Appendix 2 Stakeholder Engagement and Communications

Appendix 2 Stakeholder Engagement and Communications

Appendix 2

Stakeholder Engagement and Communications

December 2010

APPENDIX 2 Stakeholder Engagement and Communications December 2010

  • Prepared for:
  • Prepared by:

20 Bay Street, Suite 901 Toronto ON M5J 2N8

In Association with:

APPENDIX 2
STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS
TABLE OF CONTENTS

APPENDIX 2A: STAKEHOLDER ENGAGEMENT AND COMMUNICATION ......................................................1
1. STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS .................................................................1

1.4. Overview   of Engagement Methodology .................................................................................. . 2

2. STAKEHOLDER ENGAGEMENT HIGHLIGHTS TO DATE.......................................................................3

2.1. Non ‐ Government Stakeholder List and Study Database.......................................................... . 3 2.2. Electrification   Study Website .................................................................................................... 3 2.3. Stakeholder   Workshop # 1 . ....................................................................................................... 4 2.4. Metrolinx   Planning and Transportation Leaders Foru m . ......................................................... . 4 2.5. GO   Transit Customer Service Advisory Committee Meeting.................................................... . 4 2.6. Update   Meeting (Georgetown Corridor).................................................................................. . 4 2.7. Municipal   Transit Leaders Briefing ........................................................................................... 4 2.8. Government   Agency Consultations........................................................................................... 4 2.9. Stakeholder   Workshop # 2 . ....................................................................................................... 5 2.10. 2.11. 2.13. 2.14. 2.15. 2.16.
Community Advisory Committee Update Meeting .............................................................. . 5 Stakeholder Workshop # 3 . .................................................................................................... 5 Community Advisory Committee Update Meeting .............................................................. . 5 Stakeholder Workshop # 4 . .................................................................................................... 5 Media Briefing....................................................................................................................... 6 Technical Working Sessions .................................................................................................. 6

3. HIGHLIGHTS OF STAKEHOLDER FEEDBACK....................................................................................... 7
APPENDIX 2 B: STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS PLAN ..........................................1
1. INTRODUCTION.................................................................................................................................1

1.1. Backdrop   – The Electrification Study......................................................................................... 1 1.2. Overview   of the Stakeholder Engagement and Communications Plan.................................... . 1

2. GUIDING PRINCIPLES AND OBJECTIVES ............................................................................................ 3

2.1. Guiding   Principles...................................................................................................................... 3 2.2. Objectives................................................................................................................................. . 3

3. KEY STAKEHOLDER AUDIENCES FOR ENGAGEMENT ........................................................................4

3.1. Stakeholder   Engagement – A Key Part of the Study ................................................................ . 5 3.2. Outreach   and Engagement Methods........................................................................................ 5

4. ENGAGEMENT MECHANISMS BY AUDIENCE ....................................................................................6

4.1. Engaged   Non ‐ Government Stakeholders................................................................................. . 6 4.2. Government   Stakeholders And Industry Service Providers ...................................................... . 7

  • i
  • GO Electrification Study Final Report – Appendix 2 – December 2010

4.3. Users/Commuters   ..................................................................................................................... 8 4.4. General   Public ........................................................................................................................... 8 4.5. First   Nation s . ............................................................................................................................. 8

5. COMMUNICATIONS TACTICS TO SUPPORT ENGAGEMENT..............................................................9 6. ENGAGEMENT AND COMMUNICATIONS BY STUDY PHASE ...........................................................11 7. NEXT STEPS – EARLY IMPLEMENTATION OF THE PLAN ..................................................................14
APPENDIX 2C: STAKEHOLDER WORKSHOP #1 SUMMARY REPORT.............................................................1
1. ABOUT STAKEHOLDER WORKSHOP #1 ............................................................................................. 1 2. FORMAT OF THE WORKSHOP ........................................................................................................... 2 3. PRESENTATION HIGHLIGHTS............................................................................................................. 3

3.1. Welcome   and Overview ............................................................................................................ 3 3.2. Electrification   Of The Go Transit Rail Network ........................................................................ . 3

4. WORKING SESSIONS.......................................................................................................................... 7

4.1. Overview   .................................................................................................................................. . 7 4.2. Working   Session 1: Study Approach.......................................................................................... 7 4.3. Working   Session 2:   Study Objectives........................................................................................ 8 4.4. Feedback   on Priority Objective s . ............................................................................................... 9

