Belgaum), Karnataka, India

Belgaum), Karnataka, India

<p>E4719 V2 </p><p><strong>GOVERNMENT OF KARNATAKA </strong></p><p><strong>Karnataka Urban Water Supply Modernization </strong><br><strong>Project (KUWSMP) </strong></p><p><strong>ENVIRONMENTAL AND SOCIAL ASSESSMENT (ESA) OF CONTINUOUS WATER SUPPLY PROJECT IN BELAGAVI </strong><br><strong>(BELGAUM), KARNATAKA, INDIA </strong></p><p><strong>DRAFT FINAL REPORT </strong><br><strong>2014 </strong></p><p><strong>Karnataka Urban Infrastructure Development Finance </strong><br><strong>Corporation (KUIDFC) </strong></p><p><strong>KUIDFC </strong></p><p><strong>Abbreviations </strong></p><p>AE AEE <br>Assistant Engineer Assistant Executive Engineer <br>CMC CPCB CPHEEO DoEE DPR <br>City Municipal Corporation Central Pollution Control Board Central Public Health &amp; Environmental Engineering Organisation Department of Ecology &amp; Environment (DoEE) Detailed Project Report </p><ul style="display: flex;"><li style="flex:1">DRIP </li><li style="flex:1">Dam Rehabilitation and Improvement Project </li></ul><p>EA EAC <br>Environmental Assessment Expert Appraisal Committee <br>EC EIA EMP EP <br>Empowered Committee Environmental Impact Assessment Environmental Management Plan Environment Protection <br>ESMP FGD <br>Environmental and Social Management Plan Focused Group Discussions <br>GLSR GoI GoK <br>Ground Level Storage Reservoir Government of India Government of Karnataka <br>JE Km <br>Junior Engineer Kilometer <br>KSPCB KUIDFC KUWASIP KUWSSDB KUWSMP LPCD mg/l MoEF NH <br>Karnataka State Pollution control Board Karnataka Urban Infrastructure Development Finance Corporation Karnataka Urban Water Sector Improvement Project Karnataka Urban Water Supply Sewerage and Drainage Board Karnataka Urban Water Supply Modernization Project Litres per capita per day Milligrams per liter Ministry of Environment &amp; Forests National Highway <br>NRRP O&amp;M OD <br>National Rehabilitation &amp; Resettlement Policy (NRRP Operation &amp; Management Operational Directives <br>OHT OP PAF <br>Over Head Tank Operational Policy Project Affected Families (PAFs) <br>PIU PPP <br>Project Implementation Units Public Private Partnership <br>PSP PPE R &amp; R RAP <br>Private Sector Participation Personnel Protective Equipment Rehabilitation &amp; Resettlement Resettlement Action Plans <br>RPM SEA SEAC SEMF ESA <br>Respirable Particulate Matter Social and Environmental Assessment State’s Environmental Appraisal Committee Social and Environmental Management Framework Environmental and Social Assessment </p><p><strong>bDraft Final Report: Environmental and Social Assessment (ESA) for Continous Water Supply in Belagavi </strong></p><p>SH SPM STP TDS ToR <br>State Highway Suspended Particulate Matter Sewerage Treatment Plant Total Dissolved Solids Terms of Reference <br>UDD UGD ULB UWS UWSS WB <br>Urban Development Department Underground drainage Urban Local Body Urban Water Supply Urban Water Supply Sanitation World Bank </p><ul style="display: flex;"><li style="flex:1">WSS </li><li style="flex:1">Water Supply and Sanitation </li></ul><p></p><p><strong>c</strong><br><strong>Draft Final Report: Environmental and Social Assessment (ESA) for Continous Water Supply in Belagavi </strong></p><p><strong>Contents </strong></p><p>Chapter 1:&nbsp;Introduction..................................................................................................... 1 <br>1.1 Project&nbsp;Background................................................................................................. 1 1.2 Belagavi&nbsp;City and the proposed Project................................................................... 3 1.3 Need&nbsp;for Environmental and Social Assessment (ESA)........................................... 4 1.4 ESA&nbsp;Objectives ...................................................................................................... 4 1.5 Methodology&nbsp;and Approach to ESA........................................................................ 5 1.6 Scope&nbsp;of ESA ......................................................................................................... 5 <br>Chapter 2:&nbsp;Study Area and Project Description ................................................................. 9 <br>2.1 Belagavi&nbsp;City and its Characteristics....................................................................... 9 2.2 Current&nbsp;Water Supply System................................................................................11 2.3 Source&nbsp;of Water Supply &amp; Sanitation Status..........................................................12 2.3.1 Water&nbsp;Treatment Plant ..........................................................................................13 2.3.2 Clear&nbsp;Water Pumping System ...............................................................................13 2.3.3 Water&nbsp;Distribution Pumping Station......................................................................13 2.3.4 Service&nbsp;Reservoir..................................................................................................13 2.3.5 Distribution&nbsp;System ..............................................................................................13 2.3.6 Distribution&nbsp;Pattern...............................................................................................13 2.3.7 Consumer&nbsp;Connection...........................................................................................13 2.4 Existing&nbsp;Sewerage System.....................................................................................13 2.4.1 Existing&nbsp;Sewage Treatment Plant..........................................................................14 2.4.2 Proposed&nbsp;Sewerage System for the City................................................................14 2.4.3 Sanitation&nbsp;Facilities Belagavi...............................................................................14 2.5 Existing&nbsp;Storm Water Drainage System .................................................................14 2.6 Study&nbsp;of Alternatives .............................................................................................16 2.6.1 Reduced&nbsp;Per-capita supply....................................................................................16 2.6.2 Improved&nbsp;Operational Duration ............................................................................16 2.6.3 