2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 ADAIR 1068 KY-704 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 PL (11.909) OVER PETTY'S FORK. (001B00078N) DN BR 175,000 (SD) RW UT CN BR 490,000 Project Cost: 0 175,000 490,000 ADAIR 80003 KY 55 CONGESTION MITIGTN(O) KY 55 NEW TURNING LANE AT BETTY'S OK PL COUNTRY COOKING DN SPP 250,000 RW UT CN Project Cost: 0 0 250,000 Total for ADAIR county PL DN 175,000 250,000 RW UT CN 490,000 Total Amounts: 0 175,000 740,000 ALLEN 320 KY-100 RECONSTRUCTION(O) IMPROVEMENTS TO KY 100: CURVE, BRIDGE, PL AND INTERSECTION IMPROVEMENTS FROM DN NEAR THE STONY POINT ROAD INTERSECTION RW SPP 1,880,000 TO EAST OF THE ALONZO LONG HOLLOW UT ROAD INTERSECTION (12CCR) CN Project Cost: 0 0 1,880,000 ALLEN 8305 KY-100 RECONSTRUCTION(O) IMPROVE KY-100 (OLD GALLATIN ROAD) FROM PL SOUTH OF KY-2160 TO KY-980. (06CCN) DN RW UT CN SPP 1,250,000 Project Cost: 1,250,000 0 0 Page 3 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 ALLEN 8901 ECONOMIC DEVEL(O) IMPROVE ACCESS ROAD ON EACH END OF PL INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE DN RW UT CN SPP 300,000 Project Cost: 0 0 300,000 ALLEN 10000 KY-3499 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE PL OVER BAYS FORK. (002B00004N) DN BR 175,000 RW UT CN BR 525,000 Project Cost: 0 175,000 525,000 ALLEN 10011 KY-585 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585 BRIDGE PL OVER MIDDLE FORK DRAKES CREEK. DN BR 245,000 (002B00021N) RW UT CN BR 822,500 Project Cost: 0 245,000 822,500 ALLEN 80004 US 231 AIR QUALITY(P) CONSTRUCT A NEW TURN LANE ON US 231 AT PL JOHNSON ROAD TO IMPROVE ACCESS TO DN INDUSTRIAL PARK RW UT CN SPP 250,000 Project Cost: 0 0 250,000 Total for ALLEN county PL DN 420,000 RW 1,880,000 UT CN 1,250,000 1,897,500 Total Amounts: 1,250,000 420,000 3,777,500 Page 4 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 ANDERSON 80001 US-62 SPOT IMPROVEMENTS(O) IMPROVE US-62 (VERSAILLES RD.) FROM PL HILLTOP DR. TO WEST END OF BRIDGE OVER DN SPP 1,200,000 KENTUCKY RIVER AT TYRONE RW UT CN Project Cost: 0 0 1,200,000 Total for ANDERSON county PL DN 1,200,000 RW UT CN Total Amounts: 0 0 1,200,000 BALLARD 115 US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM PL STAFFORD ROAD TO BETHEL CHURCH ROAD DN (INCLUDES KEVIL BYPASS)(TO BE LET WITH RW NH 2,500,000 1-115.10) (06CCR)(12CCR)(14CCR). UT CN Project Cost: 0 0 2,500,000 BALLARD 1140.01 US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT PL OF CAIRO BRIDGE AT OR BESIDE EXISTING DN BR 2,500,000 LOCATION. (004B00021N)(SD) RW UT CN Project Cost: 0 0 2,500,000 BALLARD 20000 US-51 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC PL PAVEMENT DN PM 275,000 RW UT CN PM 2,750,000 Project Cost: 0 0 3,025,000 Page 5 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 Total for BALLARD county PL DN 2,775,000 RW 2,500,000 UT CN 2,750,000 Total Amounts: 0 0 8,025,000 BARREN 195 LN-9008 AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008) BRIDGE PL PAINTING, CLEANING, AND MINOR REPAIRS ON DN BRIDGE OVER I-65 IN BARREN CO. KY. RW 005B00067R, 005B00067L (2016BOP) UT CN NH 500,000 Project Cost: 500,000 0 0 BARREN 10001 US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31EX BRIDGE PL OVER WATER STREET. (005B00058N) DN BR 245,000 RW UT CN BR 945,000 Project Cost: 0 245,000 945,000 BARREN 20000 I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH PL DIRECTION(S) FROM MILEPOINT 42.89 TO DN PM 50,000 MILEPOINT 43.307 RW UT CN PM 500,000 Project Cost: 0 550,000 0 BARREN 20003 LN-9008 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF LOUIE B. PL NUNN CUMBERLAND PARKWAY BOTH DN PM 320,000 