015 where it is sistema Mose per la salvaguardia della involved in construction of the exhibition Laguna, mentre da agosto 2012 si trova platform. This platform is where the a Milano in previsione di EXPO 2015, pavilions in which each country can show occupandosi della costruzione della off its values and strong points to the rest piastra espositiva. Su questa piattaforma of the world will be built. sorgono i padiglioni dove ogni Paese può mettere in mostra davanti al resto del Mantovani is also responsible for mondo i propri valori constructing the pavilions, employing e le proprie eccellenze. a team of more than 60 engineers and technicians together with hundreds of Mantovani si sta occupando anche della workers and subcontractors already realizzazione dei padiglioni, con una present on-site. Over the last five business squadra composta da più di 60 tecnici years, the company has achieved a e centinaia di lavoratori e subappaltatori turnover in excess of 2,140 million Euros già presenti in loco. Nell’ultimo in completed projects and has acquired a quinquennio l’Impresa ha raggiunto portfolio of new projects worth almost 3 un fatturato che supera i 2,140 milioni billion Euros. di euro di progetti conclusi ed ha ampliato il portfolio con circa 3 miliardi di euro di nuovi progetti. Entrance of headquarters Ing.Mantovani spa, Padua — Ingresso sede Ing.Mantovani spa, Padova — 6 7 CORPORATE ORGANIZATION CHART MANTOVANI MANAGEMENT IL MANAGEMENT DI MANTOVANI SERENISSIMA HOLDING SPA 100% 100% 100% 70% CORPORATE TECHNICAL MANAGEMENT MANAGEMENT FERRARI FIP INDUSTRIALE DOLOMITI ROCCE FIP ARTICOLI TECNICI ING. FERRUCCIO SRL SPA SRL SRL Chairman and CEO Technical Director Carmine Damiano Gianfranco Zoletto CEO Technical Director 100% 15,38% 100% Giampaolo Chiarotto Leopoldo Folegatti FIP CHEMICHALS CO.VE.LA FIP LA CEO Technical Director SRL SCARL SRL Paolo Dalla Via Cristian Gallo 100% CEO 84,62% Gianfranco Zoletto IMPRESA DI COSTRUZIONI MANTOVANI LE OPERE ING. E. MANTOVANI SPA PROJECTS IN DEVELOPMENT IN CUI È IMPEGNATA MANTOVANI • Expo 2015 Milano • Expo 2015 Milano • M.O.S.E. System - Lido Treporti • Sistema M.O.S.E. - Lido Treporti • M.O.S.E. System - Malamocco • Sistema M.O.S.E. - Malamocco 100% 55% 99,80% 100% • Venice Ro-Ro Terminal • Terminal Ro-Ro Venezia • Construction of a 3rd lane, • Costruzione 3° Corsia PALOMAR TRESSETRE VENICE CAMPUS VENICE GREEN A4 Venice-Trieste Motorway Autostrada A4 Venezia – Trieste SRL SCPA RE SCRL TERMINAL SRL 40% THE MANTOVANI’S LE PRINCIPALI MOST IMPORTANT PROJECTS OPERE GIÀ REALIZZATE 40% 100% 97,21% ALREADY REALIZED DA MANTOVANI LAGUNA CONCRETE 40% ALLES ADRIA 100% VENETO PASS • Dell’Angelo Hospital, Mestre (VE) • Ospedale dell’Angelo, Mestre (VE) SRL SPA INFRASTRUTTURE SPA SCPA • New Santi Gaetano e Camillo Hospital, • Nuovo Ospedale SS. Gaetano e Camillo, Santorso (VI) Santorso (VI) • Trento Proton Treatment Centre • Centro di Terapia Protonica di Trento • Regional Metropolitan Railway System • Sistema Ferroviario Metropolitano • Mestre ring road Regionale (SFMR) • Mestre trams • Passante di Mestre 100% 100% 79% 10% 100% • LNG pipeline terminal (Porto Levante • Tram di Mestre offshore regasification terminal - RO) • Terminal LNG Pipe line CRS HYDROSTUDIO VENICE RO PORT VENETO TLC • Mooring dolphin LNG terminal (terminal rigassificatore off shore SPA CONSULTING MOS SCPA SRL ENGINEERS SRL (Porto Levante offshore regasification di Porto Levante - RO) terminal - RO) • Terminal LNG