Distribution&nbsp;System Integration ............................................................................16 2.6.4 Conclusions&nbsp;on alternative Studies........................................................................17 2.7 Demand&nbsp;Projection ................................................................................................17 2.7.1 Source&nbsp;Studies ......................................................................................................18 2.7.2 Water&nbsp;Treatment Plant ...........................................................................................18 2.7.3 Storage&nbsp;Capacity....................................................................................................19 2.7.4 Pumping&nbsp;System....................................................................................................19 2.7.5 Clear&nbsp;Water Transmission System..........................................................................20 2.7.6 Local&nbsp;Distribution System......................................................................................20 2.8 SCADA&nbsp;.................................................................................................................21 <br>Chapter 3:&nbsp;Legislative, Regulatory &amp; Policy Framework..................................................22 <br>3.1 Introduction&nbsp;...........................................................................................................22 3.2 Applicable&nbsp;Policy, Rules &amp; Regulations to project interventions/activities: Environmental <br>22 <br>3.2.1 EIA&nbsp;Notification ....................................................................................................22 3.2.2 Legal&nbsp;Framework of Government of India for Environment Compliance ...............23 3.2.3 Key&nbsp;Environmental Laws and other related Regulations.........................................23 3.3 Applicable&nbsp;Policy, Rules &amp; Regulations to project interventions / activities: Social24 3.3.1 National&nbsp;Policies and Acts .....................................................................................24 3.3.2 Other&nbsp;Legislations in the Social Domain applicable to construction projects ..........25 3.3.3 Applicable&nbsp;Policy, Rules &amp; Regulations at State level............................................27 3.4 World&nbsp;Bank Policies..............................................................................................28 3.5 Legal&nbsp;Monitoring Agency for Environmental Safeguards.......................................30 </p><p>i</p><p><strong>KUIDFC </strong></p><p>3.6 Other&nbsp;Line Agencies Involved ...............................................................................31 3.7 Institutional&nbsp;Setup for Project.................................................................................32 3.8 Legal&nbsp;Approvals / Clearances Required..................................................................33 <br>Chapter 4:&nbsp;Baseline Environmental and Social Profile......................................................35 <br>Environmental Profile ......................................................................................................35 4.1 Land&nbsp;Environment .................................................................................................35 4.1.1 Geology&nbsp;and Topography.......................................................................................35 4.1.2 Soil&nbsp;Characteristics ................................................................................................35 4.1.3 Land&nbsp;Use ...............................................................................................................35 4.2 Climate&nbsp;and Air Environment ................................................................................36 4.2.1 Climate&nbsp;and Rainfall ..............................................................................................36 4.2.2 Wind&nbsp;Speed and Direction .....................................................................................36 4.2.3 Air&nbsp;Quality.............................................................................................................36 4.3 Water&nbsp;Environment................................................................................................37 4.3.1 Surface&nbsp;Water Resources .......................................................................................37 4.3.2 Surface&nbsp;Water Quality............................................................................................38 4.3.3 Hydrogeology&nbsp;&amp; Ground Water Resource..............................................................38 4.3.4 Ground&nbsp;Water Quality............................................................................................40 4.4 Forest&nbsp;and Biodiversity Aspect ..............................................................................41 4.4.1 Protected&nbsp;Areas......................................................................................................41 4.4.2 Wetlands................................................................................................................42 4.5 Heritage.................................................................................................................43 4.6 Baseline&nbsp;Water Sample Survey ..............................................................................44 4.6.1 Water&nbsp;Quality at Source.........................................................................................44 4.6.2 Water&nbsp;Quality at Consumer End.............................................................................45 4.7 Soil&nbsp;Quality ...........................................................................................................46 4.8 Major&nbsp;Findings from Secondary Data Analysis......................................................46 4.8.1 Social&nbsp;Profile .........................................................................................................47 4.8.2 Sex&nbsp;Ratio ...............................................................................................................47 4.8.3 Literacy&nbsp;Profile......................................................................................................47 4.8.4 Average&nbsp;Household