HS2 Ltd FOI & EIR Disclosure

HS2 Ltd FOI & EIR Disclosure

HS2 Ltd FOI & EIR Disclosure log ‐ September 2015 to September 2017 Ref No Request Outcome Subject Completion date FOI15-1357 Fully met Skills forecasting, railfreight, and rolling stock requirement. 01/09/2015 Technical agreement between Secretary of State for Transport and Packington Estate in FOI15-1363 Fully met 04/09/2015 relation to the realignment of Diddington Lane FOI15-1365 Fully met Detailed analysis including costings for Wendover Dean Viaduct 07/09/2015 Met but some info not Information relating to HS2 Phase One landscape costs and value for money environmental FOI15-1366 07/09/2015 held assessment for the area between Amersham and Chilterns North at Wendover Information about HS2 Ltd procurements under the EU procurement directives which were FOI15-1367 Partially met 11/09/2015 concluded/awarded between 1 April 2014 and 31 July 2015 FOI15-1368 Fully met Previously unpublished photomontage images of the HS2 rail proposals 14/09/2015 FOI15-1369 Fully met Text of termination clauses in all HS2 Ltd contracts 10/09/2015 Details of investigations undertaken by HS2 Ltd on the effectiveness of a noise barrier at FOI15-1373 Fully met 04/09/2015 Westbury Viaduct FOI15-1376 Fully met Information relating to HS2 construction at Nash Lee Lane overbridge satellite compound 18/09/2015 FOI15-1379 Fully met Fujitsu contract details 21/09/2015 FOI15-1383 Fully met Number of employees based at HS2 Ltd London and Birmingham offices 17/09/2015 Minutes of meetings held between HS2 Ltd and Solihull MBC, Hampton in Arden Parish FOI15-1385 Partially met 24/09/2015 Council and the Hampton Society and Packington Estates regarding Diddington Lane FOI15-1386 Partially met Minutes of meetings referred to in FOI15-1373 relating to the Westbury Viaduct 18/09/2015 Met but some info not FOI15-1388 Construction traffic movements at exits 2 and 4 of the M40 01/10/2015 held FOI15-1392 Fully met Roles and responsibilities of civil engineers on the HS2 project 16/09/2015 Met but some info not FOI15-1393 Code of Construction Practice details 02/10/2015 held Met but some info not FOI15-1396 Details on plans for Euston including track, platforms and capacity figures 07/10/2015 held FOI15-1400R Partially met Information relating to the land disposal policy 18/11/2015 FOI15-1402 Partially met Details of HS2 Ltd software contract for systems and mobiles 21/10/2015 FOI15-1403 Partially met Contract information relating to banking services, audit services and card processing services 12/10/2015 Met but some info not FOI15-1404 Technical questions regarding Hampstead Road Bridge (near Euston) 13/10/2015 held FOI15-1409 Fully met Companies currently providing engineering and infrastructure design services to HS2 Ltd 16/10/2015 ICT contract(s) for server hardware maintenance, server virtualisation license and storage area FOI15-1410 Partially met 30/10/2015 network Technical documents to establish the feasibility of HS2 engines to meet advertised speeds / FOI15-1413 Fully met 26/10/2015 pollution levels FOI15-1415 Fully met CEO's expenses since May 2014 26/10/2015 FOI15-1416 Fully met Information on barrette wall construction in Euston Station approach cutting 06/11/2015 FOI15-1419 Partially met Costs relating to Wendover Tunnel 15/10/2015 Information relating to the traffic assessments published in AP4 ES for the B485-A413 and FOI15-1422 Fully met 16/11/2015 A4128-A413 road junctions in CFA9 FOI15-1423 Partially met Correspondence between Rland Energy and HS2 Ltd between 1/12/13 and 30/9/15 17/11/2015 FOI15-1424 Fully met Flow of traffic on B4453 Rugby Road (CFA17) during HS2 construction 23/10/2015 FOI15-1427 Fully met Cost of Handsacre Link and passenger numbers 20/11/2015 Number of people who will work for HS2 Ltd and a breakdown of the ‘£11.8 billion’ of FOI15-1428 Fully met 03/11/2015 construction contracts recently announced Information and correspondence which relates to the provision or non-provision of a traffic Met but some info not assessment for junction A413 (Amersham bypass) / A355 (Gore Hill) and any of the M40 FOI15-1429 24/11/2015 held junctions (1,2,4,5,8a) carrying construction traffic from the Chilterns ( CFAs 8, 9 & 10) in the ES or subsequent AP2 and AP4 documentation Structure of IT department including hierarchy, team size and contract/permanent roles. Also FOI15-1430 Fully met if the development team use Java or Microsoft programming language and if Microsoft 12/11/2015 Dynamics is used as CRM system, which version. Met but some info not FOI15-1434 CAPEX costs for eastern leg of Phase 2 30/11/2015 held FOI15-1435 Fully met Fixed telephony, WAN and broadband contract information 20/11/2015 FOI15-1440 Fully met Information regarding utility works in and around Ampthill Square estate 07/12/2015 FOI15-1444 Fully met Breakdown of SR15 projected costs for HS2 24/12/2015 FOI15-1446 Fully met Recruitment policy for senior managers at HS2 21/12/2015 FOI15-1450 Fully met Current estimate for redeveloping Euston Station based on AP3 22/12/2015 FOI15-1451 Fully met Height information where the route passes