Sample Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [This is the first procurement plan) 2. Date of General Procurement Notice: April 25, 2017 3. Period covered by this procurement plan: September 2016 to June 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Public Disclosure Authorized Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) NA 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA 5. ICB and LIB (Non-Consultant Above US$ 1,500,000 All Services) 6 NCB (Non-Consultant Services) NA Public Disclosure Authorized [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [CDD project implementation Manual to be issued by DRDIP PIU, MoANR for Bank approval) 4. Reference to (if any) Project Operational/Procurement Manual: DRDIP Procurement Manual to be issued by DRDIP PIU. Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: NA 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive July 9, 2010 financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descriptio Estimate Packages Dome Review Commen No. n d stic by Bank ts Cost Prefer (Prior / US$ ence Post) million (yes/n o) Summary NA NA NA NA of the ICB (Works) Summary 6.69 4 No Prior of the ICB (Goods) Summary 3.8 9 No Post All of the NCB (Works) Summary 14.70 14 No Post All of the NCB (Goods) Summary NA NA NA NA of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Commentes Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: NA 4. Consultancy Assignments with Selection Methods and Time Schedule July 9, 2010 1 2 3 4 5 6 Ref. No. Description Estimate Packages Review Comments of d by Bank Assignment Cost (Prior / US$ Post) million Summary 0.35 2 Prior of number of contracts that will be let under QCBS Summary 1.4 38 Post LCS/ IC of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Eastern Africa : Development Response to Displacement Impacts Project in the HoA PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-10-26 Revised Plan Date(s): (comma delineated, leave blank if none)2021-03-15 Project ID: P152822 GPN Date: Project Name: Development Response to Displacement Impacts Project in the HoA Loan / Credit No: IDA / 58330 Executing Agency(ies):Agence Djiboutienne de Development Social WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned COMP1/T1/2017 / Travaux d'extension de 5 salles de Social and Economic Services Single Stage - One 2018-12- IDA / 58330 A posteriori Appel d'offres Open - National 325,070.00 375,984.42 Signé 2018-02-10 2018-09-24 2018-02-17 2018-03-31 2018-11-07 2018-04-30 2018-12-04 2018-06-04 2018-12-13 Lycée et réhabilitation du and Infrastructure Envelope 01 dortoir à Obock COMP1/T3/2017 / Travaux Social and Economic Services Single Stage - One En attente 2018-09- de raccordement pecherie IDA / 58330 A posteriori Appel d'offres Open - National 450,704.00 0.00 2017-11-20 2017-11-27 2018-01-08 2018-02-07 2018-03-14 and Infrastructure Envelope d'exécution 10 d'Obock COMP1/T8/2017 / construction de locaux Social and Economic Services Single Stage - One 2018-11- IDA / 58330 A posteriori Demande de prix Limited 101,408.00 95,992.16 Signé 2018-03-17 2018-10-22 2018-05-12 2019-01-13 communautaire/communautai and Infrastructure Envelope 08 re à Ali addé COMP1/T9/2017 / Réhabilitation du local Social and Economic Services Single Stage - One 2018-10- IDA / 58330 A posteriori Demande de prix Limited 40,000.00 33,579.56 Signé 2018-02-17 2018-10-22 2018-04-14 2019-01-13 communautaire (UNFD) à Holl- and Infrastructure Envelope 11 Holl COMP2/T1/2017 / rénovation et renforcement de Social and Economic Services Single Stage - One En attente 2018-06- perimetres existants d'où 5 IDA / 58330 A posteriori Demande de prix Limited 135,211.00 0.00 2017-11-01 2017-12-27 and Infrastructure