Size........................................................................................48 4.8.5 Workforce&nbsp;Participation.........................................................................................48 4.8.6 Ward-wise&nbsp;Analysis...............................................................................................48 4.8.7 Slum&nbsp;Location, Spread &amp; Details...........................................................................48 4.9 Findings&nbsp;of the Primary Survey..............................................................................49 4.9.1 Socio-Economic&nbsp;Features.......................................................................................49 4.9.2 Supply&nbsp;of Water.....................................................................................................51 4.9.3 Health&nbsp;Profile ........................................................................................................57 4.10 Conclusion.............................................................................................................57 <br>Chapter 5:&nbsp;Assessment of Environmental Impacts............................................................58 <br>5.1 Introduction&nbsp;...........................................................................................................58 5.2 Associated&nbsp;and Potential Environmental Impacts ...................................................58 5.2.1 Rating&nbsp;of Impacts...................................................................................................58 5.2.2 Determining&nbsp;the magnitude of impact ....................................................................58 5.3 Land&nbsp;Environment .................................................................................................60 5.4 Water&nbsp;Environment................................................................................................60 5.5 Climate&nbsp;and Air Environment ................................................................................61 5.6 Noise&nbsp;Environment ................................................................................................62 5.7 Construction&nbsp;Phase Specific Impacts and their Rating............................................62 5.8 Activity&nbsp;specific impacts in Sensitive Areas...........................................................65 5.9 Conclusion.............................................................................................................69 <br>Chapter 6:&nbsp;Stakeholders Assessment ................................................................................70 <br>6.1 Major&nbsp;Findings from Stakeholders Consultation ....................................................70 </p><p>ii </p><p><strong>Draft Final Report: Environmental and Social Assessment (ESA) for Continous Water Supply in Belagavi </strong></p><p>6.2 Discussions&nbsp;on gender related issues......................................................................72 6.3 CSIS&nbsp;Stakeholders Consultation.............................................................................73 6.4 Conclusion.............................................................................................................74 <br>Chapter 7:&nbsp;Assessment of Social Impacts.........................................................................75 <br>7.1 Introduction&nbsp;...........................................................................................................75 7.2 Social&nbsp;set up of ESR sites.......................................................................................75 </p><ul style="display: flex;"><li style="flex:1">7.3 </li><li style="flex:1">Process for Social Impact Assessment...................................................................81 </li></ul><p>7.3.1 Baseline&nbsp;survey and stakeholder feedback..............................................................82 7.3.2 Scoping&nbsp;to identify full range of social impacts......................................................83 7.4 Potential&nbsp;Social Impacts in different implementation phases ..................................84 7.5 Conclusion.............................................................................................................87 <br>Chapter 8:&nbsp;Environmental Management Plan ...................................................................88 <br>8.1 Introduction&nbsp;...........................................................................................................88 8.2 Environmental&nbsp;Mitigation Measures ......................................................................88 8.3 Environmental&nbsp;Management Plan ..........................................................................89 8.4 Environmental&nbsp;Monitoring Plan.............................................................................99 8.4.1 Monitoring&nbsp;Indicators ............................................................................................99 8.5 Capacity&nbsp;Building and Training ...........................................................................102 8.5.1 Objectives............................................................................................................102 8.5.2 Training&nbsp;Approach...............................................................................................102 8.5.3 Training&nbsp;Resources..............................................................................................103 8.5.4 Training&nbsp;Programmes...........................................................................................103 </p><p><strong>Chater 9</strong>: <strong>Social Mitigation &amp; Management Plan </strong>..............................................................107 <strong>9.3 Consultations&nbsp;Strategy and Participation Framework </strong>..............................................119 <br><strong>9.4 Grievance&nbsp;Redress Mechanism</strong>..............................................................................120 </p><p>Annexure I: Analysis of Alternatives (Technology &amp; Site).................................................122 Annexure II: No Objection&nbsp;Certificates issued by Government Departments.....................125 Annexure III: Stakeholder Consultation and Focus Group Discussion................................129 Annexure IV: Key Tenets of the NRRP 2007 and Land Acquisition and R&amp;R Act 2013....134 Annexure V: Ward Wise Area and Population ...................................................................137 Annexure VI: Proposed Water Supply System ...................................................................139 Annexure VII: Water Quality Test Results.........................................................................148 </p><p>iii </p><p><strong>KUIDFC </strong></p><p><strong>List of Tables </strong></p><p>Table 2.2: Existing Ward Details ...................................................................................................... 