through Whitmore Heath 18/12/2015 All documentation including sift reports, minutes of meetings and post-consultation analyses FOI15-1452 Partially met 15/01/2016 relating to the Phase 2a route between Great Haywood and Swynnerton (HSM03) Met but some info not FOI15-1454 Tender documents for CPO advisor contract/framework 08/01/2016 held Local Area Network (LAN) contract, including support and maintenance, e.g. switches, router, FOI15-1462 Partially met 12/01/2016 software installation and cabling Met but some info not Information relating to construction traffic assessments for Phase 1 CFA9 and CFA10 for the FOI16-1464 21/01/2016 held junctions of B485, A4128 and Rocky Lane with the A413 Latest forecasts for increased traffic movements during construction on the proposed route FOI16-1466 Fully met 22/01/2016 from the A41 junction to Edgcott (CFA12 and 13) FOI16-1468 Partially met HS2 Ltd's Wi-Fi contract(s) related to managed guest and visitor WiFi 01/02/2016 Spend on legal fees in 2015, details on a panel of preferred legal providers and what year the FOI16-1469 Fully met 09/02/2016 panel was appointed Records of discussions associated with the post consultation route options for the Great FOI16-1472 Partially met 11/02/2016 Haywood to Yarlet section of Phase 2a List of the largest contract sums over £5m and a list of companies who have tendered for the FOI16-1479 Fully met 23/02/2016 works and successfully won the contract over the last 12 months List of the properties purchased by HS2 Ltd from 1 January 2011 to 31 January 2016 including FOI16-1481 Fully met 25/02/2016 purchase price FOI16-1483R Partially met Staff expense claims from 1 January 2013 to 31 December 2015 20/04/2016 Details of the Phase 2 engagement meetings referred to in the February 2016 report by the FOI16-1484 Fully met 14/03/2016 Residents’ Commissioner and which action groups and parish councils attended FOI16-1488 Fully met Information on tunnels, porous portals and design speed 21/03/2016 FOI16-1489 Fully met List of contracts awarded by HS2 Ltd over the past 3 years and whether they were advertised 21/03/2016 FOI16-1490 Fully met The cost of the Chiltern Tunnel Short Tunnel Extension as set out in AP4 04/03/2016 FOI16-1492 Fully met List of properties purchased by HS2 Ltd in January and February 2016 24/03/2016 Details of data protection policy and any data protection incidents, anomalies or near-misses FOI16-1493 Fully met 30/03/2016 since 2011 Latest version of the outline for Euston Station that depicts the extent of the demolition area FOI16-1494 Fully met 15/03/2016 of the existing station Community Engagement paper presented to HS2 Executive Board referred to in Residents' FOI16-1496 Partially met 08/03/2016 Commissioner's February 2016 report Please supply a copy of all images/drawings/plans that show "additional" tracks in the Old Oak FOI16-1498 Fully met Common area including the North London Line, West London line, Dudding Hill Line, 23/03/2016 Wycombe Line, or any combination of those, dated from 1 January 2016 Heriott Watt study into Rayleigh Waves (Geo-dynamic Modelling of Track Bed FOI16-1501 Fully met 07/04/2016 and Earthworks) Full details of the relocation from Canary Wharf to HS2 Ltd offices in Birmingham and FOI16-1502 Fully met 25/04/2016 packages being offered to staff, especially senior managers Government Procurement Card expenditure for HS2 Ltd executives. Total spend for 2015 and FOI16-1503 Fully met 06/05/2016 details of expenditure for December 2015 HS2 Ltd's policy on requests for filming or recording staff during public or one-to-one FOI16-1504 Fully met 22/04/2016 meetings Met but some info not FOI16-1507 Journey times; risks associated with derailment; speed and accident valuations 28/04/2016 held FOI16-1509 Fully met Additional information about single bore and twin bore tunnels, porous portals and line speed 11/05/2016 FOI16-1510 Fully met Information relating to errors in the Phase One Environmental Statement 12/05/2016 FOI16-1511 Fully met List of properties purchased by HS2 Ltd during March 2016 17/05/2016 Met but some info not FOI16-1513 Travel and accommodation expenditure for staff and directors 2015 26/05/2016 held Lists of all GPC transactions by Executive Directors in 2015; where hospitality is involved FOI16-1514 Fully met 27/06/2016 please provide copies of the itemised receipts for each transaction FOI16-1517 Fully met List of all properties purchased by HS2 Ltd from February 2016 to April 2016 02/06/2016 Cost and justification for the extension of the tunnel portal porous section in West Ruislip and FOI16-1520 Fully met the amount of tunnel segment factories to be built along the route, how many will be 02/06/2016 demolished and removed on completion of the project Information relating to CFA 10 Wendover, Dunsmore and Halton: Met but some info not - LaMax figures for night time; and FOI16-1522 27/06/2016 held - View from Dunsmore to Wendover with the proposed 6m sound barriers and how will this affect the ZTV projections and the significance rating from the original design.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us