ESIA of Block VI Lignite Mining Project

ESIA of Block VI Lignite Mining Project

Environmental and Social Impact Assessment Block VI Lignite Mining Project Volume 2 of 3 (Appendices A to H) Sindh Carbon Energy Limited R3E03TCO April 2013 Hagler Bailly Pakistan Wardell Armstrong International Ltd. ESIA of Block VI Lignite Mining Project Appendix A: SCEL’s Policies A.1 Environmental Policy Statement Oracle Coalfields and its subsidiaries are engaged in mining activities and principally in the development of a surface coal mine in the Sindh Province of Pakistan. We acknowledging that our business has an impact on the environment and we are committed to managing and reducing that impact through the adoption of the following policy, which requires us to: Identify and comply with all legislation, standards and codes of practice, which are relevant to our businesses activities; Continue to improve our environmental performance through effective communication, provision of staff training and adoption of best techniques available; Use energy and fossil fuels efficiently so as to reduce our carbon emissions; Prevent pollution incidents; Reduce the amount of waste generated by our activities, sites and premises and the percentage that is sent to landfill; Conserve water by reducing demand at our sites and premises; Be a respectful neighbor by minimizing the impact that our activities, sites and premises have on local communities; Protect and, where feasible, enhance biodiversity on sites and premises where we hold responsibility or can influence those that do; Seek to influence our clients to adopt, and our designers to provide, solutions that benefit the environment; Promote, as far as is practicable, responsible sourcing and the purchase of materials and services that through their use, sourcing or manufacture have the least harmful effect on the environment; Minimize the need to travel, but where travel is unavoidable use modern and efficient modes of transport; Work with our Supply Chain to help them improve their own environmental performance. Hagler Bailly Pakistan Appendix A R3E03TCO: 04/30/13 A-1 ESIA of Block VI Lignite Mining Project Senior management will review this policy annually and establish environmental objectives and targets that are consistent with the company’s current policy commitments. This Environmental Policy Statement will be communicated to all staff and a copy placed on the Oracle Coalfields Website. Signed by the CEO Organisational Responsibilities The Board shall: 2.1.1 Have collective overall responsibility for Safety, Health and Environmental (SHE) matters; 2.1.2 Ensure they receive adequate training to maintain their knowledge and understanding of current SHE duties; 2.1.3 Identify and understand the significant risks created by Oracle’s changing and expanding activities in so far as these might adversely affect the safety and health of our workforce and others, and the environment; 2.1.4 Support and assist the Chief Executive in their role by providing strategic direction for the effective management of SHE responsibilities and review and endorse SHE strategies; 2.1.5 Ensure the development of SHE documentation based upon risk assessment that meets legal requirements and industry best practice, and is in accordance with Oracle’s SHE policy and its associated arrangements; 2.1.6 Ensure that an Occupational Health Strategy is established which will include appropriate health surveillance, sickness absence management and rehabilitation and return to work arrangements; 2.1.7 Take the lead in ensuring the effective communication of SHE duties and the benefits of good performance in this regard; 2.1.8 Ensure that suitable resources and strategic direction to discharge Oracle’s SHE responsibilities is provided; 2.1.9 Set the Group’s objectives and review performance against them; 2.1.10 Appoint a Director from among their number at Board level who shall be the focus for reporting to the relevant board on SHE matters to include incident data and preventive information; 2.1.11 Ensure arrangements are in place to assess and monitor the performance of Oracle’s suppliers and contractors/subcontractors; 2.1.12 Review the overall performance and effectiveness of Oracle’s SHE management system, and ensure arrangements are made for any significant weaknesses to be addressed; Hagler Bailly Pakistan Appendix A R3E03TCO: 04/30/13 A-2 ESIA of Block VI Lignite Mining Project 2.1.13 Ensure staff and their representatives are involved and consulted on relevant SHE matters and ensure that their views are considered; 2.1.14 Review and amend this policy as appropriate A.2 Health and Safety Policy Statement Oracle Coalfields and its subsidiaries are committed to providing a work environment that is safe and healthy for all employees and those affected by our activities. Oracle Coalfields operations