World Bank Document

World Bank Document

PUBLIC WORKS DEPARTMENT GOVERNMENT OF MEGHALAYA PROJECT NAME: MEGHALAYA INTEGRATED TRANSPORT PROJECT (MITP) ROAD NAME: PARALLEL ROAD TO EXISTING DALU BAGHMARA ROAD ENVIRONMENTAL IMPACT ASSESSMENT REPORT First Draft : 06.01.2020 Revised on : June 2020 Prepared: BK Checked: BK/CB Approved: BPS 1 Table of Contents Executive Summary ........................................................................................................................................ 4 1. Introduction ............................................................................................................................................ 8 Background ................................................................................................................................................. 8 Purpose of ESIA Report ............................................................................................................................. 8 Objective and Scope of the EIA Study ....................................................................................................... 9 Approach and Methodology Adopted for EIA Study ................................................................................. 9 Caveats to EIA Study ................................................................................................................................ 12 Structure of EIA Document ...................................................................................................................... 12 2. Project Description ............................................................................................................................... 14 Brief Description of the Project Road ....................................................................................................... 14 Carriageway and Right of Way ................................................................................................................ 14 Pavement Conditions ................................................................................................................................ 14 Other Design Features .............................................................................................................................. 15 3. Policy, Legal and Administrative Frameworks .................................................................................... 16 Environmental Legal Framework ............................................................................................................. 16 World Bank Operational Policies and Environmental Requirements ....................................................... 19 4. Environmental Baseline Status ............................................................................................................. 22 Introduction and Methodology ................................................................................................................. 22 Physical Environment ............................................................................................................................... 22 Topography, Soil, Geology and Seismicity .............................................................................................. 22 Flood Plains .............................................................................................................................................. 23 Water Quality and Atmosphere ................................................................................................................ 23 Air Environment ....................................................................................................................................... 26 Biological Environment ............................................................................................................................ 28 5. Analysis of Alternatives ....................................................................................................................... 30 6. Potential Environmental Impacts and their Mitigation Management Plan ........................................... 31 6.1 Impacts on Physical Environment ...................................................................................................... 31 Impacts on Biological Environment ......................................................................................................... 36 Impacts on Community Sensitive Receptors and Health and Safety ........................................................ 36 Impacts on Occupational Health and Safety ............................................................................................. 39 7. Public Consultation and Disclosure ...................................................................................................... 43 8. Environmental Management Plan ........................................................................................................ 48 8.1 Environmental Management Plan ....................................................................................................... 48 Pre- construction activities by Project Implementation Unit and Contractor ........................................... 48 Pre-construction activities by the Contractor/ PIU ................................................................................... 49 Construction Stage (Activities to be carried out by the Contractor) ......................................................... 57 8.2 Environmental Monitoring Plan ......................................................................................................... 76 9. Implementation Arrangement ............................................................................................................... 82 8.1 Establishment of an Environmental and Social cell within the PWD ................................................. 82 8.2 Training and Capacity Building .......................................................................................................... 84 8.3 EMP Estimated Implementation Budget for project road section ...................................................... 85 Annex-2: Borrow area management guidelines ........................................................................................ 91 Annex-3: Guidelines For Storage, Handling And Disposal Of Hazardous Waste, Municipal Solid Waste And Construction And Demolition Waste ................................................................................................ 95 Annex 4- Guidance Note on Site Clearance ............................................................................................. 98 Annex 5: Construction Camp Management .............................................................................................. 99 Annex 6: Contractors Responsibility for COVID-19 and other Pandemics ........................................... 108 Annex 7: Attendance Sheet of public consultations ............................................................................... 110 List of Tables Table 1: Phase 1 - List of Roads ..................................................................................................................... 4 Table 2: Project Road Coordinates ................................................................................................................. 4 Table 3: MITP Phase - I Roads - West Meghalaya ......................................................................................... 8 Table 4: Sources of secondary information................................................................................................... 10 Table 5: Summary of existing carriageway ................................................................................................... 14 2 Table 6: Applicable Laws and Regulations of GoI, State ............................................................................. 16 Table 7: Gap Analysis WB Policies and Environmental Regulatory Compliance Requirements ................ 20 Table 8: Details of the stretches .................................................................................................................... 23 Table 9: Rivers/ Streams Crossing Across Project Road .............................................................................. 23 Table 10: Surface Water Quality ................................................................................................................... 24 Table 11: Groundwater Quality .................................................................................................................... 25 Table 12: Climatology Table (Nearest Station at Tura) ................................................................................ 26 Table 13: Ambient Air Quality Monitoring Analysis ................................................................................... 27 Table 14: Noise Monitoring Observations .................................................................................................... 27 Table 15: CPCB Ambient Noise Standards .................................................................................................. 27 Table 16: Fishes in Bakali River ................................................................................................................... 28 Table 17: Soil erosion prone areas ................................................................................................................ 31 Table 18: Slope Protection Measures Parallel Road to existing Dalu Baghmara Road ...............................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    112 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us