Safety Project Application

Safety Project Application

Project Application General Information Current Proposed ODOT ODOT Primary Facility Name Status Status PID District County (Tier 1, Tier 2 (Tier 1 or (3 char (i.e. route, rail, terminal, or port name) or New) Tier 2) abrv) Tier 2 Tier 2 75119 8 HAM Interstate 71 / 75 Project Sponsoring Agency The Ohio Department of Transportation Project Manager (Contact Person) Phone Number Stefan Spinosa 513-933-6639 Email Address [email protected] Project Description Local Jurisdictions (i.e. list all cities, counties and townships) Cincinnati Description of Work Project will reconstruct the Ohio approaches to the Brent Spence Bridge connecting Cincinnati, Ohio to Covington, Kentucky. Work will include additional through lanes and the rehabilitatation of existing pavement and bridges. The project will reduce congestion and improve safety. Project extends from the Ohio River through the Western Hills viaduct interchange, and ties into the Mill Creek Expressway project. Purpose and Need The Brent Spence Bridge project is intended to improve the operational characteristics within the I-71/I-75 corridor for both local and through traffic. In the Greater Cincinnati/Northern Kentucky region, the I-71/I-75 corridor suffers from congestion and safety–related issues as a result of inadequate capacity to accommodate current traffic demand. The purpose of this project is to: • improve traffic flow and level of service, • improve safety, • correct geometric deficiencies, and • maintain links in key mobility, trade, and national defense transportation corridors. ( Excerpt from Brent Spence Project Purpose and Need May 2006) Community & Economic Growth and Development Factors Adopting Appropriate Land Use Measures Land Use Plan Land Use Plan Zoning based on Part of State/MPO Exists Coord. with T-Plan T-Plan Long Range Plan (Yes, No or N/A) (Yes, No or N/A) (Yes, No or N/A) (Yes, No or N/A) Yes N/A N/A Yes Priority on County or MPO Long Range Plan This project can be found on page 44 of OKI’s FY 2008 – 2011 Transportation Improvement Program dated May-18-09. Percent of Improves Improves * Sub-county * Sub-county Land Being Business Invest & 5 Yr Unemployment 5 Yr Poverty Redeveloped Access Employ Rate Rate (%) (Yes or No) (Yes or No) (%) (%) 100% No No * Optional. If omitted, the 5 year rates for the primary county will be obtained from the US Bureau of Labor Statistics (www.bls.gov) and US Census Bureau (www.census.gov). Transportation Factors Connects Reduces Fuel Consumption Reduces Ozone Precursors Transportation Modes (Yes or No) (Yes or No) (Yes or No) No No No If project connects transportation modes, please explain how Existing Road Facilities (If applicable) Begin End Primary ODOT NLFID Location Termini Log Point Log Point Road (or Cnty/Rte #) (x.xx) (x.xx) (i.e. from street 1 to street 2) (Yes or No) SHAMIR00075**C 0.22 3.00 IR 71 to Marshall Ave. Yes SHAMIR00071**C 0.00 0.56 Ohio River to Plum Street No (Insert additional rows as needed – one row for each existing roadway to be improved) New Road Facilities (If applicable) Name or Beg Beg End End Primary Location Termini Designation Lat Lon Lat Lon Road (xx.xxxx) (xx.xxxx) (xx.xxxx) (xx.xxxx) (i.e. from street 1 to street 2) (Yes or No) (Insert additional rows as needed – one row for each new roadway to be constructed) Transit Facilities (If applicable) Benefit/ Element Peak Hour Ridership VMT Reduction Cost Name Ratio (Riders) (%) (x.xxx) (Insert additional rows as needed – one row for each transit facility element) Freight Facilities (If applicable) Freight Volume / Benefit/ Element Facility Capacity Truck Reduction Cost Name Ratio Ratio (x.xxx) (%) (x.xxx) (Insert additional rows as needed – one row for each freight facility element) Project Development Actual / Projected Project Phase Completed By Completion Date (Agency Name) (MM/DD/YYYY) Planning Study ODOT 09/01/2006 Interchange Modification Study ODOT 10/1/2010 Environmental (NEPA) Doc. ODOT 01/14/2011 Detailed Design ODOT 01/01/2013 Right of Way / Utilities ODOT 04/01/2014 Sources of Other (Non-TRAC) Funding (If applicable) Project Phase Source Amount (PS, NEPA, DD, RW, CO) (Agency name) (In Millions) PS ODOT $1.026 PS Kentucky Transportation Cabinet $1.279 NEPA ODOT $8.403 NEPA Kentucky Transportation Cabinet $8.192 Additional Explanation of Other Funding Planning Study and NEPA funding from ODOT has been through Federal Earmarks with a TRAC State fund match. (Insert additional rows above “Additional Explanation of Other Funding” as needed – one row for each combination of project phase and source) Note: Totals of Other funding entered above MUST MATCH totals in project funding table below by project phase. Project Sponsor Investment Factors Creation of TIF or Other Innovative Percentage of Sponsoring Agency Financing Tool Investment (Yes or No) (%) No 1.78 Project Funding Project Fiscal Other Previous New Total Phase Year Funding TRAC TRAC (YYYY) (In Millions) (In Millions) (In Millions) (In Millions) Planning 2005 $2.305 $0.506 $0 $2.811 Study (PS) 2007 $3.751 $0.459 $0 $4.210 Environmental 2008 $0.861 $0.100 $0 $0.961 Doc. (NEPA) 2010 $11.984 $1.371 $0 $13.355 Detailed 2011 $0 $25.000 $29.300 $54.300 Design (DD) 2012 $0.400 $0.400 Right of Way 2013 $0 $0 $10.900 $10.900 /Utilities (RW) 2014 $0 $0 $20.600 $20.600 2015 $5.100 $5.100 Construction 2015 $232.100 $232.100 $0 $0 (CO) 2016 $696.200 $696.200 Total $18.901 $46.337 $994.600 $1,059.938 Applicant Information Remarks/Comments Name Title Phone Number Acting Planning Andrew J. Fluegemann 513-933-6798 Administrator Signature Date MPO Acknowledgement (If applicable) Name MPO Phone Number Signature Date ODOT District Acknowledgement Name District Phone Number Hans R. Jindal, P.E. 8 513-933-6594 Signature Date Rev. 6-10-09 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us