DIRECTION(S) FROM MILEPOINT 16.117 TO RW MILEPOINT 20.1 UT CN PM 3,200,000 Project Cost: 0 3,520,000 0 Page 6 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 BARREN 80002 LN-9008 NEW INTERCHANGE(O) NEW INTERCHANGE ON THE LOUIE NUNN PL CUMBERLAND PARKWAY AT KY-249 IN DN SPP 1,500,000 GLASGOW RW UT CN Project Cost: 0 0 1,500,000 Total for BARREN county PL DN 615,000 1,500,000 RW UT CN 500,000 3,700,000 945,000 Total Amounts: 500,000 4,315,000 2,445,000 BATH 8813 US-60 SAFETY(P) IMPROVE SAFETY AND EFFICIENCY AT THE PL KY-211 AND US-60 INTERSECTION IN SALT LICK. DN (14CCN) RW UT CN STP 1,000,000 Project Cost: 0 0 1,000,000 BATH 10000 KY-1106 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1106 BRIDGE PL OVER FLAT CREEK. (006B00069N) DN BR 595,000 RW UT CN BR 2,258,000 Project Cost: 0 595,000 2,258,000 BATH 10001 KY-1944 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1944 BRIDGE PL OVER WHITE OAK CREEK. (006B00076N) DN BR 473,000 RW UT CN BR 1,015,000 Project Cost: 0 473,000 1,015,000 Page 7 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 BATH 10017 KY-211 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211 BRIDGE PL OVER COW CREEK. (006B00043N) DN BR 315,000 RW UT CN BR 717,500 Project Cost: 0 315,000 717,500 BATH 20001 US-60 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC PL PAVEMENT DN PM 410,000 RW UT CN Project Cost: 0 410,000 0 Total for BATH county PL DN 1,793,000 RW UT CN 4,990,500 Total Amounts: 0 1,793,000 4,990,500 BELL 10000 KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE PL OVER RED BIRD CREEK. (007B00071N) DN BR 175,000 RW UT CN BR 441,000 Project Cost: 0 175,000 441,000 BELL 10001 KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE PL OVER RED BIRD CREEK. (007B00072N) DN BR 175,000 RW UT CN BR 791,000 Project Cost: 0 175,000 791,000 Page 8 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 BELL 10002 CR-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1041 BRIDGE PL OVER YORK BRANCH. (007C00003N) DN BR 193,000 RW UT CN BR 595,000 Project Cost: 0 193,000 595,000 BELL 10038 KY-92 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER PL GREASY CREEK. (007B00040N) DN BR 175,000 RW UT CN BR 490,000 Project Cost: 0 175,000 490,000 BELL 20000 KY-2012 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC PL PAVEMENT, SCHOOL BUS SAFETY ISSUE. DN PM 61,000 RW UT CN PM 610,000 Project Cost: 0 671,000 0 Total for BELL county PL DN 779,000 RW UT CN 610,000 2,317,000 Total Amounts: 0 1,389,000 2,317,000 BOONE 14 I-75 I-CHANGE RECONST(O) IMPROVE THE KY-536 (MT. ZION ROAD) PL INTERCHANGE. (14CCR)(16CCR) DN RW UT NH 5,430,000 CN Project Cost: 5,430,000 0 0 Page 9 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 BOONE 14.5 I-75 MINOR WIDENING(O) ADD AUXILIARY LANES ON I-71/75 FROM PL KY-536 TO US-42 (NB & SB) AS PER THE DN INTERCHANGE JUSTIFICATION STUDY (IJS). RW (10CCR)(12CCR) UT NH 1,060,000 CN Project Cost: 1,060,000 0 0 BOONE 78 I-275 NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-275 AND PL GRAVES ROAD (CONTINUATION OF 6-8953: DN NH 3,000,000 INTERCHANGE JUSTIFICATION STUDY ON RW NH 4,000,000 I-275/GRAVES RD). UT NH 3,000,000 CN NH 5,000,000 Project Cost: 0 3,000,000 12,000,000 BOONE 79 I-75 CONGESTION MITIGTN(O) IMPROVE SAFETY, MOBILITY, OPERATIONS, AND PL GEOMETRICS AT THE JUNCTION OF I-75 AND DN NH 2,000,000 I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. RW UT CN Project Cost: 0 2,000,000 0 BOONE 351.45 US-25 MINOR WIDENING(O) MINOR WIDENING AND CONSTRUCT A PL SOUTHBOUND LEFT TURN LANE ON US-25 (DRY DN RIDGE-FLORENCE ROAD) AT MUBEA.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages214 Page
-
File Size-