No.DlC/swcA/BD/1.A./Dabhota/- 22 3q Office of the Dy.Director of lndustries Single Window Clearance Agency, Baddi Distt.Solan H.P. Dated: A8)10)1, To ,,An.Nodal officer-cum-APCCF(FCA) "./ Office of Pr. CCF, H.P., Shimla-1. Subject:- Diversion of 38.7 ha. Of forest land in favor of Deputy Director of Industries for setting up of New lndustrialArea at village Dabhota, Tehsil Nalagarh, Distt. Solan, H.P. Sir, ln reference to your letter No. F|.48-281612014(FCA), dated 04.10.2014, on the subject quoted above vide which following shortcomings were shown and the same have been completed and enclosed herewith for taking further action in the matter please. S.No. Shorlcominq Remarks 1. ln the justification for locating the project in forest area, no Proper justification justification for locating this project on forest land has been report enclosed. given, only the justification for the project has been given. The requirement of this check list is why the project is to be located over the forest land and not on the other Pvt/non- forest land. Thus, proper justification for locating the project on forest land is required to be uploaded. 2. Detail of alternates examined to reduce the requirement of Detail of alternates forest land need to be provided. examined enclosed. 3. Although the component wise detail has been uploaded, but Dimensions of the dimensions of the project components are also required to project components uoloaded. enclosed. 4. Underlaking of the user agency to bear the cost of CA has not Undertaking of the been uploaded. user agency enclosed. 5. Undertaking of the user agency to pay the NPV of the forest Undeftaking to pay land proposed for diversion has not been uploaded. the NPV of the forest land enclosed. o. Undertaking to pay the additional amount of NPV if Undertaking to this determined by the Hon'ble Supreme Court has not been effect enclosed. uploaded. 7 The user agency will not provide non-forest land for CA, Certificate enclosed. hence a certificate of DC that no alternative suitable non forest land is available for CA ii also required to be obtained from DC concerned. (Anshul Dhiman) Dv.Dlrector of indrr:tries Silnele YinC;v Clralance AL: i(:i/ r,r-Nala Bali i -Barotir':-r 3arh Arca, D:;partment of IrrdusLries E"d.t N.. A{ drt't. iiiioi ni.tt. solau (u.P.) Full Title of the project: Establishment of new industrial area at village Dabhota, tehsil Nalagarh, district Solan. Himachal pradesh. File No; Date of proposal; JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA Department of Industries, Government of Himachal Pradesh has identified a patch of land measuring 38.7 hactares at village Dabhota, tehsil, Nalagarh, district Solan, forest Division Nalagarh, Himachal Pradesh for setting up of new industrial area. The identified patch of land is "Baraye Charand" and is a forest land. The acquisition of land for setting-up of industrial area is guided by many factors as enumerated under roads which can carry industrial traffic and ensure smooth and trouble free logistics. physically feasible and viable to create necessary infrastructure for industrial area such as internal roads, carving out of plots, sewerage system, water supply system, common infrastructure like facility centre, commercial complexes etc. encroachments, resettlement of dwellers etc. locations/area. industrialists. land. The identified patch of land fulfills all these criteria's. It is ideally located on Nalagarh- Bharatgarh road and is approximately 2 kms from 4-lane Chandigarh express highway and nearest railway station Bharatgarh is approximately 5 kames from this land. The land is topographically suitable from development point of view. It is economically feasible and viable to develop requisite infrastructure at reasonable cost in this land such as roads, plots, water supply system, sewerage system, common facility centre etc. Power is available in the vicinity of this area. The area is free from any other hindrances. There is no human population which is likely to be disturbed. Department of Industries has also made efforts to acquire private land at village Dabhota for industrial area. However, due to small landholdings, people were not willing to give their land and there was huge opposition from local population. Besides this, due to very high cost of acquisition of land, it was becoming unviable for the government to acquire the private land. A joint inspection