Thermal Power Plants

Thermal Power Plants

HOME ABOUT US OUR OPERATIONS INVESTOR RELATIONS SUSTAINABILITY INITIATIVES GALLERY CAREERS Contact us | Site Map HOME ABOUT US OUR OPERATIONS INVESTOR RELATIONS SUSTAINABILITY INITIATIVES OTHER LINKS CONTACT Thermal Power Plants KSK Energy Ventures Limited We are a power project development company in India, with track record of developing and operating power plants. We were established in 2001 to capitalize on the emerging opportunities in the Indian power sector and focus on developing, operating and maintaining power projects. We supply power to a combination of industrial and state-owned consumers in India. KSK Energy Ventures has current interests in various operational power plants capable of generating 2062 MW of power and is currently involved in constructing 3600 MW KSK Mahanadi Power plant that two units of 600 MW each operational and remaining units under various stages of construction Additionally, the group has an exciting portfolio of planned projects across the fuel spectrum. The key current business interests of KSK Energy Ventures Limited are: 58 MW Sai Regency Power Corporation Private Limited, Tamilnadu 43 MW Sitapuram Power Limited, Andhra Pradesh 86 MW Sai Lilagar Power Genertaion Limited, (Formerly known as Sai Lilagar Power Limited) Chhattisgarh 540 MW Sai Wardha Power Generation Limited, Maharashtra 135 MW VS Lignite Power Private Limited, Rajasthan 3,600 MW KSK Mahanadi Power Company Limited, Chhattisgarh - Partial Commissioning This is a coal based power project approximately 125 kilometers from the Morga II coal block in Chhattisgarh. The original project was a 1,800 MW power project based on coal supplies from the Morga-II coal block by GMDC. With the availability of additional fuel from the Gare Pelma Sector III coal block in Chhattisgarh, the KSK Mahanadi Power Project has been expanded through the fast track development of an additional 1,800 MW of power generation capacity in the same location. This power project of 3600 MW , 6 identical units of 600 MW each is being setup in a single location and is scheduled to be commissioned on a unit-wise basis through 2013 to 2015 The first 600 MW has been commissioned in 2013 and second 600 MW has been commissioned in August 2014. Location: The site for this project is situated in Nariyara village, Akaltara Tehsil, Janjgir-Champa district, Chhattisgarh. Off Taker: Pursuant to the various underlying agreements, power supplies tied up to the various state utilities as below Off Taker Quantity (MW) Nature of Tie up Gujarat Urja Vikas Nigam Limited (GUVNL) 1010 MW Case-I Competitive Bid Andhra Pradesh Discoms 400 MW Case-I Competitive Bid Chhattisgarh State Power Trading Company Limited 225 MW Chhattisgarh Government State Policy Tamil Nadu Generation and Distribution Corporation Limited 500 MW Case-I Competitive Bid Uttar Pradesh Power Procurement Corporation and Discoms 1000 MW Case-I Competitive Bid Total 3,135 MW Fuel Supply: The KSK Mahanadi Power Project will utilize domestic coal as its primary fuel. With the uncertainty on certain underlying coal mine development permissions and progress thereto, in the immediate term the fuel supplies shall consist of ◊ Market Coal / Imported Coal ◊ Tapering Linkage by CIL subsidiaries ◊ GIDC Coal supplies from Gare pelma-III Block ◊ GMDC Coal supplies from Morga-II EPC contract: The KSK Mahanadi Power Project has selected Shangdong Electric Power Construction Corporation (SEPCO), a leading EPC contractor from China engaged in power plant design and construction, as the contractor to undertake design, supply and provide engineering and construction services for the KSK Mahanadi power project. Under these agreements, SEPCO has completed part supplies and construction and expected to supply the KSK Mahanadi with necessary equipment and materials and render such services as are required for the plant to generate aggregate power of 3,600 MW. Amendment for Bids - Flue gas desulphurisation FGD System Invitation for Bids - Flue gas desulphurisation FGD System RFQ for procurement of coal Environmental Clearance Halfyear Environmental clearance complince report Apr19 - Sep2019 Fly Ash - Statutory Compliance Report July-2017 Fly Ash - Utilization statement Environmental Statment Online Continuous Stack Emission Data Copy right information 2014 || Legal Disclaimer KSK Energy Ventures Limited, 8-2-293/82/A/431/A, Road No:22, Jubilee Hills, Hyderabad 500033, INDIA..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us