Mooring Dolphin • P.I.F. (Progetto Integrato Fusina) Venice (terminal rigassificatore off shore • Vicenza south ring road di Porto Levante RO) • Restoration work theatre “La Fenice”, Venice • P.I.F. (Progetto Integrato Fusina) Venezia • Tangenziale sud di Vicenza • Restauro Teatro La Fenice, Venezia 8 9 MARINE, CIVIL AND INFRASTRUCTURAL COSTRUZIONI MARITTIME, CIVILI CONSTRUCTION E INFRASTRUTTURE REVENUE IN THE LAST FATTURATO DEGLI ULTIMI • Works to protect Venice • Opere per la salvaguardia FIVE BUSINESS YEARS CINQUE ANNI and its lagoon di Venezia e della laguna • Construction and installation • Costruzione e posa 2013 € 440.000.000,00 * of undersea pipelines di condotte sottomarine 2012 € 423.166.506,00 • Construction of port docks • Costruzione banchine and piers e moli portuali 2011 € 404.611.922,00 • Dredging, disposal • Dragaggi, refluimenti 2010 € 413.300.969,00 and nourishment works e ripascimenti 2009 € 403.708.055,00 • Restoration and reinforcement • Ristrutturazioni e messa of bridges, quay side in sicurezza di ponti, and embankments rive e canali • Civil construction projects • Progetti di ingegneria civile • Recovery, reclamation and • Recupero, riutilizzo restoration of polluted areas e ripristino di aree inquinate • Restoration, renovation • Restauro e ricostruzione and reconstruction of buildings di edifici e luoghi di valore and squares of historical and storico e artistico artistic value • Costruzione di autostrade • Construction of motorways e strade and roads • Costruzione di gallerie • Construction of tunnels • Costruzione di reti ferroviarie • Construction of metropolitan metropolitane railway networks • Realizzazione di siti espositivi • Construction of exhibition sites • Realizzazione di progetti • Advanced technology tecnologicamente avanzati construction projects * Provisional/provvisorio 10 11 MANTOVANI — AN HISTORY OF INNOVATION — UNA STORIA DI INNOVAZIONI 12 13 MARINE AND FLUVIAL CONSTRUCTION — OPERE MARITTIME E FLUVIALI 14 15 Client Ministry of Infrastructure MO.S.E. Cliente and Transport / Venice Water Authority, through SYSTEM its concessionary, the Consorzio Venezia Nuova SISTEMA Ministero delle Infrastrutture e dei Trasporti / Magistrato alle Acque di Venezia, per il MO.S.E. tramite del concessionario Consorzio Venezia Nuova Operational sector Maritime and river engineering Settore operativo Maritime infrastructure Special projects Opere marittime e fluviali Infrastrutture marittime Opere speciali Work’s amount € 5,493,000,000.00 Total Importo dei lavori The Mose project, the only one of its kind in the Il progetto Mose, opera unica al mondo nel suo world, involves implementing measures at the three genere, consiste nella realizzazione di interventi inlets to the Venice lagoon (Lido, Malamocco and alle tre bocche lagunari di Venezia (Lido, Malamocco Chioggia) with the aim of regulating tidal flows and e Chioggia) aventi l’obiettivo di regolare i flussi di protecting built-up areas from flooding during even marea e difendere i centri abitati dagli allagamenti exceptional high waters. durante gli episodi di acqua alta, compresi quelli eccezionali. The most characteristic features of these measures are the mobile barriers, each consisting of a Il loro elemento caratterizzante è rappresentato modular series of independent buoyancy gates dalle barriere mobili, ciascuna costituita da una installed end to end and
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages28 Page
-
File Size-