committee comprising Sub-Divisional magistrate, D.F.O. Nalagarh and Deputy Director, industries, Baddi also inspected two alternate sites comprising khasra numbers T211,1197,1419, 1424,1490 were also inspected but were not found suitable from development point of view and hence were rejected. Besides this, areas in and around Baddi, Barotiwala and Nalagarh town have become congested due to heavy industrialization and there is heavy pressure on the infrastructure. Due to this, government is also willing to shift industrialization to new potential locations so as to promote planned industrialization and to ease out the pressure on the existing infrastructure. Therefore, location of the project in the forest area is fully.iustified in view of the factors as discussed above. lr (^,&k6niman) Deputy Director, Industries. Single Window Clearance Agency, Baddi. Distt. Solan. H.P. tehsil Nalagar:h, district Solan, Himachal Pradesh. File No.: Date of proposal: Detail of alternates examined to reduce the requirement of forest land need to be provided. It is certified that two other alternate sites at village Dabhota comprising Khasra No. 12L1, ttg7,1419,1,424,1490 were also inspected, but due to highly uneven topography and huge cost of development; ihese sites were rejected by the Joint lnspection Committee comprising Sub-Divisional Magistrate, Nalagarh, district Solan, D.F.O, Nalagarh and Dy. Director (lndustries), Single Window Clearance Agency, Baddi in the inspection conducted on 05.04.2014. (Anshul Dhiman) Dy. Director of lndustries, Baddi, Distt. Solan Himachal Pradesh. HP-,J1*:1.fifti#lrffi i?tu'r""tl t"H"i*t:i FullTitle of the proiect: Establishment of new lndustrialarea at village Dabhota, tehsil Nalagar'h, district Solan, Himachal Pradesh. File No.: Date of proposal: 1. PLOTS Block Plots Nos. Total No. of plots Width x Length Area A 1-to 12 12 25x40 12000.00 B 13lo 24 12 25x40 12000.00 c 25to 32 8 30x66.66 16000.00 33 1, (65+15)/2x66.56 2566.00 43 1 (70+86)/2 x 50 3900.00 44 1 (86+100)/2x50 46s0.00 D 45&46 2 50x100 10000.00 47 t 49.71x(100+75)/2 43s0.00 48 1 7ox(75+41)/2 4060.00 D2 49 t 74.84x55/2 20s8.00 5x55+45/2 2s0.00 21,x45+55/2 1050.00 7x54+50/2 364.00 50 ,J, 68.92x50+15/2 2240.O0 51 L 31,.55x45+82/2 4810.00 14.2Ox82 36.80x82+33/2 G 52 to 55 4 30x66.66 8000.00 56 L 22x66+63/2 1419.00 18x63+66/2 1161.00 26.66x66+42/2 1440.00 H 57 1. 1,2x54+75/2 774,00 1,8x75+69/2 1296.00 58 to 60 3 30x66.66 6000.00 6L 16x50+53/2 824.00 40x53 2120.00 L 4.2O +21 I 2x6O + 4 4. 44 / 2 919.00 20x15+2912 440.00 17x29+2/2 264.00 62 1, 25+3512x72+65/2 2055.00 1./2x65x20 650.00 63 1. 29.80x72+7912 2250.00 64 to 68 5 30x66.66 1-0000.00 69 L 12x150 1800.00 83x705+146/2 10420.00 70 1 20x100 2000.00 25x87+74/2 20t7.00 55x59+74/2 36s8.00 71 1 t/2x63x100 3150.00 47x59+t0O/2 3737.00 1.12x609x4.60 138.00 p 72 1 25+28.04/2x46 46.00 1.220.00 73 to 76 4 25x46 4600.00 77 1 25x46+48/2 L175.00 J 78to 82 5 25x40 s000.00 13.82x40 553.00 83 to 90 8 16.66 x 30 4000.00 91 1 30x60 1800.00 M 92 L 45x45 2025.00 93 L 35x44.68 1564.00 94 t 16x28 448.00 24.50+26/2x50+4012 1136.00 95 t 10x50 s00.00 t3x5]+$.7A/2 609.00 22x20+43.7512 701.00 K 96 to 111 16 16.66x30 8000.00 L 1,12to 1,27 t6 16.66x30 8000.00 N 128 to 135 8 16.66x30 4000.00 o 136 to 1,43 8 15.66x30 4000.00 '1./2x105x76.28 F 34 L 4005.00 E 35 1. 1-5x40 600.00 66.66x55+5/2 200.00 36 to 38 3 25x40 3000.00 39 L 25x44 1100.00 40 L 25x50 1250.00 41 1. 25x56 1400.00 42 t 25x60 1s00.00 Total 2,l]-,LLL.00 Particulars Width x Length TotalArea (in sq. mts.) Area under main commercial 1./2x28.44x5O 23911.00 centre. 29Ox50+30/2 1./2x290x80 Area under lndustries 185+220/2x35+55/2 18670.00 housing. 1./2x!85x17.48 94x49+40/2 27x40+60/2 29x60+50/2 1/2x50x25 t/2x38x9.84 Area over head water tank L12x54x30.55 4140.00 34x47+60/2 t3+2O/2x47+62/2 35+612x17 17x19.08 3310.00 Sewerage treatment Plant 30x55+25/2 1./7x25xt0 60x25+41.1,6/2 Area under electrical sub 175+tO5/2x49.93 6990.00 station Area under Nallah and green. 2064x1.5 30960.00 Parking 48x35+78.15/2 15320.00 85x58.054 Road No. Length (in meters) Width(in meters) 1 730.00 210.00 2 s70.00 20.00 3 195.00 20.00 4 320.00 20.00 5 190.00 15.00 6 150.00 15.00 7 1s0.00 15.00 8 270.O0 20.00 9 160.00 15.00 10 480.00 20.00 1.1 16s.00 15.00 L2 135.00 15.00 L3 136.00 15.00 L4 136.00 15.00 15 155.00 15.00 t6 68.00 15.00 17 58.00 15.00 18 450.00 15.00 3.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages13 Page
-
File Size-