AP2 - 1 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan

AP2 - 1 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan

PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project No. Project Title Sector R-01 JORR (Outer Ring Road) × Road Railway Bus Project Location Project Priority Implementation Traffic Management Period Section: W1, W2, E1, E3 x Short-term Safety and Security Environment Medium-term 4 years City Planning Long-term Institution/Funding 1. Summary of Objectives 2. Expected Benefits/Outputs - To solve the problem of missing link - Completing the outer ring road - To meet growing traffic demand - Strengthening mobility in the region - To complete the JORR - Reducing travel time 3. Project Description 4. Project Linkages/Other Sector Linkages - Construction of Jakarta Outer Ring Road - Total length : 36.5 km 5. Important Assumptions/Conditions for the Project 6. Implementing Agency Extending soft loan PT. Jasa Marga 7. Estimated Investment Requirement 8. Special Considerations (in 2003 prices) - Access should be developed For Project cost in Total: Rp. 7,040 B . For Annual Recurrent O & M: Rp. 141 B/ann. 9. Environmental Impact 10. Location Map/Information/Drawings 1) Social Environment . - Resettlement necessity: B - Splitting community: B 2) Natural Environment - Unknown 3) Pollution - Air pollution: B - Noise and vibration: B AP2 - 1 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project No. Project Title Sector R-02a Jatiasi – 2nd JORR Toll × Road Railway Bus Project Location Project Priority Implementation Traffic Management Period Kota & Kabupaten Bekasi Short-term Safety and Security 5 years Environment Medium-term x City Planning Long-term Institution/Funding 1. Summary of Objectives 2. Expected Benefits/Outputs - To establish High Mobility Highway network - Providing alternative routes of toll road for users - To provide alternative route of Cikampek Toll - Strengthening mobility in the region - To connect JORR and 2nd JORR - Alleviating traffic congestion on the existing roads 3. Project Description 4. Project Linkages/Other Sector Linkages - Construction of connecting toll road - Integration with 2nd JORR - Total length : 3.7 km 5. Important Assumptions/Conditions for the Project 6. Implementing Agency Completion of 2nd JORR Private sector participation / PT. Jasa Marga 7. Estimated Investment Requirement 8. Special Considerations (in 2003 prices) - Social impact by land acquisition For Project cost in Total: Rp. 223 B . For Annual Recurrent O & M: Rp. 4 B/ann. 9. Environmental Impact 10. Location Map/Information/Drawings 1) Social Environment . - Resettlement necessity: A - Splitting community: A 2) Natural Environment - Unknown 3) Pollution - Air pollution: B - Noise and vibration: B R02 AP2 - 2 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project No. Project Title Sector R-03 Tj. Priok Access × Road Railway Bus Project Location Project Priority Implementation Traffic Management Period JORR – Tj. Priok – Harbor Road x Short-term Safety and Security Environment Medium-term 4 years City Planning Long-term Institution/Funding 1. Summary of Objectives 2. Expected Benefits/Outputs - To solve the problem of missing link - Having an effective physical distribution - To provide smooth accessibility from the sea port - Strengthening mobility of large trucks - To separate large trucks from other vehicles - Alleviating traffic congestion around the sea port 3. Project Description 4. Project Linkages/Other Sector Linkages - Construction of Access road to Tj. Priok sea port - Sea port development - Total length : 12.1 km - Completion of JORR 5. Important Assumptions/Conditions for the Project 6. Implementing Agency Extending soft loan PT. Jasa Marga 7. Estimated Investment Requirement 8. Special Considerations (in 2003 prices) - Access should be developed For Project cost in Total: Rp. 3,780 B . For Annual Recurrent O & M: Rp. 76 B/ann. 9. Environmental Impact 10. Location Map/Information/Drawings 1) Social Environment . - Resettlement necessity: B - Splitting community: B 2) Natural Environment - Unknown 3) Pollution - Air pollution: B - Noise and vibration :B AP2 - 3 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project No. Project Title Sector R-05 2nd JORR (Outer Outer Ring Road) × Road Railway Bus Project Location Project Priority Implementation Traffic Management Period JORR East - Cikampek Toll – × Short-term Safety and Security Environment Cileungsi -Depok- Tangerang - × Medium-term 14 years Cengkareng Access City Planning × Long-term Institution/Funding 1. Summary of Objectives 2. Expected Benefits/Outputs - To promote sub-regional development - Strengthening mobility in the region - Connecting sub-centers - Reducing travel time 3. Project Description 