shall be carried out so as to ensure, so far as is reasonably practicable, that the Health, Safety or Conditions of any person or property will not be adversely affected. The Board is actively committed to the provision of strong and active leadership in such matters, the engagement of the workforce in the promotion and achievement of safe and healthy conditions and the formal assessment and review of performance. The Board will provide adequate resources, information and training to ensure that the Management can deliver the objectives set by the Board for continuous improvement throughout the business. This Policy is implemented via the Oracle Coalfields Health & Safety Management System. The requirements of the Health & Safety Policy are communicated to all employees and the involvement of all individuals within Oracle Coalfields in the management of health and safety is actively promoted through effective consultation and involvement. The Health, Safety and Welfare of all employees and those who may be affected by our work is an integral part of our business performance. Compliance with legal requirements should be achieved at all times, and no breaches should be tolerated. The Board shall review this policy and associated Management System, periodically taking action if necessary to ensure its effectiveness and compliance with changes in the nature of Oracle Coalfields operations and structure, legislation, best practice and procedures. Signed by the CEO Hagler Bailly Pakistan Appendix A R3E03TCO: 04/30/13 A-3 ESIA of Block VI Lignite Mining Project Appendix B: Baseline Methodology B.1 Aims, Application and Scope The main aim of the ESIA baseline stage is the collection of appropriate environmental and social information which characterises existing conditions at the project in sufficient detail to enable impact predictions and assessments to be carried out. The impact assessment process at conceptual mine development stage affords the opportunity to avoid, minimise or mitigate negative impacts to an acceptable level prior to generation. It also allows benefits (positive impacts) to be maximised. At this stage one of the most effective ways to achieve this is via modification to proposed infrastructure (location and engineering design) prior to construction. It is therefore important that the ESIA baseline programme is compatible with the FS timeline and is sufficient in scope and applicability for detailed design considerations. The FS has been undertaken by SRK Consulting Ltd (SRK) and an iterative process of design and assessment has been promoted during the preparation of the ESIA and Feasibility studies so that environmental and social issues are considered within planning. Baseline information and data on the present status and condition of the environment and socio-economy was obtained from a range of sources, which are described in detail under the appropriate topic in the following chapters. The sources of information, principally supplied by Islamabad-based Hagley Bailly Pakistan (HB), fall into the following general categories: Primary field data collected by HB with input by WAI and/or RPS Aquaterra or SRK, specifically for the ESIA; Secondary archive data obtained from published sources, local statistical records and other available governmental data; and Qualitative data and relevant information provided by HB and other in-country experts, based in experience and local knowledge. Details of the specialists comprised in the ESIA team is given below Exhibit B.1. Hagler Bailly Pakistan Appendix B R3E03TCO: 04/30/13 B-1 ESIA of Block VI Lignite Mining Project Exhibit B.1: Environmental and Social Specialists Engaged in Oracle ESIA Company Name Specialty Role Qualification WAI Kim-Marie Clothier Environmental Science Project Manager MRes John Eyre Mining Project Director FRICS CEnv Dr Magnus Macfarlane Social science Review and analysis of social and socio-economic PhD Sociology data SRK Dr Ruth Warrender Geochemist ARD testwork and analysis PhD Dr Matt Day Principal Geochemist Kinetic testwork and analysis PhD William Harding Principal Prepartion of hydrogeological report Hydrogeologiist Richard Connelly Assoc. Consultant - Review of hydrogeology data Hydrogeology Fiona Cessford Environmental Science Corporate Consultant Environment Hagler Bailly Hidayat Hasan Principal Review of physical and socioeconomic baseline MSc, Physics Environmental reports Scientist Vaqar Zakaria Principal Review of ecological baseline report MS Chemical Engineering Environmental Scientist Dr Mohammad Rafique Ecologist Collection of ecological field data – fauna PhD Zoology Noor Kamal Khan Ecologist Collection of ecological field data – flora MSc Plant Science Ghulam Murtaza Ecologist

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    343 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us