Envelope d'exécution 25 reservoirs , 5 puits , 5 champs solaires pour Obock DJ-ADDS-29135-CW-RFB / Social and Economic Services Single Stage - One En attente 2018-06- Travaux extention du centre IDA / 58330 A posteriori Appel d'offres Open - National 399,493.00 0.00 2017-10-31 2017-11-05 2017-12-05 2018-02-08 and Infrastructure Envelope d'exécution 08 de santé à Obock DJ-ADDS-29136-CW-RFB / rehabilitation/ extention du Social and Economic Services Single Stage - One En attente 2018-08- IDA / 58330 A posteriori Appel d'offres Open - National 436,620.00 0.00 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 centre de santé Ali addé et and Infrastructure Envelope d'exécution 07 Hol Hol en 2 lots séparés DJ-ADDS-29129-CW-DIR / Passation de Travaux d'extension Résau/ Social and Economic Services 1,188,375.0 2019-04- IDA / 58330 A priori marché de gré à Direct 1,188,371.09 Signé 2017-09-19 2019-05-14 2017-10-04 2020-09-23 2017-10-27 2017-12-21 Electricité d'Obock et Holl- and Infrastructure 0 25 gré Holl 004/2017/TVX/IDA- PRDDCA/ADDS / avenant n°1 Passation de au marché des travaux Social and Economic Services 210,936,565. 2019-09- IDA / 58330 A priori marché de gré à Direct 0.00 Annulé 2019-02-21 2019-02-26 2019-04-02 d'électrification Holhol et and Infrastructure 00 29 gré extension réseau electrique d'Obock COMP1/T5/2017 / F+P et raccordement des installations électriques des Social and Economic Services Single Stage - One 2018-05- logements, locaux IDA / 58330 A posteriori Appel d'offres Open - National 241,392.00 324,046.72 Signé 2017-10-31 2018-03-29 2017-11-07 2017-12-07 2018-05-02 2018-01-06 2018-06-20 2018-02-10 2018-06-25 and Infrastructure Envelope 11 commerciaux et établissements publics à Holl- Holl COMP4/T1/2019 / Travaux Project Management, and Single Stage - One 2020-06- de construction d'une salle IDA / 58330 A posteriori Appel d'offres Open - National 185,915.00 143,370.91 Signé 2019-09-08 2019-10-21 2019-09-13 2019-10-25 2019-12-11 2019-11-24 2020-01-27 2019-12-29 2020-02-02 Monitoring and Evaluation Envelope 26 d'archives COMP1/T7/2017 / Travaux Social and Economic Services Single Stage - One En cours 2020-06- de construction d'une piste en IDA / 58330 A posteriori Appel d'offres Open - National 662,423.00 0.00 2019-09-08 2018-11-01 2019-09-13 2021-01-19 2019-10-25 2019-11-24 2019-12-29 and Infrastructure Envelope d'exécution 26 pierres taillées (voiries Obock) COMP1/T6/2017 / Travaux de construction de logements Social and Economic Services Single Stage - One En attente 2018-05- de fonction et réhabilitation IDA / 58330 A posteriori Appel d'offres Open - National 1,616,902.00 0.00 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 and Infrastructure Envelope d'exécution 09 de l’école primaire et collège de Holl Holl. COMP2/T2/2017 / Social and Economic Services Single Stage - One En attente 2018-06- rénovation et renforcement de IDA / 58330 A posteriori Demande de prix Limited 186,183.00 0.00 2017-11-01 2017-12-27 and Infrastructure Envelope d'exécution 25 perimetres existants pour Holhol COMP2/T3/2017 / rénovation et renforcement de Social and Economic Services Single Stage - One En attente 2018-06- perimetres existants d'où 5 IDA / 58330 A posteriori Demande de prix Limited 149,000.00 0.00 2017-11-01 2017-12-27 and Infrastructure Envelope d'exécution 25 reservoirs , 5 puits, 5 champs solaires pour Ali Addé COMP1/T1/2019 / Travaux Passation de de réhabilitation et Social and Economic Services En attente 2020-04- IDA / 58330 A posteriori marché de gré à Direct 87,417.00 0.00 2019-09-08 2019-09-13 2019-10-18 d'extension du Centre de and Infrastructure d'exécution 15 gré Santé de Holl Holl.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us