5. NEXT STEPS .....................................................................................................................................11
APPENDIX 2C‐1: “ELECTRIFICATION OF THE GO TRANSIT RAIL NETWORK” POWERPOINT PRESENTATION
....................................................................................................................................................................13

APPENDIX 2C‐2: SAMPLE WORKSHEET.......................................................................................................15 APPENDIX 2C‐3: SUBMITTED GROUP WORKSHEETS ..................................................................................19 APPENDIX 2C‐4: SUBMITTED INDIVIDUAL WORKSHEETS..........................................................................27 APPENDIX 2D: UPDATE MEETING GEORGETOWN CORRIDOR SUMMARY REPORT ....................................1
1. ABOUT THE ELECTRIFICATION STUDY UPDATE MEETING – GEORGETOWN CORRIDOR..................1

1.1. Purpose   .................................................................................................................................... . 1 1.2. Attendance............................................................................................................................... . 1 1.3. Format...................................................................................................................................... . 1

2. SUMMARY OF COMMENTS RECEIVED.............................................................................................. 2

2.1. Study   Approac h . ........................................................................................................................ 2 2.2. Technology   Alternatives Screening Process ............................................................................. . 2 2.3. Air ‐ Rail Link (ARL)...................................................................................................................... 3 2.4. Air   Quality ................................................................................................................................ . 4

3. NEXT STEPS .......................................................................................................................................5
APPENDIX 2D‐1: UPDATE MEETING INVITATION.......................................................................................... 7

  • ii
  • GO Electrification Study Final Report – Appendix 2 – December 2010

APPENDIX 2D‐2: ELECTRIFICATION STUDY BACKGROUNDER.....................................................................11 APPENDIX 2D‐3: “ELECTRIFICATION STUDY UPDATE MEETING” POWERPOINT PRESENTATION ..............13 APPENDIX 2D‐4: QUESTION & ANSWER PERIOD ........................................................................................15 APPENDIX 2E: MUNICIPAL TRANSIT LEADERS BRIEFING SUMMARY NOTES ...............................................1 APPENDIX 2F: STAKEHOLDER WORKSHOP #2 SUMMARY REPORT .............................................................1
1. ABOUT STAKEHOLDER WORKSHOP #2 ............................................................................................. 1

1.1. Purpose   .................................................................................................................................... . 1 1.2. Attendance............................................................................................................................... . 1 1.3. Format...................................................................................................................................... . 1

2. SUMMARY OF COMMENTS RECEIVED.............................................................................................. 3

2.1. Study   Approac h . ........................................................................................................................ 3 2.2. Rolling   Stock Technology Assessment and Network Options................................................... . 3 2.3. Proposed   Approach for Further Assessment of Options .......................................................... . 4 2.4. General   Comments.................................................................................................................... 4

3. NEXT STEPS .......................................................................................................................................5
APPENDIX 2F‐1: WORKSHOP PRESENTATION............................................................................................... 7 APPENDIX 2F‐2: QUESTION AND ANSWER PERIOD ..................................................................................... 9 APPENDIX 2F‐3: SAMPLE WORKSHEET .......................................................................................................17 APPENDIX 2F‐4: SUBMITTED GROUP WORKSHEETS..................................................................................21 APPENDIX 2F‐5: SUBMITTED INDIVIDUAL WORKSHEETS ..........................................................................25 APPENDIX 2F‐6: WORKSHOP INVITATION AND ATTENDANCE LIST..........................................................31 APPENDIX 2F‐7: FORMER COMMUNITY ADVISORY COMMITTEE UPDATE REPORT...................................35 APPENDIX 2G: STAKEHOLDER WORKSHOP #3 SUMMARY REPORT.............................................................1
1. ABOUT STAKEHOLDER WORKSHOP #3 ............................................................................................. 1

1.1. GO   Transit Electrification Study ................................................................................................ 1 1.2. Stakeholder   Workshop # 3 . ........................................................................................................ 1

2. WORKSHOP PRESENTATION DISCUSSION ........................................................................................ 3 3. SUMMARY OF COMMENTS RECEIVED.............................................................................................. 6

3.1. Study   Approac h . ........................................................................................................................ 6 3.2. Rolling   Stock Technology Option s . ............................................................................................ 6 3.3. Network   Options ....................................................................................................................... 6 3.4. Proposed   Approach for Detailed Assessment of Options......................................................... . 6 3.5. Parallel   Studies and Project s . .................................................................................................... 7 3.6. General   Comments.................................................................................................................... 8

4. NEXT STEPS .......................................................................................................................................8