10 Table 2.3: Population Growth trends and density – Belagavi........................................................... 10 Table 2.5: Water Demand Projection .............................................................................................. 18 Table 2.6: Treated Water demand for the Belagavi city................................................................... 18 Table 2.7: Storage requirements of Belagavi City ............................................................................ 19 Table 2.8: Details of clear water pump stations............................................................................... 20 Table 2.8: Summary of distribution network ................................................................................... 20 Table 3.1: Applicable Environmental Laws and Regulations ............................................................ 23 Table 3.2: Legislations applicable to construction projects.............................................................. 25 Table 3.3: Rules and regulations at State Level................................................................................ 27 Table 3.4: Application of Bank Safeguard Policies............................................................................ 28 Table 3.5: Line Departments and their Key Roles and Responsibilities ............................................ 31 Table 3.6: Legal Approvals and Clearances...................................................................................... 33 Table 4.1: Land use Pattern............................................................................................................. 35 Table 4.2: Seasonal and Annual Normal Rainfall for the Period 2001 – 2010 (mm).......................... 36 Table 4.3: Surface Status................................................................................................................. 38 Table 4.4: Forest Cover in Project Area ........................................................................................... 41 Table 4.5: Protected Areas and Impact............................................................................................ 42 Table 4.6: Number and Types of Wetland in Belagavi...................................................................... 42 Table 4.7: Raw and Treated Water Results (Physical &amp; Chemical) ................................................... 44 Table 4.8: Water Quality at Consumer End (Tap Water).................................................................. 46 Table 4.9: Major Issues / Findings based on Secondary Data related to Proposed Project............... 46 Table 4.11: Slum Details.................................................................................................................. 48 Table 4.12: Sample Size................................................................................................................... 49 Table 4.13: Population Trend and Caste-Wise Distribution of HH.................................................... 49 Table 4.14: Household Distribution based on no of Family Members (%)........................................ 50 Table 4.15: Average HH Monthly Income Non Slum and Slum......................................................... 50 Table 4.17: Earning HH Head and Education Level in Belagavi......................................................... 50 Table 4.18: Frequency of water supply for HH connection .............................................................. 51 Table 4.19: Hours of supply on day of supply .................................................................................. 51 Table 4.20: Per Capita Water Consumption in Belagavi................................................................... 52 Table 4.21: Per Capita Water Consumption in Belagavi................................................................... 52 Table 4.22: Methods Used to Get Water from HH Connections....................................................... 52 Table 4.23: HH members involved in getting water from stand post ............................................... 53 Table 4.24: Social Category wise HH level water treatment practices.............................................. 54 Table 4.25: Willingness to Pay by Different Facility Users................................................................ 55 Table 4.26: Willingness to Pay across Income Categories ................................................................ 56 Table 4.27: Reasons for not having HH Water Connection .............................................................. 56 Table 4.28: Respondents Reporting Water Borne Diseases ............................................................. 57 Table 4.29: Average Household Monthly Medical Expenditure ....................................................... 57 Table 4.30: Knowledge of Water Borne Diseases ............................................................................ 57 Table 4.31: Source of Medical treatment ........................................................................................ 57 Table 5.1: Construction Phase-specific Environmental Impact......................................................... 62 Table 6.2: Activity Specific Social Impacts in Sensitive Areas ........................................................... 65 Table 5.2: Rating of Environment Impacts....................................................................................... 68 Table 6.1: Identified Potential Impacts by Phases............................................................................ 85 Table 7.2: Environmental Monitoring Indicators ............................................................................. 99 </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    191 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us