4. Project Linkages/Other Sector Linkages - Construction of 2nd Jakarta Outer Ring Road - Total length : 108.2 km 5. Important Assumptions/Conditions for the Project 6. Implementing Agency Private finance initiative is required. Kimpraswil and related local government 7. Estimated Investment Requirement 8. Special Considerations (in 2003 prices) - If not toll road, access should be controlled For Project cost in Total: Rp. 7,060 B - Private participation is prerequisite For Annual Recurrent O & M: Rp. 141 B/ann. 9. Environmental Impact 10. Location Map/Information/Drawings 1) Social Environment Refer to the attached map. - Resettlement necessity : B - Splitting community : B 2) Natural Environment - Unknown 3) Pollution - Air pollution : B - Noise and vibration : B AP2 - 4 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 AP2 - 5 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project Project Title Sector No. Depok Antasari Toll (JORR – 2nd JORR) × Road R-08a Railway Bus Traffic Management Project Location Project Priority Implementation Safety and Security Period Kota Depok Short-term Environment City Planning Medium-term 5 years Institution/Funding x Long-term 1. Summary of Objectives 2. Expected Benefits/Outputs - To establish High Mobility Highway - Providing alternative routes of toll road for users network - Strengthening mobility in the region - To solve the problem of missing link - Alleviating traffic congestion on the existing roads - To connect JORR and 2nd JORR 3. Project Description 4. Project Linkages/Other Sector Linkages - Construction of connecting toll road - Integration with 2nd JORR - Total length : 2.8 km 5. Important Assumptions/Conditions for 6. Implementing Agency the Project Private sector participation / PT. Jasa Marga Completion of 2nd JORR 7. Estimated Investment 8. Special Considerations Requirement (in 2003 prices) - Social impact by land acquisition For Project cost in Total: Rp. 1.433 B For Annual Recurrent O & M: Rp. 29 B/ann. 9. Environmental 10. Location Map/Information/Drawings Impact 1) Social Environment - Resettlement necessity: A - Splitting community: A 2) Natural Environment - Unknown 3) Pollution - Air pollution: B - Noise and vibration: B AP2 - 6 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project No. Project Title Sector R-09 Kalimalang Toll Road × Road Railway Bus Project Location Project Priority Implementation Traffic Management Period Kampung Melayu – Kota Bekasi Short-term Safety and Security Environment Medium-term 3 Years x City Planning Long-term Institution/Funding 1. Summary of Objectives 2. Expected Benefits/Outputs - To complete the interrupted road - Having an effective physical distribution - To provide smooth accessibility to the center of - Strengthening mobility for commuters Jakarta - Alleviating traffic congestion of existing road 3. Project Description 4. Project Linkages/Other Sector Linkages - Construction of interrupted highway - Sea port development - Total length : 13.9 km - Completion of JORR 5. Important Assumptions/Conditions for the Project 6. Implementing Agency . Private investor / PT. Jasa Marga 7. Estimated Investment Requirement 8. Special Considerations (in 2003 prices) - Analysis of possibility to use for public transportation For Project cost in Total: Rp. 2,066 B - Physical condition of interchanges For Annual Recurrent O & M: Rp. 41 B/ann. 9. Environmental Impact 10. Location Map/Information/Drawings 1) Social Environment - Resettlement necessity: D - Splitting community: D 2) Natural Environment - Unknown 3) Pollution - Air pollution: B - Noise and vibration: B AP2 - 7 PROPOSED PROJECT PROFILE for SITRAMP 2 Prepared by the JICA Study Team, Jan. 2004 Project No. Project Title Sector R-10, R-11, Road Widening for the Trunk Bus System X Road R-12, R-13, Railway R-14, R-15, of the existing roads to accommodate exclusive bus lanes Bus R-16, R-17, Traffic Management R-24, R-25, Safety and Security R-28 Environment City Planning Institution/Funding Project Location Project Priority Implementation Period Road widening for the Trunk Bus X Short-term R10: Jl. Perintis – Bekasi Raya X Medium-term Depends on the section. R11: Jl. Bekasi Raya to Cikarang X Long-term R12: Jl. Bogor Raya (1) R13: Jl. Raya (2) R14: Jl. Ciledug Raya R15: Jl. Daan Mogot (1) R16: Jl. Daan Mogot (2) R17: Jl. Serpong Raya R24: Jl. Fatmawati R25: Jl. Siliwangi R28: Jl. West side of Pulogadung 1. Summary of Objectives 2. Expected Benefits/Outputs - Road widening for the trunk bus system (busway) - Expanding service coverage of public transportation - Reducing private vehicular traffic and alleviating traffic congestion - Benefits by reducing operation and maintenance cost and savings

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us