  • iii
  • GO Electrification Study Final Report – Appendix 2 – December 2010

APPENDIX 2G‐1: WORKSHOP POWERPOINT PRESENTATION.......................................................................9 APPENDIX 2G‐2: SAMPLE WORKSHEET......................................................................................................11 APPENDIX 2G‐3: SUBMITTED GROUP WORKSHEETS..................................................................................15 APPENDIX 2G‐4: SUBMITTED INDIVIDUAL WORKSHEETS...........................................................................21 APPENDIX 2G‐5: WORKSHOP INVITATION AND ATTENDANCE LIST ...........................................................27 APPENDIX 2H: FORMER COMMUNITY ADVISORY COMMITTEE MEETING..................................................1 APPENDIX 2I: STAKEHOLDER WORKSHOP #4 .............................................................................................. 1
1. ABOUT STAKEHOLDER WORKSHOP #4 ............................................................................................. 1

1.1. GO   Transit Electrification Study ................................................................................................ 1 1.2. Stakeholder   Workshop # 4 . ........................................................................................................ 1

2. SUMMARY OF COMMENTS RECEIVED.............................................................................................. 2

2.1. ARL   ........................................................................................................................................... . 2 2.2. Tier   4 ........................................................................................................................................ . 3 2.3. Union   Station ............................................................................................................................ 3 2.4. Air   Quality, Health, and Community Impacts .......................................................................... . 3 2.5. Noise   Impacts............................................................................................................................ 4 2.6. Capital   and Operations/Maintenance Cost s . ........................................................................... . 4 2.7. Implementation.........................................................................................................................   4 2.8. General   Comments.................................................................................................................... 5

3. NEXT STEPS .......................................................................................................................................5
APPENDIX 2I‐1: WORKSHOP POWERPOINT PRESENTATION .......................................................................7 APPENDIX 2I‐2: QUESTION AND ANSWER DISCUSSION SUMMARY.............................................................9 APPENDIX 2I‐3: SAMPLE WORKSHEET ........................................................................................................ 21 APPENDIX 2I‐4: SUBMITTED INDIVIDUAL WORKSHEETS ..........................................................................25 APPENDIX 2I‐5 WORKSHOP INVITATION AND ATTENDANCE LIST............................................................37 APPENDIX 2J: ISSUES/RESPONSE TABLE ...................................................................................................... 1

  • iv
  • GO Electrification Study Final Report – Appendix 2 – December 2010

Appendix 2A

Stakeholder Engagement and Communications

December 2010

APPENDIX 2A Stakeholder Engagement and Communications December 2010

  • Prepared for:
  • Prepared by:

20 Bay Street, Suite 901 Toronto ON M5J 2N8

In Association with:

APPENDIX 2A: STAKEHOLDER ENGAGEMENT AND COMMUNICATION 1. STAKEHOLDER ENGAGEMENT AND COMMUNICATIONS 1.1. Introduction

Determining how GO Transit Trains will be powered in the future is an important decision – one that requires an examination of benefits and costs of the various technology options, as well as consideration of community values and priorities. Metrolinx recognized the importance of engaging stakeholders as part of the Electrification Study process. Prior to the commencement of the Electrification Study, Metrolinx formed a multidisciplinary, geographically diverse Community Advisory Committee (CAC) that assisted in the preparation of the study Terms of Reference. These Terms of Reference called for the development of a comprehensive “proactive stakeholder engagement and communication plan” as well as implementation of a stakeholder engagement process that would “consider, document and consolidate feedback by impacted GO Transit stakeholders.”

1.2. Stakeholder Engagement Strategy

Building on the direction in the study Terms of Reference, the study team worked with Metrolinx staff to develop a comprehensive Stakeholder Engagement and Communications Plan for the Electrification Study. This plan outlined how Metrolinx and the study team would reach out to and engage GTHA stakeholders during the development of the study in order to:

•

Educate stakeholders about the study process and electrification options, such that they can provide informed feedback during the study; and

•

Facilitate input from stakeholders throughout the study process, in order to inform decision‐making and study conclusions.

The stakeholder plan was specifically developed to address the key principles – objective, comprehensive, inclusive and evidence based – that were established for the study by Metrolinx, in consultation with the CAC. The plan was also designed to ensure that GTHA stakeholders are provided with the opportunity to contribute focused feedback on key outputs identified by Metrolinx and the CAC for the study.

1.3. Guiding Principles for Stakeholder Engagement

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    352 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us