Insert Budget Title Here

Insert Budget Title Here

Transportation Master Plan Ottawa Cycling Plan Ottawa Pedestrian Plan 2013 Review October Consultation Summary Presentation to: Transportation Committee 15 November 2013 Presentation Overview • Summarize feedback from October 2013 consultation process • Identify proposed changes in response to comments • Present additional transit-related details for extending LRT to the suburban town centres outside the Greenbelt 2 Ottawa Pedestrian Plan October 2013 Consultation Feedback Major Themes: • Comments relating to maintenance, operation and design of pedestrian infrastructure • Specific feedback about intersection design, vehicle speeds, and winter maintenance • Changes to Varley Drive and Halton Terrance in the Kanata North 3 Recommended Changes Affordable Pedestrian Projects 4 Ottawa Cycling Plan October 2013 Consultation Feedback Major Themes: • Accessibility concerns • Paved shoulders policies • Visibility of future cycling infrastructure as part of integrated projects • Rideau Canal Footbridge (Fifth Avenue and Clegg Street) • Changes in Barrhaven, Vanier, Sandy Hill, Lowertown, Old Montreal Road, Prince of Wales Drive 5 Recommended Changes Affordable Cycling Projects 6 TMP - Transit October 2013 Consultation Feedback Major Themes: • Greater emphasis on accessibility and Para Transpo • O-Train extension to the Ottawa International Airport • Rapid Transit through the Fernbank Community • More LRT expansion (i.e. Canada Tire Centre, Trim Road, Barrhaven) • Kanata North Bus Rapid Transit extension • West Transitway (Terry Fox Station to March Road) 7 Recommended Changes Ultimate Network Concept 8 Recommended Changes Affordable Transit Projects 9 Assessing Rail Service Outside the Greenbelt • Assessed relative merit of extending rail service to the three suburban town centres (Kanata, Barrhaven, Orléans) and extending the O-Train (Bowesville / Riverside South) • Key criterion: Passenger-Kilometres per Capital Expenditure (M$) • Provides a normalized comparison of ridership and cost 10 Assessing Rail Service Outside the Greenbelt O-Train Extension Orléans Kanata Barrhaven (Greenboro to Bowesville) (Blair to Place (Bayshore to Terry (Baseline to d’Orleans) Fox) Barrhaven TC) Average Two- 2,600 9,300 8,400 8,400 Way Ridership * Length 7.8 km 8.8 km 8.9 km 9.5 km Two-Way 20,000 82,000 75,000 80,000 Passenger-kms * Capital Cost $99M $500M $600M $800M * 2031 Peak Period 11 Assessing Rail Service Outside the Greenbelt 12 Transit Project Rankings 13 TMP – Roads October 2013 Consultation Feedback Major Themes: • Complete Street Policies • Heavy trucks on King Edward Avenue, Waller and Rideau Streets • Hope Side Road widening • Prince of Wales Drive widening • March Road widening • Earl Armstrong Road widening 14 Recommended Changes Affordable Road Projects 15 Next Steps Date Milestone November 26 Council to approve TMP, OCP , OPP and OP 16.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us